ML20206P417

From kanterella
Jump to navigation Jump to search
Informs of Extended Completion Due Date of Third Commitment Re EOP Calculations,Per Licensee 980723 Response to Violations Noted in Insp Rept 50-298/98-02.Date Has Been Extended to 990228
ML20206P417
Person / Time
Site: Cooper Entergy icon.png
Issue date: 12/31/1998
From: Swailes J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-298-98-02, 50-298-98-2, NLS980207, NUDOCS 9901110377
Download: ML20206P417 (3)


Text

'

. .i N

Nebraska Public Power District NLS980207 Nebraska's Energy Leader December 31,1998 U.S. Nuclear Regulatory Commission j Attention: Document Control Desk l Washington, D.C. 20555-0001 i

Gentlemen:  !

l

Subject:

Extension of Commitment Date I NRC Inspection Report No. 50-298/98-02 j Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46 l l

Reference:

1. Letter NLS980094 to Document Control Desk (USNRC) from l J. H. Swailes (NPPD) dated July 23,1998, " Reply to a Notice of i Violation, NRC Inspection Report No. 50-298/98-02, Cooper Nuclear l Station, NRC Docket 50-298, DPR-46" i
2. Letter NLS980186 to Document Control Desk (USNRC) from J. H. Swailes (NPPD) dated November 13,1998, " Extension of Commitment Date, NRC l Inspection Report No. 50-298/98-02, Cooper Nuclear Station, NRC Docket No. 50-298, DPR-46" Gentlemen:

By letter dated July 23,1998 (Reference 1), the Nebraska Public Power District (District)

replied to a Notice of Violation, NRC Inspection Report No. 50-298/98-02. Therein, the District made the following three commitments

l

! 1. Options for clarifying action levels on the fuci zone level instrumentation and defining Top of Active Fuel (TAF) for the purposes of Emergency Operating Procedure (EOP) implementation will be evaluated. The needed changes will be implemented by November 15,1998.

2. The Improved Technical Specifications (TS) implementation team identified \

changes that are needed to correct TS figure 2.1.1, which is being relocated to the Updated Safety Analysis Report (USAR). These changes will be completed by September 16,1998, following relocation to the USAR.

9901110377 PDR 981231ADOCK 05000290.ej G PDR _ 4 (, g\

Cooper Nudear Station j PO. Box 98/ Brownville, NE 68321D099 Telephone: (407) 825-3811/ Fax: (402) 82S S211 http //www nppd com

,n NLS9802Q7 ,

Page 2 of 2

3. EOP calculations will be reviewed, in conjunction with Severe Accident Management implementation, to identify and correct any discrepancies introduced by the change in fuel length from 144" to 150". This will be completed by December 31,1998. i By letter dated November 13,1998 (Reference 2), the District extended the commitment date for the first two commitments to February 28,1999. This extension was based on the need to demonstrate the instrument rescaling changes to operators on the simulator prior to implementation in the plant.

For the third commitment, the District has reviewed and revised EOP calculations as necessary to incorporate 150 inch fuel. However, the rescaling ofinstruments and implementation of the first L and second commitments will require additional calculation revisions. As a result, it will be necessary to re-evaluate EOP calculations to identify and correct any additional discrepancies once the rescaling is complete. As such, the District is extending the completion date of the third L coinmitment to February 28,1999, to coincide with the date for the first two commitments.

l Should you have any questions concerning this matter, please contact me. 1 j 'I l Sincerely,

/

/

l ( , Va -

John H. Swaile Vice President ofNuclear Energy

i. /Ird

- Attachment cc: Regional Administrator

USNRC - Region IV L

l Senior Project Manager L USNRC - NRR Project Directorate IV-1 Senior Resident Inspector

[

USNRC NPG Distribution 4-a

^

o- l ATTACHMENT 3 LIST OF NRC COMMITMENTS l

Correspondence No:NLS980207 The tollovting table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE EOP calculations will be reviewed, in conjunction with Severe Accident Management implementation, to identify and correct any discrepancies February 28,1999 introduced by the change in fuel length from 144" to 150". This will be completed by February 28,1999.

1 l

l

. 1 4 1 i

l l

l I

i l PROCEDURE NUMBER 0.42 l REVISION NUMBER 6 l PAGE 9 OF 13 l PROCEDURE NUMBER 0.42 l REVISION NUMBER 4 l PAGE 7 OF 9 l