MEMORANDUM TO:
FROM:
SUBJECT:
DATE & TIME:
LOCATION:
PURPOSE:
CATEGORY 1:*
PARTICIPANTS:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 14, 2012 Michael T. Markley, Chief Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Carl F. Lyon, Project Manager
~--Q,.~1 'b.~~ -C-Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FORTHCOMING PRE-APPLICATION MEETING WITH REPRESENTATIVES OF UNION ELECTRIC COMPANY (TAC NO. ME9234)
Wednesday, August 29, 2012 9:00 a.m. to 11 :00 a.m. EDT U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 0-7B4 Rockville, Maryland Union Electric Company (the licensee) will meet with the U.S. Nuclear Regulatory Commission (NRC) staff to discuss its planned submittal of an amendment request for Callaway Plant, Unit 1, to revise Technical Specification 3.7.9, "Ultimate Heat Sink," to incorporate more restrictive limits for the minimum required ultimate heat sink retention pond level and temperature, as specified in Surveillance Requirement (SR) 3.7.9.1 and SR 3.7.9.2, respectively.
This is a Category 1 public meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion. but before the meeting is adjourned.
Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC Union Electric Company M. Markley K. Sturzebecher S. Maglio R. Andreasen G. Casto J. McHale J. Little M. Smith J. Thorp F. Lyon, et. al.
T. Elwood M. Hamm B. Yates
- Commission's Policy Statement on "Enhancing Public Participation in NRC Meetings* (67 FR 36920), May 28, 2002.
M. Markley
- 2 Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please call one of the meeting contacts listed below by August 28,2012,3:00 p.m. ((::astern Daylight Time) to get the telephone number and the pass code.
MEETING CONTACTS: Fred Lyon, NRR 301-415-2296 Fred. Lyon@nrc.gov Lauren Gibson, NRR 301-415-3016 Lauren.Gibson@nrc.gov The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in a meeting, or need a meeting notice or a transcript or other information from a meeting in another format (e.g., Braille, large print),
please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
To receive a summary of this meeting and begin receiving other plant-specific e-mail distributions, you must subscribe to the Operating Reactor Correspondence electronic distribution for this plant via http://www.nrc.gov/public-involvellistserver/plants-by-region.htm!.
Once subscribed, if you wish to discontinue receiving electronic distribution, you may unsubscribe at any time by visiting the same web address above.
Docket No 50-483
Enclosure:
Agenda cc w/encl: Distribution via Listserv
AGENDA FORTHCOMING PRE-APPLICATION MEETING BElWEEN UNION ELECTRIC COMPANY AND U.S. NUCLEAR REGULATORY COMMISSION VVednesday,Augu&29,2012 9:00 a.m. - 11 :00 a.m. EDT
- 1.
Introductions
- 2.
Licensee presentation and discussion on its planned amendment request to revise Technical Specification 3.7.9, "Ultimate Heat Sink," to incorporate more restrictive limits for the minimum required ultimate heat sink (UHS) retention pond level and temperature, as specified in Surveillance Requirement (SR) 3.7.9.1 and SR 3.7.9.2, respectively. A new/additional SR will be proposed, and proposed changes to the Final Safety Analysis Report will be included in the amendment application as well.
A presentation will be given to address various aspects of this planned amendment request. including the following:
Resolution of limiting single-failure issue identified for the UHS Basis for revised UHS retention pond temperature and level limits Changes to procedural control of cooling tower operation Operator actions (with time limits) credited for the above Use of GOTHIC 7.2(b) model for thermal performance analysis in support of proposed changes
- 3.
Questions (NRC staff)
- 4.
Public participation
- 5.
Closing remarks Enclosure