Notice of Meeting with Union Electric Company to Discuss a Proposed Risk Informed Change to Callaway, Unit 1, Technical Specifications
ML092460559
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/04/2009
From: Thadani M
Plant Licensing Branch IV
To: Markley M
Plant Licensing Branch IV
Thadani, M C, NRR/DORL/LP4, 415-1476
References
Download: ML092460559 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 4, 2009 MEMORANDUM TO: Michael T, Markley, Chief Plant Licensing Branch LPL-IV Division of Operating Reactor Licensing FROM: Mohan C. Thadani, Senior Project Manager Plant Licensing Branch LPL-IV Division of Operating Reactor Licensing

SUBJECT:

FORTHCOMING MEETING WITH UNION ELECTRIC COMPANY DATE & TIME: Thursday, September 17, 2009 Time 8:30 a.m. 10:30 a.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room 0-3B4 Rockville, Maryland PURPOSE: The purpose of the meeting is to discuss a proposed risk informed change to the Callaway Plant, Unit 1, Technical Specifications (TS) that would establish a Completion Time of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for restoring an inoperable Balance-of-Plant Engineered Safety Feature Actuation System train in TS 3.3.2, "Engineered Safety Feature Actuation System,"

Condition Q. The Licensee will also discuss its plans for future adoption of initiative 4b of the NRC policy on risk informed Technical Specifications.

CATEGORY:

  • This is a Category 1 meeting. The public is invited to participate in this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

MEETING CONTACTS: Mohan C. Thadani, NRR Balwant K. Singal, NRR 301-415-1476 301-415-3016 mohan.thadani@nrc.gov balwant.singal@nrc.gov

'Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings" (67 FR 36920), May 28, 2002.

M. Markley -2 PARTICIPANTS: Participants from the !\IRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Union Electric Company (UE)

D. Harrison NRR S. Maglio LIE G. Casto NRR T. Elwood LIE A. Howe NRR D. Shafer LIE B. Marcus NRR D. Martin LIE M. Thadani NRR H. Bing LIE et al. B. Yates LIE NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket No. 50-483

Enclosure:

Agenda cc w/encl: Distribution via Listserv

AGENDA FORTHCOMING MEETING WITH UNION ELECTRIC COMPANY Meeting on Thursday, September 17, 2009 Time 8:30 AM - 10:30 PM

  • Introductions
  • Callaway's Integrated Plan to Transition to Risk-Managed Technical Specifications (TSs)
  • Balance of Plant Engineered Safety Features Actuation System Design and Power Supply Issues
  • License Amendment Request - Draft TSs and Bases Changes
  • Questions and Answers
  • Comments from Public
  • Adjourn Enclosure

M. Markley - 2 PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC Union Electric Company (UE)

D. Harrison NRR S. Maglio UE G. Casto NRR T. Elwood UE A. Howe NRR D. Shafer UE B. Marcus NRR D. Martin UE M. Thadani NRR H. Bing UE et al. B. Yates UE The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),

please notify one of the NRC's meeting contacts. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involve/listserver/plants-by-region.html.

Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.

Docket No. 50-483

Enclosure:

Agenda cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC RidsNrrDorlLpl4 RidsRgn4MailCenter LTrocine, EDO LPI-4 rtf RidsNrrPMCallaway DHarrison, NRR VDricks, OPA Region IV RidsAcrsAcnwMailCTR RidsNrrLAJBurkhardt AHowe, DRAIAPLA OWFN Receptionist RidsNrrAdro RidsOgcMailCenter RMarcus, NRR TWFN Receptionist RidsNrrDorl RidsOpaMail CTucci, NRR PMNS ADAMS Accession No. ML092460559 *Concurred via email OFFICE DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM JBurkhardt NAME MThadani BClayton for MMarkley* MThadani DATE 9/3/09 9/3/09 9/4/09 9/4/09 I OFFICIAL RECORD COpy