ML20063P349

From kanterella
Revision as of 02:39, 23 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Changes to Revision 1 to Safeguards Plan.Changes Withheld (Ref 10CFR2.790 & 10CFR73.21)
ML20063P349
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/04/1982
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: Vassalo D
Office of Nuclear Reactor Regulation
References
NUDOCS 8210130318
Download: ML20063P349 (2)


Text

-_

S-49P 2

COOPER NUCLEAR ST AT60N Nebraska Public Power District "' ' " * "A"E"o *"RA';"2"^?!" "

Get.:.ber 4, 1982 ATTACHMENT CONTAINS SAFEGII ARDS INFORMATION office of Nuclear Reactor Regulation Attention: Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing U.S. Nucicar Regulatory Commission Washington, D.C. 20555

Subject:

Cooper Nuclear Station Safeguards Plan; Report of Change to incorporate Revision Number Two.

Dear Mr. Vassallo:

In accordance with the provisions of 10 CFR Part 50.54(p), Nebraska Public Power District is submitting a Report of Change to the Safeguards Plan, Revision 1, for Cooper Nuc1 car Station. Upon incorporation of this Report of Change, the current revision of the Safeguards Plan becomes Revision Number two. A description of the changes, which we believe do not decrease the effectiveness of the plan, is enclosed.

In accordance with the provisions of 10 CFR Part 2.790(d)(1) and 10 CFR Part 73.21, we request that the attached report be treated as proprietary information, as Safeguards Information where applicable and withheld from public disclosure.

Sincerely, A -

m

1. P11 ant ATTACHMENT CONTAINS Division Manager of Licensing SAFEGUARDS INFORMATION and Quality Assurance JMP:ss Enclosures cc: Mr. John T. Collins w/o encl.

Regional Administrator U.S. Nuclear Regulatory Commission Region IV

.g. 98l 10

. ~ -,

PDR if -_

. o REPORT OF CHANGE ATTACHMENT 99NTA afe ad P n Pursuant to discussions with Mr. James Kelly, Chief of Physical Security Region IV, of the Nuclear Regulatory Commission, the following Report of Change is submitted. These measures are submitted to comply with Cooper Station's requirement to submit an amendment to the Physical Security Plan (Volume One of the Cooper Nuclear Station Safeguards Plan) for activities during significant construction operations. This Report of Change serves as the amendment.

The following pages of this Report of Change are enclosed:

Safeguards Plan

1) Revised Safeguards Plan Title Page indicating Revision two incorporates this Report of Change.

Volume I Physical Security Plan

1) Attachment "I" Page 1 of 11 ATTACHMENT CONTAINS SAFEGUARDS INFORMATION