Forwards Rev 6 to Inservice Testing Program for ASME Class 1,2 & 3 Components, as Committed in Util 890926 Response to Generic Ltr 89-04.Summary Listing of Changes Also Encl
ML20043C708
Person / Time
Site: Cooper Entergy icon.png
Issue date: 05/25/1990
From: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20043C709 List:
References
CNSS907249, GL-89-04, GL-89-4, NUDOCS 9006060085
Download: ML20043C708 (6)


Text

'

FT ,.

> [j_ ,~,

'QC ,

llh ,

^

CooPCR NUCLEAR $TATioN '

Nebraska Public Power District " "Sh*c"OEM OT@^""

maw w = -awar e -

1 CNSS907249 May 25, 1990 1

U.S.-Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Cooper Nuclear Station Inservice Testing Program Plan,. I Revision 6, Submittal. Cooper Nuclear Station,;NRC  :

Docket No. 50-298/DPR 46. l

References:

1. NRC Ceneric Letter No. 89 04,'" Guidance on Dev51oping i Acceptable Inservice Testing Programs",  !
2. Letter from L, G. Kunci to NRC,-dated September 2f.i 1989,

" Submittal of Confirmatory Letter in Response to NRC' Generic  !

Letter 89 04. Cooper Nuclear Station, NRC Docket No. 350- .- '

298/DPR 46."

Gentlemen:

l Reference 1 requested the District to.

.. . I 1.

Review the most recently submitted Inservice Testing (IST)' Pro 6 ram j and implementing procedures against-the positions delineated in 1 Attachment 1 of Ceneric Letter (GL)- 89-04,

2. Confirm in writing their conformance with the stat l3d positions of a the GL, Reference 2 transmitted the District's confirmatory letter in response to NRC GL 89 04. The District's confirmatory letter stated,-'"A revised-IST Program l Plan is under development and, pending review and approval, it will-be:

submitted.to the NRC no later than May 1990.". The Districtohas, completed development of a revised IST Program Plan. A copy of the newly revised IST Program Plan (Revision 6) is enclosed for your review.

Additional reviews of the existing IST Program Plan identified the need-for-further changes to the program. These changes included minor revision.of existing relief requests, new relief requests, deletion'of some valve testing and reduction in testing frequency of certain other valves, addition of pumps and valves, program format changes, and other miscellaneous changes. A summary listing-of these changes is contained in Attachment 1 of this letter.

The new relief requests not related to CL 89-04 positions require NRC approval. Attachment 2 contains a list of these relief requestst and the date by which approval is needed.

9006060085 '

DR ADOCK h99 PDC tlI /

awnnu n = w = ~ ~ .= = = ~ = = = = = = , n -wnn=w

U.S. Nuclear Regulatory Commission.~ a May 25, 1990 Page=2 If you have any questions, please. contact me.

Sincerely,

.. revors I Division Manager of  :

Nuclear Support 1 GAT: RAS:sa j

Enclosures '

cc: U.S.-Nuclear Regulatory Commission Regional Office, Region IV NRC Resident Inspector

j Cooper Nuclear Station i

1 1

b s .

f D

c-

Ti y ,. ,

1 S hi-i Attachment l'

SUMMARY

LISTING OF CRANGES t

1, Page numbers and the IST Program revision number-were added:to each' page.- 1

2. The Table of Contents was-revised to reflect Program content changes-(e.g., -Technical Justifications in IV.H).

i

3. Changes to Section III, Pump Summary Listing, are-as follows: 'l A. Added symbol "Pd" and definition. i B. Changed "P t " to "Pi" on all applicable pumps iw the pump 711 sting.-

j C. Listed both HPCI main and booster pumps soparately'.. l D. Added Service Water and RHR Service Water Booster Gland' Water Supply Pumps including applicable information..

E. Added RP-15 to the REC pumps. ,

i F. Deleted RP-10~from Diesel Oil Transfer Pumps-listing.. j .

4 Changes to.Section IV. Testing Program for Valves, are as' follows: 1 A. Reworded IV.D, E, and H so that technical justifliations <may bei i used-for various situations (e.g., explanation of-a test method)' '

in addition to cold. shutdown testing frequency.

B. Revised IV.F to reflect the.new method of maximum allowable stroke ,

time determination per GL 89-04, Position 5.

5. Changes to Section V, Valve Summary Listing, are as'follows: q A. The valve summary listing was reformatted to include more F information and to update valve component identification: codes.'

B. Notation listings and associated explanations were: revised to reflect format changes.

C. Added and deleted valve drawing P & ID numbers tofreflect valve additions / deletions.

D. The following is a list of valves that were added t6 the valve-D summary listing.

HPCI-A0V-A042 SW-CV 57CV-through 64 HPCI-A0V A043 REC-A0V-TCV861 through:865-HPCI A0V-PCV50 REC-MOV-709MV HPCI-HO HOV10 SGT-A0V-DPCV546A, B ,

RCIC A0V-A034 SGT-A0V-270AV RCIC A0V A035 SGT-A0V-271AV RCIC-A0V-PCV23 SGT-CV-12CV t SW-CV-39CV through 49 SGT-CV 13CV SW-A0V-PCV361A, B HV-CV 36CV  ;

SW-MOV-2128MV SW CV-14CV i SW MOV-2129HV SW-CV-17CV-1 l

I l

l

-Attachment 1: ~

E. .The following is a list of valves that were deleted from the summaryflisting. These valves were evaluated and determinedinoel

_, :to have a safety related funct1on and do not require testing per -

Section XI. '

'HPCI A0V A053 'IA CV-47CV-NPCI CV 14CV IA-CV 48CV >

RCIC A0V A032 ..1[ l F. ,Various:other changes tc-the summary;11 sting are as,follows:

(1) -Added a~ stroke open test for RHR-MOV-M034A and'.B.-  ;

I (2)- Deleted the check valve open test for RCIC-CV-12CV:andi

.RCIC-V 42..

(3)j Added a' leak test for valves PC-A0V-NRV20 through 31.  ! -

j

-(4)L l Changed "ACAD" to "PC"'(Primary Containment),for the listed: 1 ACAD. valves. 1 (5)- ' Changed SW-CV-35CV, 36 3 [

,three~ years to quarterly.'7, and-38 test frequency from every '

4

" i (6)- Added a stroke close test for SGT A0V-251AV and 252.

(7) Changed check valve open test freguancy from quarterly to each-reactor refueling for HPCI-C' 13W, ..HPCI CV-17CV .

i RCIC CV-20CV, RCIC-CV 21CV, RHR 7-10CV,:ll',- 12, and 13.  !

(8) Changed "CS A0V A013A" to "CS-t 18CV",-"CS A0V-A013B" to 1 "CS CV 19CV", "RHR-A0V A068A" to "RRR-CV 26CV,- .

"RRR CV A068B", to "RHR-CV-27CV";

(9) Changed check valve testing frequency from quarterl

' cold shutdown for HPCI-A0V-A018 and RCIC-A0V A022. y tofeach l

6. Changes to Section VI, Relief Requests and Technical Justifications,lare as follows' ',

A. The Relief Requests and Technical Justifications index was updated- '

for additions, deletions,-and withdrawals.

B. Valvo component identification codes were updated.

C. An Approval Note column was added to-identify relief. request approval method. ,

D. The following list identifies new relief requests or requesta that were either withdrawn or revised.

(1) Relief Requests that were withdrawn.

RP-03, RP-10, RV-09 (2) Relief Requests that were revised only to update pump or f valve component identification codes. This type of revision-does not change the intent of the relief or affect its approval.

i

..,-.....--.i,

yh = 2 .

gJ 3 .

>- g i s .g ' .

i i

, Attachment'1:

1 RP 02, RP 08, RP 09, RP 12, RP 13, RV-04', RV 05,LRV-06,-

RV-11, RV 14, RV 15, RV-16, RV 18,'RV 21, RV-24. RV-25,. )

-RV 27, RV-30, RV 31, RV-36, RV-38, RV 39, RV 41',tRV 45, RV-46 (3). Relief Requests'that were revised for clarification.(whicht may include component identification code updates);  : These ty es of revisions should not change: the }ntent of the-re ief or affect its approval.

RV 07, RV-17, RV-20,.RV 22, RV 23, RV 26,'RV 28', RV-29, ' ' '

i RV-34, RV-40, RV 42, RV-43, RV f '

(4) New Relief Requests.; ,

c

.RP-14, RP-15,.RV 47,;RV-48, RV-49 RV-50,ERV 51', RV-52, ,

RV-53. RV-54, RV 55,.RV-56 The- following list -identifies new technicalljustifications or .

.E.,

  • justifications that were either revised or deleted'. ,

. (1)- Technical Justifications that were deleted.

TJV 06, TJV-07,; TJV-08, ' TJV 09, TJV 10 ;

(2) Technical Justifications that were revised.for' clarification or update of component identification codes.' <

TJV-01, TJV-02, TJV-04, TJV 05', TJV'-11' '

(3) New Technical Justifications.

TJV 12, TJV-13

.f

'l b

a f

..l>

.h. . _ . . . . . . ,

f

1.

Attachment 2 l

l L ..

NEW RELIEF REOUESTS REOUIRING APPROVAL _j i

' Relief Renuest Number' Reauested Anoroval Date i RP 14 1 July 31, 1990 RP-15 July 31, 1990 s-RV 47 November 30, 1990 RV-48 November 30, 1990-RV 49 November 30, 1990-RV - November 30, 1990 .

.RV-51 November 30, 1990 j RV 52 November 30, 1990 i These relief' requests are submitted after April 3, 1989, and are not related to any GL 89 04 positions.