April 2023 Emergency Preparedness Exercise Inspection - Request for Information
ML23037A709
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/06/2023
From: Sean Hedger
NRC Region 4
To: Harris D
Ameren Corp
References
IR 2023001, IR 2023002
Download: ML23037A709 (1)


Text

ADAMS Accession# ML23037A709 From: Sean Hedger To: Harris, Daniel T Cc: Wiltman, Timothy R; Forland, Thomas J; Rauch, Gerald P

Subject:

RFI for Callaway Plant EP Exercise Inspection (April 2023)

Date: Monday, February 06, 2023 9:36:00 AM Attachments: RFI for CWY EP Exercise Insp Apr 2023 Final.pdf Mr. Harris, Mr. Wiltman:

This e-mail serves to transmit a request for information to support and prepare for the Emergency Preparedness (EP) Exercise inspection at Callaway Plant, scheduled to occur the week of April 17, 2023.

By design, the biennial EP Exercise inspection includes the use of Inspection Procedures (IP) 71114.01, 71114.04, 71114.08, and 71151, to assess the overall health and maintenance of the stations EP program during the inspection year when the biennial EP Program inspection is not conducted. Details of the requested materials are included in the attachment to this e-mail. As noted in the attached, if possible, please make the requested materials available to me in electronic format using the online document portal of the stations choice, by the dates stated within the attachment. If you are unable to complete the request by this date, please contact me at the phone number listed below to discuss alternative options.

This letter/e-mail does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

This email and its enclosures will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sean D. Hedger Senior Emergency Preparedness Inspector US Nuclear Regulatory Commission, Region IV (817)200-1556

Request for Information for EP Exercise and Performance Indicator Verification Inspection Docket 05000483 (Callaway Plant) Inspection Reports 2023001 and 2023002 Inspection Procedures 71114.08, 71114.01, 71114.04, and 71151 Draft Scenario In-Office Review: February 17 - March 18, 2023 Onsite/Inspection Week: April 17 - 21, 2023 Please provide the following to support the inspection consistent with the methods and timeframes listed for each.

1) IP 71114.08: Exercise Evaluation - Scenario Review a) The licensee will be submitting the draft exercise scenario package to the NRC, with the 60-day submission due date of 02/17/2023. The inspectors will conduct a review of the scenario over the coming weeks in accordance with IP 71114.08.

The NRC Lead Inspector will schedule a teleconference to communicate the inspectors comments and observations associated with the review of the scenario no later than 30 days prior to the exercise. A plan is being developed to conduct a teleconference providing comments between March 6 and 17, 2023.

b) Provide a copy of all Extent of Play agreements associated with the April 18, 2023, plume phase exercise once they are available.

2) IP 71114.01: Exercise Evaluation a) First day of Onsite Inspection (04/17/2023) - Please provide hard/paper copies of the final, full Exercise Manual, one copy per inspector (4 total).

b) First day of Inspection (04/17/2023) - Provide a single hard copy document of the current site Emergency Plan and complete set of Emergency Plan Implementing Procedures. These will be used/referenced by the inspection team and returned at the conclusion of the exercise inspection week.

c) No later than 8:00 AM on Wednesday, 04/19/2023 (morning after the exercise) - Provide copies of all documents generated by participants (players, controllers, and evaluators) in the conduct of the exercise on 04/18/2023, separated by Emergency Response Facility (preferred).

Items 2.d - 2.f may be provided prior to the onsite inspection via the electronic portal of the stations choosing, in hard copy for review starting on the first day of inspection, or combination thereof (whichever is more readily available and convenient for the station):

d) Copies of all Drill and Exercise reports since CY2021, including standalone drills, team drills, dress-rehearsals, etc.

e) In addition, a copy of the 2019 and 2021 Biennial EP Exercise Reports (if not provided as part of Item 2.d).

f) Listing of all EP-related Corrective Action Documents/CRs generated since CY2021, in a sortable/searchable format. (Specific full CR documents may be subsequently requested based on sampling and review by the inspectors.)

3) IP 71114.04: EAL and Emergency Plan Changes Items 3.a - 3.c are requested to be provided approximately two weeks prior to the onsite inspection (04/03/2023) via the electronic portal of the stations choosing:

a) Copy of the 50.54(q) procedure (current revision) b) Listing of all of 50.54(q) reviews and screens performed since November 2022.

c) Copy of all 50.54(q) evaluations completed since November 2022.

4) IP 71151: PI Verification (ERO Participation, DEP, and ANS) - ANNUAL review a) Please provide the applicable EP-related Performance Indicator data for:

4th Quarter 2022 through 1st Quarter 2023 (2 quarters)

The bulleted items below include materials and data that licensees may maintain in support of the collection and reporting of the EP-related Performance Indicators. The list is illustrative and may not be all inclusive. In general, the inspectors are requesting access to the specific materials and data that Callaway Plant used to report the EP indicators.

Any information provided may be done so prior to the onsite inspection via the electronic portal of the stations choosing, in hard copy for review starting on the first day of inspection, or combination thereof (whichever is more readily available and convenient for the station):

  • Station procedure(s) for EP Performance Indicator data collection and submission.
  • List of the DEP opportunities used in developing the PI values for the 2 quarters.
  • All supporting documentation used to assess the DEP opportunities in the 2 quarters, which may include: (a) Drill/Exercise/LORT session reports, (b) actual declared emergency reports/assessments (if any), and (c) copies of notification forms associated with each of the DEP opportunities.
  • Quarterly qualification rosters (or similar) for the key ERO members who were included in the ERO Participation data for the 2 quarters.
  • Qualification records for the key ERO members who were included in the ERO Participation date for the 2 quarters.
  • If not included in the supporting documentation for DEP opportunities (5th bullet above), drill/exercise attendance records and any other supporting documentation used to develop the reported ERO participation PI data for 2 quarters.

Items 4.b - 4.c are requested to be provided approximately two weeks prior to the onsite inspection (04/03//2023) via the electronic portal of the stations choosing:

b) Listing of all CRs related to DEP opportunity failures during the 2 quarters, in a sortable/searchable format.

c) Listing of all CRs related to ERO qualification issues/deficiencies during the 2 quarters, in a sortable/searchable format.

If there are any challenges or questions related to providing the requested materials, please contact the lead inspector (Sean Hedger, phone: 817-200-1556), at the stations earliest convenience.

This request does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.