05000316/LER-1978-064, Forwards LER 78-064/03L-0

From kanterella
Revision as of 01:18, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 78-064/03L-0
ML20062A829
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/27/1978
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20062A832 List:
References
NUDOCS 7810180016
Download: ML20062A829 (1)


LER-2078-064, Forwards LER 78-064/03L-0
Event date:
Report date:
3162078064R00 - NRC Website

text

.w _ . . _ , _ . - :-

~*=e--*

  • b.ho/> cm

,s O t' G ,.~mae a wcumumacomur DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan e9106 September 27, 1978

, Mr. J.G. Keppler, Regional Director

.',0ffice of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road cGlen Ellyn, IL 60137 M.

, 'f

( -

3 h Operating License DPR-74 Docket No. 50-316

. f '

Dear Mr. Keppler:

Pursuant to the requirements of the Appendix A Technical Specifications the following report is submitted:

R0 78-064/03L-0.

Sincerely, D.V. Shaller Plant Manager

/bab cc: J.E. Dolan R.W. Jurgensen R.F. Kroeger R. Kilburn R.J. Vollen BPI K.R. Baker R0:III '

. R.C. Callen MPSC P.W. Steketee, Esq. .

R. Walsh, Esq. l G. Charnoff, Esq. 1 G. 01sor. I J.M. Hennigan PNSRC J.F. Stietzel "ZP 3 0197g R.S. Keith T.P. Beilman/J.L. Rischling Dir. IE (30 copies)

Dir. , MIPC (3 copies) 10 IN00lb \