Forwards Monthly Operating Rept for Feb 1999 for Cooper Nuclear Station.Rept Includes Documentation of Challenges to Srvs,Per TS 5.6.4
ML20204C964
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/15/1999
From: Peckham M
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20204C968 List:
References
GL-97-02, GL-97-2, NLS990026, NUDOCS 9903240046
Download: ML20204C964 (2)


Text

..,

H

~

s t

)

Nebraska Public Power District Nebraska's Energy Leader k

NLS990026 March 15,1999 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:

I

Subject:

Monthly Operating Status Report for Febmary 1999, Docket No. 50-298 Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for Febmary 1999. In accordance with the guidance provided by Generic Letter 97-02, this i

report includes an Operating Data Report and Unit Shutdown Report for the month of February. In accordance with Technical Specification 5.6.4, this report also includes documentation of challenges to the safety / relief valves.

4 Should you have any comments, or require additional information regarding this report, please contact me.

Sincerely, k

M M. F. P ekham Plant Manager MFP:lb 9903240046 990315 -

Enclosures

[A 0300 2 cc:

NRC Regional Administrator NRC Senior Resident Inspector ANI Library a

40047 y

gb I. W. Beck and Associates A. L. Dostal J. W. Dutton M. G. Farschon Cooper Nudear Station Po. Box 98/Brownvdle, NE 68321M98 Telephone: (402) 825-3811/ Tax: (402) 825-5211 http //www nppd com

p.

i f

U.S. Nuclear Regulatory Commission Match 15,,1999 l

Page 2 R. L. Gumm i

INPO Records Center R. P. Kosch

- E. A. Lanning B. Lewis '

l W. R. Mayben.

P. Murphy i

E. Pasche R. D. Stoddard J. H. Swailes W. Turnbull l

L l

1 I

l l

1 1

1 L.