05000316/LER-1978-073, Forwards LER 78-073/03L-0 & LER 78-074/03L-0

From kanterella
Revision as of 00:14, 25 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 78-073/03L-0 & LER 78-074/03L-0
ML20062B354
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 10/20/1978
From: Shaller D
INDIANA MICHIGAN POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML17317A690 List:
References
NUDOCS 7810270309
Download: ML20062B354 (1)


LER-2078-073, Forwards LER 78-073/03L-0 & LER 78-074/03L-0
Event date:
Report date:
3162078073R00 - NRC Website

text

~

a f ....n.

~

l ..

f vstem 1EQlANAluM1.CBLGANP.0WER.CDMPAN1.

DONALD C. COOK NUCLEAR . PLANT P.O. Box 458, Bridgman, Michigan 49106 October 20, 1978 Mr. J.G. Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission.

Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Operating License DPR-74 Docket No. 50-316

(

Dear Mr. Keppler:

Pursuant to the requirements of the Appendix A Technical Specifications the following reports are submitted:

R0 78-073/03L-0 ~~

RO 78-074/03L-0.

Sincerely,

.V--)

& D.V. Shaller Plant Manager

/bab cc: J.E. Dolan R.W. Jurgensen .

R.F. Kroeger R. Kilburn R.J. Vollen BPI K.R. Baker R0:III -

R.C. Callen MPSC P.W. Steketee, Esq.

R. Walsn, Esq.

G. Charnoff, Esq. *-

G. Olson J.M. Hennigan PNSRC J.F. Stietzel Dir., IE (30 copies-)

Dir. , MIPC (3 copies)

, 1 7810 a7 o3G9 3 (\