Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23362A057 | 28 December 2023 | NRR E-mail Capture - Callaway Plant, Unit 1 - SUNSI Review of the Final Safety Analysis Report (FSAR) Revision OL-26 | |
ML23338A039 | 1 December 2023 | NRR E-mail Capture - LIC-109 Acceptance Review - Unacceptable with Opportunity to Supplement - Callaway - RR from Requirements of ASME BPV Code, Section Xl, Subsect IWL-Exam & Test-Unbonded Post Tensioning System - EPID L-2023-LLR-0061 | |
ML23208A105 | 27 July 2023 | NRR E-mail Capture - Callaway Plant, Unit No. 1 - Regulatory Audit Questions - LAR to Clarify Support System Requirements for the Residual Heat Removal & Control Room Air Conditioning Systems | High winds Probabilistic Risk Assessment Operability Determination |
ML23200A298 | 19 July 2023 | NRR E-mail Capture - Callaway Plant, Unit 1 - Final Request for Additional Information (RAI) - Request for Approval of Oqam, Revision 36a - EPID L-2023-LLQ-0000 | |
ML23121A011 | 28 April 2023 | NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Revise TS to Adopt TSTF-501-A Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control - EPID L-2023-LLA-0046 | |
ML23114A230 | 24 April 2023 | NRR E-mail Capture - Regulatory Audit Question - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 | Exemption Request Fuel cladding |
ML23107A181 | 17 April 2023 | NRR E-mail Capture - Regulatory Audit Questions - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 | Exemption Request Fuel cladding |
ML23096A007 | 5 April 2023 | NRR E-mail Capture - Final Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request to Revise TS 5.5.16 for Permanent Extension of Integrated Leak Rate Testing - EPID L-2022-LLA-0165 | Incorporated by reference Moisture barrier |
ML23073A026 | 13 March 2023 | NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - SG Inspection Report Review - EPID L-2022-LRO-0143 | |
ML23037A709 | 6 February 2023 | April 2023 Emergency Preparedness Exercise Inspection - Request for Information | |
ML23037A002 | 3 February 2023 | NRR E-mail Capture - Callaway - LAR to Adopt AST - EPID L-2021-LLA-0177 - Revised Schedule for Completion of the Project | |
ML23026A021 | 24 January 2023 | NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Changes to TS for SFP - | |
ML23010A290 | 10 January 2023 | NRR E-mail Capture - LIC-109 Acceptance Review - Callaway Plant, Unit 1 - License Amendment Request to Clarify Support System Requirements for the RHR & Crac Systems - | |
ML22346A013 | 9 December 2022 | NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of LAR to Revise TS 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies - EPID L-2022-LLA-0165 | |
ML22322A006 | 17 November 2022 | NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) Callaway - LAR for Proposed Changes to TS and Exemption Request Use of Framatome Gaia Fuel - L-2022-LLA-0150 & L-2022-LLE-0030 | Exemption Request Fuel cladding |
ML22287A095 | 14 October 2022 | NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 | |
ML22280A132 | 7 October 2022 | NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway - License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-0 | |
ML22278A012 | 4 October 2022 | NRR E-mail Capture - Draft - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway License Amendment Request for Proposed Changes to Tech Spec Changes for Spent Fuel Pool Storage - EPID L-2022-LLA-013 | |
ML22269A431 | 26 September 2022 | November 2022 Emergency Preparedness Program Inspection - Request for Information | |
NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004) | 12 September 2022 | EN 55999 Valcor Coil Shell Assemblies Final Notification (004) | |
ML22251A012 | 7 September 2022 | NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections - EPID L-2022-LLA-0110 | |
NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009) | 18 July 2022 | EN 55999 - Valcor Engineering Corporation (009) | |
ML22216A007 | 8 July 2022 | NRR E-mail Capture - Callaway Plant, Unit No. 1 - Draft Acceptance Review (Unacceptable for Review with Opportunity to Supplement) for Framatome Fuel Transition LAR and Exemption - EPIDs L-2022-LLA-0083 and L-2022-LLE-0019) | |
ML22167A025 | 15 June 2022 | NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - LAR for Proposed Revision to Radiological Emergency Response Plan Regarding Response & Notification Goals - EPID L-2022-LLA-0024 | |
ML22157A010 | 3 June 2022 | NRR E-mail Capture - NRC Acceptance Review of Braidwood Ultimate Heat Sink Temporary Temperature Increase to 102.8 Degrees Fahrenheit | Ultimate heat sink |
ML22154A012 | 2 June 2022 | NRR E-mail Capture - Final - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 | |
ML22151A051 | 27 May 2022 | NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report License Renewal |
ML22137A029 | 16 May 2022 | NRR E-mail Capture - Draft - Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications - EPID L-2021-LLA-0177 | |
ML22096A023 | 5 April 2022 | NRR E-mail Capture - Callaway Plant - Final RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to GL 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) | |
ML22089A022 | 29 March 2022 | NRR E-mail Capture - Callaway Plant, Unit 1 - LAR to Adopt TSTF-505 and TSTF-439 - Follow Up Clarifications for the Audit Questions - EPID L-2021-LLA-0197 | Offsite Circuit |
ML22087A402 | 28 March 2022 | NRR E-mail Capture - Callaway - Draft RAIs - License Amendment and Regulatory Exemptions for a Risk-Informed Approach to Address Generic Safety Issue - 191 and Respond to Generic Letter 2004-02 (EPIDs L-2021-LLA-0059 and L-2021-LLE-0021) | |
ML22070A136 | 10 March 2022 | NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request for Proposed Revision to Radiological Emergency Response Plan Regarding Response and Notification Goals - EPID L-2022-LLA-0024 | |
ML22047A231 | 11 February 2022 | Email Between NRC NSIR and FEMA Regarding Callaway Sirens 021122 | |
ML22003A085 | 3 January 2022 | NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-529, Clarify Use and Application Rules - EPID L-2021-LLA-0225 | |
ML21334A517 | 30 November 2021 | NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of Requested Licensing Action - Application to Adopt TSTF-439 and TSTF-505 - EPID L-2021-LLA-0197 | |
ML21335A017 | 30 November 2021 | NRR E-mail Capture - Callaway Plant, Unit 1 - LIC-109 Acceptance of Requested Licensing Action - Application to Adopt TSTF-439 and TSTF-505 - EPID L-2021-LLA-0197 | |
ML21308A069 | 4 November 2021 | NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Unit 1 - License Amendment Request - Adoption of Alternate Source Term and Revision of TSs - | |
ML21258A038 | 14 September 2021 | NRR E-mail Capture - Final - Request for Additional Information - Callaway, Unit 1 - LAR to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors- EPID L-2020-LLA-023 | Probabilistic Risk Assessment Thermoset Large early release frequency |
ML21195A025 | 13 July 2021 | Email 7-13-21 Request for Information - Callaway EP Exercise Inspection - Sept 2021 | Coronavirus |
ML21125A045 | 4 May 2021 | NRR E-mail Capture - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) - Callaway Plant, Unit 1 - License Amendment Request - Final Resolution to Address Concerns of GSI-191 - EPID L-2021-LLA-0059 | |
ML21007A162 | 6 January 2021 | NRR E-mail Capture - Final - Request for Additional Information - (COVID-19) Callaway Plant, Unit 1 - Additional Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs - EPID L-2021-LLE-0242 | Fitness for Duty Coronavirus |
ML20342A180 | 6 December 2020 | NRR E-mail Capture - Callaway - LIC-109 Acceptance Requested Licensing Action - Application to Adopt 10 CFR 50.69, Risk-Informed Categorization & Treatment of Structures, Systems & Components for Nuclear Power Reactors EPID L-2020-LLA-0235 | |
ML20296A633 | 22 October 2020 | NRR E-mail Capture - Callaway Plant, Unit 1 - Exemption from Certain Requirements of 10 CFR Part 73, Appendix B, General Criteria for Security Personnel, Section VI (EPID L 2020 Lle 0140 (Covid 19)) - Revised Completion Schedule | Exemption Request |
ML20205L425 | 22 July 2020 | NRR E-mail Capture - Callaway Plant, Unit 1 - Acceptance of Requested Licensing Action Request for One-Time License Amendment to Defer Upcoming Steam Generator Inspection (EPID L-2020-LLA-0142)(COVID-19) | Coronavirus |
ML20203M368 | 21 July 2020 | NRR E-mail Capture - Draft Request for Additional Information - Callaway Plant, Unit 1 - License Amendment Request - Revision to Technical Specification (TS) 5.3.1 and Deletion of TS 5.3.1.1 and 5.3.1.2 - EPID L-2020-LLA-0046 | Safe Shutdown |
ML20162A188 | 10 June 2020 | Request for Supporting Information for the Callaway SPRA Audit Review - Draft Supplement | Mission time Probabilistic Risk Assessment FLEX Large early release frequency |
ML20153A790 | 29 May 2020 | Emai: RFI for Callaway EP Program Inspection | Coronavirus |
ML20133K674 | 11 May 2020 | 05000483, Request for Information 2020-002 | COVID-19 |
ML20099G242 | 8 April 2020 | NRR E-mail Capture - Acceptance Callaway Containment Tendon COVID-19 Relief Request | Coronavirus |
ML20097C836 | 6 April 2020 | NRR E-mail Capture - Accepted: Callaway TS Change 5.3.1 LAR EPID: L-2020-LLA-0046 |