. NRC MONTHLY OPERATING REPORT DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE: e-14-vu COMPLETED tsi. _T. M. Sarette TELEPHONE:-- DM) 368-9335 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear'Generatina Station. Unit 2
- 2. Reporting ~ Period: July 1990
- 3. Licensed Thermal Power (MWt):- 3390
- 4. Namep1ateRating'(GrossMWe): 1127
- 5. Design. Electrical Rating (Net.MWe): 1070 .;
6.- Maximum Dependable Capacity (Gross MWe): 1127 7.1MaximumDependableCapacity;(NetMWe): 1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through .7) ,
Since Last Report, Give Reasons: NA H
- 9. Power Level To Whkh Restricted. If Any-(Net MWe): NA -l
' 10. Reasons For. Restrictions, If Any: NA !
-This Month Yr.-to-Date ' Cumulative
- 11. Hours In Reporting Period . 744.00- 5.087.00' 60,960.00'
- 12. Number Of Hours Reactor.Was Critical. 583.85 4.892.02 43.958.86- ,
- 13. Reactor Reserve Shutdown Hours- 0.00 -0.00 0.00 l 14 . - Hours Generator On-Line' 583.57 4.885.47 43.028.50 i
- 15. Unit Reserve. Shutdown Hours. 0.00 0.00 0.00- 1 16.. Gross Thennal Energy Generated-(MWH) 2.030.084.19 16.475.821.59 140.410.850.91
- 17. Grost 'ctrical Energy Generated (HWH) 642.143.50 . 5.608--783 50 47.583.490.50 l 18. Net tiet.. ical Energy Generated '(MWH) ~ 606.548.00 5.347.550.00 45.090.394.'24 ,
- 19. Unit Service Factor 78.44% 96.04% 70.58% '
- 20. Unit Availability Factor 78.44%- 96.04% 70.58%' i
- 21. UnitCapacityFactor-(UsingMDCNet) 76.19%- - 98.24% -. -69.13% i
- 22. Unit Capacity Factor (Using DER Net) 76.19% 98.24%;- 69.13%
23' . Unit Forced Outage Rate . . 9.98% ' 1.31% __ -6.11%. 1 24.- Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration =of.Each):-
1 A Steam Generator Insoection commenced on July 28. 1W 0. Outaae' duration is l forecast'for 34 days.
- 25. If Shutdown At End Of Report Period, Estimated Dece of Startup: Auaust 31.-1990' a
- 26. Units In; Test Status (Prior .To. Commercial ~ Opera *. ion): Forecast Achieved INITIAL CRITICALITY NA: NA ,,
INITIAL ELECTRICITY -NA- ' NA .{:
COM4ERCIAL OPERATION- NA NA !!
1 I
i l
1 i
9008220047 900814 PDR ADOCK 0500036.1 .
R PDC J
]
-LAVE 2 AGE DAILY UNIT POWER LEVELL 50-361' DOCKET NO:
LUNIT NAME: SONGS - 2 11 DATE: 8-14-90
CMPLETED BY: T. M. Sarette TELEPHONE: (714) 368-9335 '
y MONTH: Julv 1990 l DAY AVERAGE DAILY POWER LEVEL' DAY ' AVERAGE DAILY POWER' LEVEL (MWe-Net) -(MWe-Net)
- 1. 1049.42 1039.25 1
2 1005.73 18. 1047.90' 1 3 0.00 19 1045.50 4 0.00 20- 1031.04 5 0.00 -21 1045.48 6 7.63 22- 1039.58 7 877.19- 23; 1046.19
.. ~
1027.35 8 24 1038.96' 9 1048.71 25 1045.10 i 10 1042.79 26 1048;85 y
11 1041.54 '27 651 *9 .i a
12 1036.29 28. 0.00 ,
1 13- 1045.73 29 0.00- !
14 1035.48 30 'O.00 {
15 1033.02 -31 0.00 $
I 16 1037.46-
=
q
.f f 1
, 1 v ,
. . . _ . 9
UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO:' 50-361-
. UNIT NAME: SONGS --2 REPORT r10 NTH: JULY'1990 DATE:. 3-1~-90 -
COMPLETED BY: T. N. Sarette TELEPHONE: (714) 368-9335 Method of Shutting Cause & Corrective Duration Down LER- System Component Action to 2
No. Date Type 2 (Hours) Reason Reactor3 No. Code' Code' Prevent Recurrence 56 900703 F 64.68 B 5 NA SJ .PSX Power reduction of greater than 20% to repair a steam leak in a
, main feedwater bypass line.
lhe leak was repaired.
57 900727 S 0.00 -B 5 NA KE CONO Power reduction of 20%'cr greater to' perfom heat treating operations for the circulating water tunnels.
58 900728 S 95.75 B 1 NA NA fiA The reactor was tripped from.-
15% power in preparation for the scheduled steam generator inspection outage.
1 2 F-Forced Reason: . ' Method: IEEE Std 805-1984 S-Scheduled A-Equipment Failure'(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.-
C-Refueling '3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Ex' amination Previous Month F-Administrative 5-Reduction of 20% S IEEE Std 803A-1983 G-Operational-Error.(Explain) or greater:in the -
H-Other (Explain) past 24' hours 6-Other(Explain)
- e. . . _ . . - . - - . _ .a . - ..- - = = = - - - = _ . . - . . - -
- _ - ... J
+ l~
_SU M ARY.0F OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-361 -
UNIT NAME: SONGS - 2 e DATE: 8-14-90 ;
COMPLETED BY: T. M. Sarette i TELEPHONE: (714) 368-9335 l
Datt ligt Event
~
July 1 0001 Uait'is in Mode 1 at 100%' reactor power.
' Turbine load at 1140 MWe gross.
c 1
July 2 2010 Commenecd reactor power decrease. for the feedwater . ;
bypass piping repair outage.- l July 3= 0124 Unit taken offline.- Commenced feedwater bypass pipingJ [
repair outage.
0917' Entered Mode 2. Reactor remained critical.. ;
July 5 1322 Entered Mode 1. ?
1805 Unit synchronized to the giid. Continued-reactor power increase.
July 7 0838- Reactor _.at 100% : power.
July 27 0040. Commenced reactor power decrease; to 80%.for circulating .
water system heat treatment. #
0315- Reactor at 80% power.
1738 Commenced reactor shutdown-for the steam generator ;
(; inspection:outape.' ,
July-28 0015 Unit taken off line.
1 0032 Manually trippec reactor' from 15% power.: ,
Entered Mode 3. ';
, July 29 0008 Entered Mode 4. :
i 1625 Entered Mode 5. t July 31 2400 Unit is in Mode 5,' day 3 of the scheduled steam ..
, generator inspection outage.
1 i.
t
_ . ~ . . .. -. - - . _ , . - -- -.- . . . _ - -
T
'r i
REFUELING INFORMATION -
,i I
DOCKET NO:- 50-361 UNIT NAME: SONGS - 2 DATE: 8-14-90 ,
COMPLETED BY:.. T. M. Sarette i TELEPHONE: (714) 368-9335- I 1
I l
- MONTH: Julv 1990
- 1. Scheduled date for next refueling. shutdown, forecast for July 1991. .
- 2. Scheduled date for restart following refueling.
Forecast for October 1991.
- 3. Will refueling or resumption of operation thereafter require a Technical-Specification change or other license amendment?
Not yet specifically determined. ' Under evaluation.
What will these be?
Not.yet specifically determined. :Under evaluation.=
- 4. Scheduled date for submitting proposed licensing' action and~ supporting information. 'f Not yet specifically determined._ Under evaluation.. ,
- 5. Important licensing considerations' associated with refueling, e.g. new or . !
different fuel design or supplier, unreviewed design or performance analysis i methods, significant changes in fuel design, new operating procedures.
Not yet specifically determined. Under evaluationL i
-1 l
]
I o
, .- .-. . . - Il
- p. > ;,
Y-REFUELING INFORMATION..
DOCKET NO: 50-361-UNIT NAME: SONGS - 2
.DATE: 8-14-90 COMPLETED BY: T.-M.- Sarette-
-TELEPHONE: (714) 368-9335-MONTH: July 1990-
- 6. The number of fuel assemblies.-
a) In_the core. 217 b) In the spent fuel storage. pool. 446 (376 Unit 2 Soent-Fuel Assemblies and 70 Unit 1 Spent Fuel Assemblies
- 7. Licensed spent fuel storage' capacity.- 1542
- Intended change in spent fuel storage capacity. None Expanded from 800.to 1542 by License Amendment No. 87 Facility. '
modification'is-scheduled to be completed by December 1990.-
8.-Projected date of 1ast refueling that can be discharged to spent fuel storage pool assuming present-capacity;-
Approximately-2001 (full off load capability)
I u
NRC MONTNLY OPERATING REPORT-DOCKET NO: 50-362 4 UNIT NAME: SONGS DATE: 14-90 COMPLETED BY:- T. M. Sarette TELEPHONE: . (714) 368-9335 l OPERATING STATUS-
- 1. Unit Name:: San Onofre Nuclear-Generatina Station. Unit 3
- 2. LReporting Period: -July 1990-l
- 3. Licensed Thermal Power (MWt): 3390 j
- 4. NameplateRating.(GrossMWe):- 1127-
- 5. Design Electrical Rating (Net MWe): 10C0
- 6. MaximumDependableCapacity'(GrossMWe):- 1127 _
4
- 7. Maximum Dependable Capacity (Net MWe): 1080 _ _
- 8. ~If Changes Occur. In Capacity Ratings (Items Number 3 furough 7) '
'Since Last' Report, G.ive Reasons:- ' a ' NA
- 9. Power Level To Which Restricted,. If Any (Net NWo}u,s :J- NA
- 10. . Reasons For Restrictions,:'If Any: NA 4
This Month Yr.-to-Date Cumulative
- 11. Hours-In Reporting. Period 744.00_ 5'.087.00 55.511'.00 i
- 12. Number Of Hours Reactor Was' Critical 330.58- 2.624.69-. 40.554.97 j
- 13. Reactor Reserve Shutdown Hours 0.00- 0.00 0.00
- 14. Hours Generator On-Line 209.23 2.487.41- 39.303.49 l~ '
- 15. Unit Reserve Shutdown Hours' 0.00< '
-0.00 0.00- 1 l
' 16 ', Gross Thermalx Energy Generated (HWH) 488.724.00- 7.985.342.89 123.853.099.44- l
- 17. Gross Electrical Energy Generated'(MWH): 191.719.50 -2.744.805.00n 42.029.516.50 1
- 18. - Net Electrical Energy Generated (MWH) 165.252.00 2.563.579.13 39.605.690.33 1
Unit' Service factor 48,90%
- 19. 28.12%-- 70.80% j
- 20. Unit: Availability Factor. 28.12%1 48.90% 70.80% 1
- 21. UnitCapacityFactor(Using_MOCNet) 20.57%- 46.66%-- 66.06% ;
.22. Unit Capacity Factor. (Using DER Net) 20.57% 46.66% 66.06% !
-23. Unit Forced Outage Rate 63.10%- 18.24%; 8.44% .i
- 24. Shutdowns Scheduled Over Next 6~ Months:(Type, Date,:and Duration of Each): l NONE 1
- 25. If Shutdown At End Of Report Period, Estimated Date:of Startup:- NA 4
- 26. Units In Test Status (Prior To Connercial Operation):~ -Forecast Achieved l INITIAL' CRITICALITY- NA- 'NA :
INITIAL ELECTRICITY NA NA i
' COMERCIAL' 0PERATION NA NA i
\ -
' _ -- . . . ~ --- _--- - -- . ..
.sy L) d . ,
AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO: 50-362 UNIT NAME: SONGS - 3 DATE: 8-14-90 COMPLETED BY: T. M. Sarette TELEPHONE: (714) 368-9335 MONTH: Julv 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.
(MWeMet) (MWe-Net)L 1 0.00- _ '17 0.00 2 0.00 18 0.00 3 0.00 -- 19 'O.00 _
4 0.00 20 0 '. 00 -
5 0.00 21 0.00 6 0.00 22 'O.00' 7 0.00 _ .23 71.17 8 0.00= 24 '570.13 9 0.00 25 770.06 10, 0.00 26 842.81 11.. 0.00 27. 954.17-12 0.00 28' -1041.04 13 0.00 29 1075.83:
14 0.00- 30- -1108.54
/' -15 0.00 31' 1120.46-16 0.00 1
l w -
~
M IT SHUTDOWNS AW POWER REDUCTIONS ~ DOCKET NO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH: JULY 1990 DATE: 8-14-90 ;J COMPLETED BY: T. M. Sarette'
-TELEPHONE: (714) 368-9335 Method of Shutting Cause & Corrective -
Duration Down LER System Component 1 Action to 2 3
-No. Date Type l '(Hours) Reason Reactor No. Code' Code' Prevent Recurrence 54 900414 .S. 534.77 C 4 NA NA NA Cycle 5 refueling: outage.'
I i.
L i
i 2 3
, F-Forced Reason:
Method: IEEE St/. 25-1984 S-Scheduled A-Equipment Failure (Explain) 1 ".anual S-Maintenance or Test 2-Manual Scram.
C-Refueling . .
' 3-Automatic Scram.
D-Regulatcry Restriction -- ..
'4-Continuation from E-Operator Training & License Examination -Previous Month' F-Administrative- 5-Reduction. of 20%.
S IEEE Std 803A-1983~
G-Operational Error"(Explain) 'or greater in the H-Other (Explain)- past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other'(Explain)-
- 1. ~
. . , . ._,_.__;_ 'M
) :-
SUM ARY OF OPERATING EXPERIENCE FOR THE' MONTH DOCKET NO:- 50-362: i UNIT NAME:- S0 HGS - 3 :
DATE:J 5-A-90 ;
COMPLETED BY: T. M. Sarette i TELEPHONE: (714) 368-9335 -
-[
DA.tt 11B1 fy_tD.t .
July 1- 0001- Unit is--in Mode 5 day 79 of the Cycle 5 Refu?'.ing outage.:
July 7 0745' Entered Mode 4.
July 14. 0610 . Entered Mode 3.
July 18 0345_ Connenced reactor startup.
0425 Entered Mode 2.,
0525 Reactor made critical. .Consenced low power physics
-testing.
July 20 2050 Entered Mode 1.
o i July 23 0646 Unit synchronized to the- grid. l 1650 Commenced-reactor power increase'at 3% per. hour.
July 25 1100 Reactor at 80% power.; ,
l July 27 0530~ Commenced reactor power-increase. d 2030 Reactor at 90%' power. j i
July'28 0440 Commenced reactor power increase to 100%. ,
.) :
l July 31 2400 Unit is in Mode 1 at'160% reactor-power. Turbine.. ;
load at 1156 MWe gross. ,
j a I 4
i u
j i
is l
! I i
REFUELING INFORMATION-
-DOCKET NO:. 50-362 UNIT NAME: SONGS - 3
. -DATE:' 8-14-90 l-COMPLETED BY: 1. Pi._Sarette-TELEPHONE: (714). 368-9335-l MONTH:' July 1990
- 1. Scheduled date for next' refueling shutdown.
Cycle 6 refueling outage is forecast for January 1992.
- 2. Scheduled date for-restart following. refueling.
Restart from Cycle 6 refueling' outage is _ forecast for April' 1992.
- 3. Will refueling or resumption of operation thereafter. require a Technical' Specification change or other license amendment?
Not yet specifically determined for. Cycle 6. Under evaluation, y What will-these be? l j
^Not yet specifically determined for Cycle-6. Under evaluation, d
- 4. Scheduled date for submitting proposed licensingLaction and supporting information. .]
q Not yet specifically determined:for Cycle 6...Under evaluation.
- 5. Important ' licensing considerations associated with refueling, e.g. new or different-fuel design or supplier, unreviewed design or. performance analysis methods, significant changes in fuel design,.new operating procedures. ~
. j Not yet specifically determined for Cycle 6. .Under evaluation.
- 1 l
l
,l q
i 1
1 D
n u. .- -- - - . , c ,n... sr..a.- - .- , n , - - .u...
f <
REFUELilNi INFORMATION DOCKET NO: 50-362 UNIT NAME:' SONGS - 3 DATE: 8-14-90 COMPLETED BY: T. M. Sarette-TELEPHONE:' (714) 368-9335 i-MONTH: .,Julv 1990
- 6. The number of fuel-assemblies..
a) In the core. 217 b) In the spent fuel storage pool.- 445'(376 Unit 3-Soent Fuel Assemblies and 69- ;
Unit 1 Soent Fuel Assemblies 1 l
.7. Licensed spent fuel storage capacity. 1542 * "
Intended change in spent fue1~ storage capacity.- .
None-
,
- Expanded from 800 to 1542 by License-Amendment No. 77 - Facility--
modification-is scheduled to be completed by September 1991. j l-l '8. Projected date'of last refueling that:can be discharged to spent-fuel storage <
. pool assuming present capacity.;
Approximately 2003 (full off load capability) f i
s l <