Letter Sequence Approval |
---|
|
|
MONTHYEARML15139A4842015-06-0202 June 2015 Staff Review of Callaway Plant Unit 1 Physical Security Plan Revision 12 for the Verification of ASM (EA-13-237) Incorporation (TAC No. L25009) Project stage: Approval 2015-06-02
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21216A2002021-08-11011 August 2021 Summary of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission 2020 Annual Assessment of Callaway Plant Docket No. 50-483 ML21111A0372021-05-0303 May 2021 Inspection Manual Chapter 0375 Recommendation for Callaway Plant ML20112F3112020-04-29029 April 2020 Summary of April 16, 2020 Public Meeting with Nuclear Development, LLC, Regarding Its Response to Staff'S Request for Additional Information ML19291B5212019-10-29029 October 2019 Summary of a Public Meeting with Nuclear Development, LLC, Regarding Request for Construction Permit Transfer and Related Activities for the Bellefonte Nuclear Plant on October 3, 2019 ML18232A3262018-09-0404 September 2018 Summary of a Public Pre-Submittal Meeting with Nuclear Development, LLC, on the Bellefonte Nuclear Generating Station, Units 1 and 2 ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML17170A3202017-06-20020 June 2017 Safety Evaluation Input - for Ameren Missouri Request to Amend Callaway Plant, Unit 1, Technical Specification 5.6.5, Core Operating Limits Report - ML16197A0102016-08-22022 August 2016 Staff Observations of Testing for Generic Safety Issue 191 During a June 28 to June 30, 2016 Trip to the Alden Test Facility for Performance Contracting Inc. Strainer Tests ML16091A1522016-03-31031 March 2016 Request to Review and Update Guidance in National Fire Protection Association (NFPA) 805 Frequently Asked Question (FAQ) 07-0040 ML15139A4842015-06-0202 June 2015 Staff Review of Callaway Plant Unit 1 Physical Security Plan Revision 12 for the Verification of ASM (EA-13-237) Incorporation (TAC No. L25009) ML14310A8362015-02-0909 February 2015 NRC Staff Evaluation of Final Rule for Continued Storage of Spent Nuclear Fuel for the License Renewal Environmental Review for Callaway, Unit 1 ML14177A5952014-07-0808 July 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plant, Un ML14183A0212014-07-0101 July 2014 License Renewal Application ML14121A5532014-06-18018 June 2014 November 25, 2013, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14121A1062014-05-12012 May 2014 Advisory Committee on Reactor Safeguards Review of the Callaway Nuclear Plant License Renewal Application - Safety Evaluation Report ML14112A2762014-05-0707 May 2014 Summary of Public Meetings to Discuss Draft Supplement 51 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Callaway Plant, Unit 1 ML14104A8932014-04-23023 April 2014 U.S. Nuclear Regulatory Commission Staff'S Spot- Check Review of Ameren Missouri'S 100 Percent Ownership Interest in Callaway Energy Center, Docket No. 50-483, on April 8, 2014- Finding of No Potential Issue ML14087A2102014-04-0808 April 2014 Summary of 3/25/14 Verbal Relief Telephone Conference, Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14035A5752014-03-25025 March 2014 January 28, 2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, LRA ML13246A3072013-09-0909 September 2013 Memorandum to File - Verbal Authorization of Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval ML13151A2602013-06-25025 June 2013 Bellefonte, Unit 1, Tennessee Valley Authority Notice of Forthcoming Public Meeting to Discuss the Regulatory Framework Regarding Site Seismology ML13126A3202013-05-0707 May 2013 Summary of Telephone Conference, Verbal Authorization of Relief Request I3R-14. Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year ISI Interval. ML13059A8002013-03-11011 March 2013 Summary of Telephone Call Held on 11/5/12, Between NRC and Union Electric Company, Regarding Request for Clarification of Responses to the SAMA RAI Concerning Callaway Plant, Unit 1, LRA ML13035A1942013-02-0707 February 2013 Notice of Meeting with Tennessee Valley Authority to Discuss Bellefonte Nuclear Plant, Unit 1, Digital Instrumentation and Control System Design ML12298A4282012-10-26026 October 2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1 ML12292A1212012-10-22022 October 2012 Updated ETE Quarterly Report for Q4 2012 ML12262A3112012-10-0202 October 2012 Summary of Telephone Conference Call Held on September 14, 2012, Between NRC and Union Electric Company, Concerning the SAMA RAI for the Callaway Plant, Unit 1, LRA ML12234A5232012-08-24024 August 2012 Quarterly Report of Activity Related to Updated Evacuation Time Estimates ML12227A3472012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 ML12227A3492012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1 ML12194A4662012-07-13013 July 2012 7/26/2012 Notice of Forthcoming Meeting with Tennessee Valley Authority, Bellefonte Nuclear Plant, Unit 1 ML12167A5082012-06-15015 June 2012 Letter to the Honorable Jeannette Mott Oxford Related to the 10/21/2003, Shutdown at Callaway Plant ML1211502472012-05-0303 May 2012 Memo to File, Verbal Authorization, Relief Request VR-01 from Requirements of ASME OM Code Mandatory Appendix I, One-time Extension Replacement of Main Steam Isolation Valve Actuator Rupture Disks ML12089A0992012-04-11011 April 2012 Summary of Public Scoping Meetings Conducted Related to the Review of the Callaway Plant, Unit 1 License Renewal Application ML12041A4792012-02-24024 February 2012 03/14/2012-Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Callaway Plant, Unit 1 ML12027A0202012-01-27027 January 2012 Acceptance of License Renewal Application, Callaway Plant Unit 1 ML1200300872011-12-29029 December 2011 Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Blocking P-4/Low Tavg Feedwater Isolation Signal at Callaway Plant, Unit 1 ML1136304032011-12-29029 December 2011 Correction Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 ML11350A2512011-12-20020 December 2011 Canceled - Notice of Forthcoming Meeting with Tennessee Valley Authority, to Discuss Tennessee Valley Authority (TVA) Plans Regarding Site Seismology at Bellefonte Nuclear Plant, Unit 1 ML11336A2952011-12-0606 December 2011 Notice of Forthcoming Meeting with Tennessee Valley Authority, Bellefonte Nuclear Plant, Unit 1, to Discuss Plans Regarding Site Seismology ML1131200872011-11-16016 November 2011 Verbal Authorization Memorandum, Relief Request 13R-13, Alternative to Requirements for Performance of Second Successive Exam of C Cold Leg Safe-End to Elbow Weld, Third 10-Year Inservice Inspection ML11192A2362011-07-12012 July 2011 Notice of Closed Meeting with Callaway to Discuss Lessons Learned from the Recent Triennial Force-On-Force Exercise at the Callaway Nuclear Power Plant IR 05000483/20110072011-06-27027 June 2011 IR 05000483-11-007, on 03/21-05/13/11, Callaway Plant, Special Inspection for Turbine-driven Auxiliary Feedwater Pump Bearing Degradation ML1114506732011-05-26026 May 2011 July 14, 2011 Notice of Forthcoming Meeting with Tennessee Valley Authority (TVA) to Discuss Bellefonte Nuclear Plant, Unit 1, Digital Instrumentation and Control and Human Factors ML1113202252011-05-12012 May 2011 Notice of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1's Amendment Request to Adopt Risk-informed, Performance-Based Alternative Described in National Fire Protection Association Standard (NFPA) 805 ML1136103072011-05-0404 May 2011 CW-2011-06-Public Forms ML1109501212011-04-0505 April 2011 Notice of Meeting to Discuss NRC Reactor Oversight Process Annual Assessment of Callaway Plant ML1104001662011-02-22022 February 2011 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions 2022-06-06
[Table view] |
Text
June 2, 2015 MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Branch Chief /RA/
Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF CALLAWAY PLANT UNIT 1 PHYSICAL SECURITY PLAN REVISION 12 FOR THE VERFICATION OF ASM (EA-13-237) INCORPORATION (TAC NO. L25009)
The staff has completed its review of Callaway Plant Unit 1 Physical Security Plan (PSP)
Rev.12 which was submitted by the Union Electric Company to the U.S. Nuclear Regulatory Commission (NRC) by letter dated April 16, 2015.
Based on our review, we find the submitted PSP to be acceptable and the Callaway Plant PSP has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation (10 CFR), Section 73.55, and the Additional Security Measures imposed by NRC Order EA-13-137.
A physical security inspection (IR Nos. 05000483/2015401 AND 07201045/2015401) was completed on April 30, 2015 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs observations, the Callaway Plant PSP has met the performance objectives and general requirements outlined in 10 CFR Section 73.55 and the Additional Security measures (ASMs) imposed by the NRC.
Docket Nos. 50-438, 72-1045 CONTACT: Douglas Garner (301) 287-0929
MEMORANDUM TO: Patricia A. Silva, Chief Inspections and Operations Branch Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards FROM: Sandra Wastler, Branch Chief /RA/
Materials Waste Security Branch Division of Security Policy Office of Nuclear Security and Incident Response
SUBJECT:
STAFF REVIEW OF CALLAWAY PLANT UNIT 1 PHYSICAL SECURITY PLAN REVISION 12 FOR THE VERFICATION OF ASM (EA-13-237) INCORPORATION (TAC NO. L25009)
The staff has completed its review of Callaway Plant Unit 1 Physical Security Plan (PSP)
Rev.12 which was submitted by the Union Electric Company to the U.S. Nuclear Regulatory Commission (NRC) by letter dated April 16, 2015.
Based on our review, we find the submitted PSP to be acceptable and the Callaway Plant PSP has met the applicable performance objectives and general requirements outlined in Title 10 of the Code of Federal Regulation (10 CFR), Section 73.55, and the Additional Security Measures imposed by NRC Order EA-13-137.
A physical security inspection (IR Nos. 05000483/2015401 AND 07201045/2015401) was completed on April 30, 2015 which verified the PSP successfully meets the objectives outlined in IP 81311. Based on staffs observations, the Callaway Plant PSP has met the performance objectives and general requirements outlined in 10 CFR Section 73.55 and the Additional Security measures (ASMs) imposed by the NRC.
Docket Nos. 50-438, 72-1045 CONTACT: Douglas Garner (301) 287-0929 DISTRIBUTION:
DSP r/f Adams Accession No.: ML15139A484 OFFICE DSP/MWSB MWSB/BC NAME D. Garner S. Wastler DATE 06/01/15 06/01/15 OFFICIAL RECORD COPY