Forwards Revised LER 78-037/01T-1 Which Rescinds Commitment to Run Emergency Diesel Generator While Other Diesel Generator Being Removed from Operable Status.Change Will Reduce Number of Fast Cold Starts
ML20128C301
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/15/1985
From: Will Smith
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20128C304 List:
References
AEP:NRC:0896C, AEP:NRC:896C, GL-84-15, NUDOCS 8505280247
Download: ML20128C301 (2)


LER-2078-037, Forwards Revised LER 78-037/01T-1 Which Rescinds Commitment to Run Emergency Diesel Generator While Other Diesel Generator Being Removed from Operable Status.Change Will Reduce Number of Fast Cold Starts
Event date:
Report date:
3162078037R00 - NRC Website

text

'

.7

  • bmB yste , IN0MMA & MICHIGAN ELEC[RIC COMPANk'-

DONALD C. COOK NUCLEAR PLANT -

P.O. Box 458, Bridgman Michigan 49106 (616) 465-5901 May 15, 1985 AEP:NRC:0896C Donald C. Cook Nuclear Plant Unit Nos. I and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 LER 50-316/78-037 Mr. J. G. Keppler U.S. Nuclear Regulatory Commission s Office of Inspection and Enforcement \

Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr. Keppler:

Attached is a revised LER which rescinds our commitment to run an emergency diesel generator while the other diesel generator is being removed from an operable status.

NRC Generic Letter 84-15, Proposed Staff Actions to Improve and Maintain Diesel Generator Reliability, establishes an objective to reduce the number of cold fast starts. We are pursuing changes to our Technical Specifications to aid in this objective, but we also need to rescind our previous commit-ment to help meet this objective.

Since the incident reported in LER 50-316/78-037 occurred, the diesel rooms and the components within have been clearly labeled and the clearance / pro-cedure has been revised to require independent verification of the tagging of'all technical specification equipment by the Operations Department. We believe that these actions minimize the potential for a repeat of the error which resulted in this commitment.

We are effecting this change in order to reduce the number of starts on the emergency diesel generators. The proposed effective date for the rescission 6f the commitment is June 30, 1985. The intervening time is to allow for you or members of your staff to review the matter and express any question you have on the proposed action.

Very truly yours, 8505280247 850515 W 2 01985 4

PDR ADOCK 05000316 Ld/Ih# _

W. G. Smith,'J b S PDR Attachments cc: John E. Dolan R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman See attached additional distribution.

I' J~Ee/

m..

,. , 'LER ROL78-037/01T-1

'. * : May 15, 1985 ,

-Pega 2,of 2

,, .cc continuted: Document Control Manager M.P. Alexich R.F. Kroeger H.B. Brugger R.W. Jurgensen J.M. Hennigan INPO PNSRC J.F. Stietzel A.A. Blind Dottie Sherman, AnI Library r