ML23121A011

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Revise TS to Adopt TSTF-501-A Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control - EPID L-2023-LLA-0046
ML23121A011
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/28/2023
From: Mahesh Chawla
NRC/NRR/DORL/LPL4
To: Elwood T
Ameren Missouri
References
L-2023-LLA-0046
Download: ML23121A011 (3)


Text

From: Mahesh Chawla Sent: Friday, April 28, 2023 6:00 PM To: Elwood, Thomas B Cc: Jennifer Dixon-Herrity; Khadijah West; Vic Cusumano

Subject:

Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-501-A Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control" - EPID L-2023-LLA-0046

Dear Mr. Elwood,

By letter dated March 29, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23088A118), Union Electric Company dba Ameren Missouri (the licensee), submitted a license amendment request for Callaway Plant, Unit 1. In the application, Ameren Missouri (Union Electric Company), requests an amendment to the Technical Specifications (TS) for Callaway Plant. The proposed amendment would modify TS requirements in Section 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air. Specifically, Technical Specification (TS) 3.8.3 would be revised such that the numerical volume requirements/limits specified for stored diesel fuel oil and lube oil inventory, as specified in the Limiting Condition for Operation (LCO), Actions and Surveillance Requirements for TS 3.8.3, would be replaced with descriptive "7 day" and "6 day" supply requirements/limits where applicable. This request is consistent with TSTF-501-A, Revision 1, "Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control."

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an application for an amendment to a license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is April 28, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me. Thanks

Mahesh Chawla, Project Manager Licensing Branch, LPL 4 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Phone: (301) 415-8371 Email: Mahesh.Chawla@nrc.gov Hearing Identifier: NRR_DRMA Email Number: 2064

Mail Envelope Properties (SA1PR09MB8415DC60F0744E1224285D32F16B9)

Subject:

Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-501-A Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control - EPID L-2023-LLA-0046 Sent Date: 4/28/2023 5:59:37 PM Received Date: 4/28/2023 5:59:37 PM From: Mahesh Chawla

Created By: Mahesh.Chawla@nrc.gov

Recipients:

"Jennifer Dixon-Herrity" <Jennifer.Dixon-Herrity@nrc.gov>

Tracking Status: None "Khadijah West" <Khadijah.West@nrc.gov>

Tracking Status: None "Vic Cusumano" <Victor.Cusumano@nrc.gov>

Tracking Status: None "Elwood, Thomas B" <TElwood@ameren.com>

Tracking Status: None

Post Office: SA1PR09MB8415.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 4223 4/28/2023 5:59:37 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: