. NRC MONTHLY OPERATING REPORT DOCKET NO:
50-361 UNIT NAME:
SONGS - 2 DATE:
e-14-vu COMPLETED tsi. _T. M. Sarette TELEPHONE:-- DM) 368-9335 OPERATING STATUS 1.
Unit Name: San Onofre Nuclear'Generatina Station. Unit 2 2.
Reporting ~ Period: July 1990 3.
Licensed Thermal Power (MWt):-
3390 4.
Namep1ateRating'(GrossMWe):
1127 5.
Design. Electrical Rating (Net.MWe):
1070 6.-
Maximum Dependable Capacity (Gross MWe):
1127 7.1MaximumDependableCapacity;(NetMWe):
1070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through.7)
Since Last Report, Give Reasons:
NA H
9.
Power Level To Whkh Restricted. If Any-(Net MWe):
NA
-l
' 10. Reasons For. Restrictions, If Any:
NA
-This Month Yr.-to-Date
' Cumulative 11.
Hours In Reporting Period 744.00-5.087.00' 60,960.00' 12.
Number Of Hours Reactor.Was Critical.
583.85 4.892.02 43.958.86-13.
Reactor Reserve Shutdown Hours-0.00
-0.00 0.00 l
14. -
Hours Generator On-Line' 583.57 4.885.47 43.028.50 i
15.
Unit Reserve. Shutdown Hours.
0.00 0.00 0.00-1 16..
Gross Thennal Energy Generated-(MWH) 2.030.084.19 16.475.821.59 140.410.850.91 17.
Grost
'ctrical Energy Generated (HWH) 642.143.50. 5.608--783 50 47.583.490.50 l
18.
Net tiet.. ical Energy Generated '(MWH) ~
606.548.00 5.347.550.00 45.090.394.'24 19.
Unit Service Factor 78.44%
96.04%
70.58%
20.
Unit Availability Factor 78.44%-
96.04%
70.58%'
i 21.
UnitCapacityFactor-(UsingMDCNet) 76.19%-
- 98.24% -.
-69.13%
i 22.
Unit Capacity Factor (Using DER Net) 76.19%
98.24%;-
69.13%
23' Unit Forced Outage Rate 9.98%
' 1.31% __
-6.11%.
1 24.-
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration =of.Each):-
1 A Steam Generator Insoection commenced on July 28. 1W 0. Outaae' duration is l
forecast'for 34 days.
25.
If Shutdown At End Of Report Period, Estimated Dece of Startup: Auaust 31.-1990' a
26.
Units In; Test Status (Prior.To. Commercial ~ Opera *. ion):
Forecast Achieved INITIAL CRITICALITY NA:
NA INITIAL ELECTRICITY
-NA-
' NA
.{:
COM4ERCIAL OPERATION-NA NA 1
I i
l 1
i 9008220047 900814 PDR ADOCK 0500036.1 R
PDC J
]
-LAVE 2 AGE DAILY UNIT POWER LEVELL DOCKET NO:
50-361' LUNIT NAME: SONGS - 2 11 DATE:
8-14-90 CMPLETED BY:
T. M. Sarette TELEPHONE:
(714) 368-9335 y
MONTH: Julv 1990 DAY AVERAGE DAILY POWER LEVEL' DAY ' AVERAGE DAILY POWER' LEVEL (MWe-Net)
-(MWe-Net) 1.
1049.42 1039.25 2
1005.73 18.
1047.90' 1
3 0.00 19 1045.50 4
0.00 20-1031.04 5
0.00
-21 1045.48 6
7.63 22-1039.58 7
877.19-23; 1046.19
~
8 1027.35 24 1038.96' 9
1048.71 25 1045.10 i
10 1042.79 26 1048;85 y
11 1041.54
'27 651 *9
.i a
12 1036.29 28.
0.00 1
13-1045.73 29 0.00-14 1035.48 30
'O.00
{
15 1033.02
-31 0.00 I
16 1037.46-
=
q
.f f
1 1
v 9
UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO:' 50-361-
. UNIT NAME: SONGS --2 REPORT r10 NTH:
JULY'1990 DATE:. 3-1~-90 COMPLETED BY:
T. N. Sarette TELEPHONE:
(714) 368-9335 Method of Shutting Cause & Corrective Duration Down LER-System Component Action to 2
2 3
No.
Date Type (Hours)
Reason Reactor No.
Code' Code' Prevent Recurrence 56 900703 F
64.68 B
5 NA SJ
.PSX Power reduction of greater than 20% to repair a steam leak in a main feedwater bypass line.
lhe leak was repaired.
57 900727 S
0.00
-B 5
NA KE CONO Power reduction of 20%'cr greater to' perfom heat treating operations for the circulating water tunnels.
58 900728 S
95.75 B
1 NA NA fiA The reactor was tripped from.-
15% power in preparation for the scheduled steam generator inspection outage.
1 2
F-Forced Reason:
' Method:
IEEE Std 805-1984 S-Scheduled A-Equipment Failure'(Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.-
C-Refueling
'3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Ex' amination Previous Month S
F-Administrative 5-Reduction of 20%
IEEE Std 803A-1983 G-Operational-Error.(Explain) or greater:in the -
H-Other (Explain) past 24' hours 6-Other(Explain) e.
.a. -..- -
= = = - -
= _.
-... J
+
l~
_SU M ARY.0F OPERATING EXPERIENCE FOR THE MONTH DOCKET NO: 50-361 UNIT NAME: SONGS - 2 e
DATE:
8-14-90 COMPLETED BY:
T. M. Sarette i
TELEPHONE:
(714) 368-9335 Datt ligt Event July 1 0001 Uait'is in Mode 1 at 100%' reactor power.
~
' Turbine load at 1140 MWe gross.
c July 2 2010 Commenecd reactor power decrease. for the feedwater.
bypass piping repair outage.-
l July 3=
0124 Unit taken offline.- Commenced feedwater bypass pipingJ
[
repair outage.
0917' Entered Mode 2.
Reactor remained critical..
July 5 1322 Entered Mode 1.
?
1805 Unit synchronized to the giid. Continued-reactor power increase.
July 7 0838-Reactor _.at 100% : power.
July 27 0040.
Commenced reactor power decrease; to 80%.for circulating.
water system heat treatment.
0315-Reactor at 80% power.
1738 Commenced reactor shutdown-for the steam generator
(;
inspection:outape.'
July-28 0015 Unit taken off line.
1 0032 Manually trippec reactor' from 15% power.:
Entered Mode 3.
July 29 0008 Entered Mode 4.
i 1625 Entered Mode 5.
t July 31 2400 Unit is in Mode 5,' day 3 of the scheduled steam generator inspection outage.
i.
t
. ~
T
'r i
REFUELING INFORMATION
,i DOCKET NO:-
50-361 UNIT NAME:
SONGS - 2 DATE:
8-14-90 COMPLETED BY:..
T. M. Sarette i
TELEPHONE:
(714) 368-9335-
- MONTH:
Julv 1990
- 1. Scheduled date for next refueling. shutdown, forecast for July 1991.
- 2. Scheduled date for restart following refueling.
Forecast for October 1991.
- 3. Will refueling or resumption of operation thereafter require a Technical-Specification change or other license amendment?
Not yet specifically determined. ' Under evaluation.
What will these be?
Not.yet specifically determined. :Under evaluation.=
- 4. Scheduled date for submitting proposed licensing' action and~ supporting
'f information.
Not yet specifically determined._ Under evaluation..
- 5. Important licensing considerations' associated with refueling, e.g. new or.
different fuel design or supplier, unreviewed design or performance analysis i
methods, significant changes in fuel design, new operating procedures.
Not yet specifically determined. Under evaluationL i
-1 l
]
I o
Il
p.
Y REFUELING INFORMATION..
DOCKET NO:
50-361-UNIT NAME:
SONGS - 2
.DATE:
8-14-90 COMPLETED BY:
T.-M.- Sarette-
-TELEPHONE:
(714) 368-9335-MONTH:
July 1990-
- 6. The number of fuel assemblies.-
a)
In_the core.
217 b)
In the spent fuel storage. pool.
446 (376 Unit 2 Soent-Fuel Assemblies and 70 Unit 1 Spent Fuel Assemblies
- 7. Licensed spent fuel storage' capacity.-
1542
- Intended change in spent fuel storage capacity.
None Expanded from 800.to 1542 by License Amendment No. 87 Facility.
modification'is-scheduled to be completed by December 1990.-
8.-Projected date of 1ast refueling that can be discharged to spent fuel storage pool assuming present-capacity;-
Approximately-2001 (full off load capability)
I u
NRC MONTNLY OPERATING REPORT-DOCKET NO:
50-362 4
UNIT NAME:
SONGS DATE: 14-90 COMPLETED BY:- T. M. Sarette TELEPHONE:. (714) 368-9335 l
OPERATING STATUS-1.
Unit Name:: San Onofre Nuclear-Generatina Station. Unit 3
- 2. LReporting Period: -July 1990-l 3.
Licensed Thermal Power (MWt):
3390 j
4.
NameplateRating.(GrossMWe):-
1127-5.
Design Electrical Rating (Net MWe):
10C0 6.
MaximumDependableCapacity'(GrossMWe):-
1127 4
7.
Maximum Dependable Capacity (Net MWe):
1080
- 8. ~If Changes Occur. In Capacity Ratings (Items Number 3 furough 7)
' a ' NA
'Since Last' Report, G.ive Reasons:-
Power Level To Which Restricted,. If Any (Net NWo}u,s
- J-NA 9.
- 10.. Reasons For Restrictions,:'If Any:
NA 4
This Month Yr.-to-Date Cumulative 11.
Hours-In Reporting. Period 744.00_
5'.087.00 55.511'.00 i
12.
Number Of Hours Reactor Was' Critical 330.58-2.624.69-.
40.554.97 j
13.
Reactor Reserve Shutdown Hours 0.00-0.00 0.00 14.
Hours Generator On-Line 209.23 2.487.41-39.303.49 1
l ~
15.
Unit Reserve Shutdown Hours' 0.00<
-0.00 0.00-l
' 16 ',
Gross Thermalx Energy Generated (HWH) 488.724.00- 7.985.342.89 123.853.099.44-l 17.
Gross Electrical Energy Generated'(MWH): 191.719.50 -2.744.805.00n 42.029.516.50 1
- 18. -
Net Electrical Energy Generated (MWH) 165.252.00 2.563.579.13 39.605.690.33 1
19.
Unit' Service factor 28.12%--
48,90%
70.80%
j 20.
Unit: Availability Factor.
28.12%1 48.90%
70.80%
1 21.
UnitCapacityFactor(Using_MOCNet) 20.57%-
46.66%--
66.06%
.22.
Unit Capacity Factor. (Using DER Net) 20.57%
46.66%
66.06%
-23.
Unit Forced Outage Rate 63.10%-
18.24%;
8.44%
.i 24.
Shutdowns Scheduled Over Next 6~ Months:(Type, Date,:and Duration of Each):
l NONE 1
- 25.
If Shutdown At End Of Report Period, Estimated Date:of Startup:-
NA 4
26.
Units In Test Status (Prior To Connercial Operation):~ -Forecast Achieved l
INITIAL' CRITICALITY-NA-
'NA INITIAL ELECTRICITY NA NA
' COMERCIAL' 0PERATION NA NA i
i
\\
.. ~
.sy L) d.
AVERAGE DAILY UNIT POWER LEVEL-DOCKET NO:
50-362 UNIT NAME:
SONGS - 3 DATE:
8-14-90 COMPLETED BY:
T. M. Sarette TELEPHONE:
(714) 368-9335 MONTH: Julv 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL.
(MWeMet)
(MWe-Net)L 1
0.00-
'17 0.00 2
0.00 18 0.00 3
0.00 --
19
'O.00 4
0.00 20 0 '. 00 -
5 0.00 21 0.00 6
0.00 22
'O.00' 7
0.00
.23 71.17 8
0.00=
24
'570.13 9
0.00 25 770.06 10, 0.00 26 842.81 11..
0.00 27.
954.17-12 0.00 28'
-1041.04 13 0.00 29 1075.83:
14 0.00-30-
-1108.54
/'
-15 0.00 31' 1120.46-16 0.00 1
l w
~
M IT SHUTDOWNS AW POWER REDUCTIONS
~ DOCKET NO: 50-362 UNIT NAME: SONGS - 3 REPORT MONTH:
JULY 1990 DATE:
8-14-90
- J COMPLETED BY
T. M. Sarette'
-TELEPHONE:
(714) 368-9335 Method of Shutting Cause & Corrective Duration Down LER System Component 1 Action to l
2 3
-No.
Date Type
'(Hours)
Reason Reactor No.
Code' Code' Prevent Recurrence 54 900414
.S.
534.77 C
4 NA NA NA Cycle 5 refueling: outage.'
I i.
L i
Reason:
3 Method:
IEEE St/. 25-1984 S-Scheduled A-Equipment Failure (Explain) 1 ".anual S-Maintenance or Test 2-Manual Scram.
C-Refueling.
' 3-Automatic Scram.
D-Regulatcry Restriction --
'4-Continuation from E-Operator Training & License Examination
-Previous Month' S
F-Administrative-5-Reduction. of 20%.
IEEE Std 803A-1983~
G-Operational Error"(Explain)
H-Other (Explain)-
'or greater in the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 6-Other'(Explain)-
1.
~
'M
)
SUM ARY OF OPERATING EXPERIENCE FOR THE' MONTH DOCKET NO:- 50-362:
i UNIT NAME:- S0 HGS - 3 DATE:J 5-A-90 COMPLETED BY:
T. M. Sarette i
TELEPHONE:
(714) 368-9335
-[
DA.tt 11B1 fy_tD.t July 1-0001-Unit is--in Mode 5 day 79 of the Cycle 5 Refu?'.ing outage.:
July 7 0745' Entered Mode 4.
July 14.
0610
. Entered Mode 3.
July 18 0345_
Connenced reactor startup.
0425 Entered Mode 2.,
0525 Reactor made critical..Consenced low power physics
-testing.
July 20 2050 Entered Mode 1.
i o
July 23 0646 Unit synchronized to the-grid.
l 1650 Commenced-reactor power increase'at 3% per. hour.
July 25 1100 Reactor at 80% power.;
l July 27 0530~
Commenced reactor power-increase.
d 2030 Reactor at 90%' power.
j i
July'28 0440 Commenced reactor power increase to 100%.
.)
l July 31 2400 Unit is in Mode 1 at'160% reactor-power. Turbine..
load at 1156 MWe gross.
j I
a 4
i u
j i
l is I
i
REFUELING INFORMATION-
-DOCKET NO:.
50-362 UNIT NAME:
SONGS - 3
-DATE:'
8-14-90 l-COMPLETED BY:
- 1. Pi._Sarette-TELEPHONE:
(714). 368-9335-l MONTH:'
July 1990
- 1. Scheduled date for next' refueling shutdown.
Cycle 6 refueling outage is forecast for January 1992.
- 2. Scheduled date for-restart following. refueling.
Restart from Cycle 6 refueling' outage is _ forecast for April' 1992.
- 3. Will refueling or resumption of operation thereafter. require a Technical' Specification change or other license amendment?
Not yet specifically determined for. Cycle 6.
Under evaluation, y
What will-these be?
l j
^Not yet specifically determined for Cycle-6.
Under evaluation, d
- 4. Scheduled date for submitting proposed licensingLaction and supporting information.
.]
q Not yet specifically determined:for Cycle 6...Under evaluation.
- 5. Important ' licensing considerations associated with refueling, e.g. new or different-fuel design or supplier, unreviewed design or. performance analysis methods, significant changes in fuel design,.new operating procedures. ~
j Not yet specifically determined for Cycle 6.
.Under evaluation.
- 1
,l q
i 1
D
n u.
c
,n...
sr..a.-
n
.u...
f REFUELilNi INFORMATION DOCKET NO:
50-362 UNIT NAME:'
SONGS - 3 DATE:
8-14-90 COMPLETED BY:
T. M. Sarette-TELEPHONE:'
(714) 368-9335 i-MONTH:
.,Julv 1990
- 6. The number of fuel-assemblies..
a)
In the core.
217 b)
In the spent fuel storage pool.-
445'(376 Unit 3-Soent Fuel Assemblies and 69-Unit 1 Soent Fuel 1
Assemblies l
.7. Licensed spent fuel storage capacity.
1542
- Intended change in spent fue1~ storage capacity.-
None-
- Expanded from 800 to 1542 by License-Amendment No. 77 - Facility--
l-modification-is scheduled to be completed by September 1991.
j l
'8. Projected date'of last refueling that:can be discharged to spent-fuel storage
. pool assuming present capacity.;
Approximately 2003 (full off load capability) f i
s l
l:
I L
4 0
4
~.
ij o.
L
-