05000298/LER-1998-013, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl
ML20204B819
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/16/1999
From: Peckham M
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20204B823 List:
References
NLS990019, NUDOCS 9903220264
Download: ML20204B819 (2)


LER-2098-013, Forwards LER 98-013-01 Re Missed Surveillance of Secondary Containment Isolation Valve.List of NRC Commitments Encl
Event date:
Report date:
2982098013R00 - NRC Website

text

-.

  • y n

, Nebraska Public Power District Nebraska's Energy bader NLS990019 March 16,1999 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

Subject:

Licensee Event Report No. 1998-013-1 Cooper Nuclear Station, NRC Docket 50-298, DPR-46 Revision 1 to the subject Licensee Event Report is forwarded as an enclosure to this letter.

Sincere

%\ u$d-M. F. Peckham Plant Manager

/dm Enclosure cc: Regional Administrator USNRC - Region IV Senior Project Manager USNRC -NRR Project Directorate IV-1 Senior Resident inspector USNRC NPG Distribution i

INPO Records Center h I

/

W. Turnbull MidAmerica Energy I

9903220264 990316  ;

PDR ADOCK 05000298 S PDR g Cooper Nudear Station P.O. Box 98/ Brownville, NE 68321-0098 Telephone: (402) 825-3811/ Fax: (402) 825-5211 http//www nppd com

9 l ATTACHMENT 3 LIST OF ERC COMMITMEETS l

Correspondence No: NLS990019 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments. Please notify the NL&S Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE The Engineering Department Guideline, EDP-04 Engineering Evaluations, will be revised to provide clear guidance on the responsibilities of the reviewer with regards to type of review required. Consideration will be N/A given to specifying what should be reviewed / performed, and to require justification for items not reviewed.

l PROCEDURE NUMBER 0.42 l REVISION NUMBER 6 l PAGE 9 OF 13 l u