MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES TXX-9610, Monthly Operating Repts for March 1996 for CPSES1996-03-31031 March 1996 Monthly Operating Repts for March 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
l-l'
<= ,'.
g
- l
-F E Log # TXX-901050 Fi1e # 10010-m C .C Ref. # 100FR50.36
,, nlELECTRIC t
wim m J c.hui,Jr. December 14, 1990 Eucutive Vke hendent i
U. S. Nuclear Regulatory' Commission Attn: Document Control Desk-Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION.(CPSES) '
DOCKET NO. 50 445 HONTHLY OPERATING REPORT FOR NOVEMBER 1990~ j
. Gentlemen Attached is the Monthly Operating Report for November 1990 prepared and
. submitted pursuant to Specification-6.9.1'.5 of Appendix A (Technical .
s
. Specifications) to the_ Comanche Peak Unit l' Steam Electric Station Operating License.
Sincerely.
1(/
a ,34 .
William J. Cahill, Jr.
By: I )N h /[
Roge FD. Walker Manager of. Nuclear Licensing
- JLR/grp '
. Attachment-4 c~-LHr,iR. D. Martin. Region IV-Resident Inspectors, CPSES-(3). ,
- Hr.:J.'W. Clifford NRR.:
4 K
' 9012190039 901130 400 North Olive Street L B. 31 Dallas, Texas 7520!
[
DR ADOCK0500g5
~
l
' Attachmeni'to TXX 901050 Pa ,e 1 of 4 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 NRC MONTHLY OPERATING REPORT DOCKETNO: 50 445 UNIT: CPSES 1 DATE: December 11.1990 COMPLETED BY: D. E. Buschbaum TELEPHONE: 817-897 5851 LOPERATING STATUS
- 1. Reporting Period: November 1990 Gross hours in reporting period: 220.
- 2. Currently authorized power level (MWt): 1411 Max depend. capacity (MWo Not): 1131. Design Electrical Rating (MWe Not): 11ED
- 3. Power lovel to which restricted (if any) (MWo Not): Hann
- 4. Reasons for rostriction (if any):
THIS MONTH YRTO DATE CUMULATIVE
- 5. Number of hours reactor was critical 431.2 2182.4 2182.4
- 6. Reactor reserve shutdown hours 111.1 272.9 272.9
- 7. Hours generator on line 415.5 2121.7 2121.7
- 8. ~. Unit reserve shutdown hours 0 0 0
- 9. . Gross thermal energy generated (MWH) 1,073,237 5,782,872 5, 82,872 10.. Gross electrical energy generated (MWH) 348,063 1,869,591 1,869,591
.1 1. Not electrical energy generated (MWH) 321,121 1,752,945 1,752,945
- 12. Reactor Service factor 59.9 82.9 82.9
- 13. Reactor availability factor 75.3 93.3 93.3 i 4, . Unit service factor 57.7 80.6 80.6 15', : Unit availability factor 57.7. 80.6 80.6-
- 16. Onit capacity factor (Using MDC) 39.2 58.6 58.6
-.17. ~ Unit capacity factor (Using Design MWo) 38.8 57.9 57.9
~1 8. ' Unit forced outage rate .
9.7 10.2 '10.2
- 19. Shutdowns scheduled over next 6 months (Type, Date, and Duratkin of each): a) Maintenance /
- Surveillance, 910401, 6 weeks.
20' .lf shutdown at end of report period, estimated date of startup:
- 21. Units in test status (prior to commercial operation): FORECAST ACHIEVED Inltlal Criticality -900403 900403 Inltlal Electricity 900501 900424 Commercial Operation 900721 900813
,- .\
1
..- . . , i LAttachment to TXX 901050
- Page 2 of 4 AVERAGE DAILY UNIT POWER LEVEL ,
DOCKETNO: 50-445 UN!T: CPSES1 DATE: December 11.1990~
COMPLETED BY: D. E. Bunchbaum TELEPHONE: 817 897-5851 MONTH: NOVEMBER 1990
'l DAY ' AVERAGE DAILY POWER LEVEL (MY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) 1- 1083 17 414 2 1072 18 451
'3 ' 249 19 61
'4 0 20 39 -
5 0 21 615 6 0 22 931 7 0 23 1062
- t'i :8 0 24 1097 0 25 1087
.1 0 - 0 26- 1048 11- 0 27 1037
- 1. 2 ' O 28 - 1035 43 0' 29- 974-1 4 -- O' 30~ 915 J15 ? 156 16- 298 N
t
-- , --er, -yw,,r -- ,w-- -- v ,
~ Attachment to TXX.901050 Page 3 of 4 -
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETPO: 50 445 UNIT: CPSES 1 DATE: December 11.1990 COMPLETED BY: D. E. Buschbaum TEl.EPHONE: 817-897-5851 MONTH: NOVEMBER 1990 l 11/1- 0000 Unit started month in MODE 1.
l 11/3 1316 Unit entered MODE 2 to begin scheduled outage including incore flux thimble ,
cleaning, feedwater regulating valve design modification,90P maintenance and inaccessible snubber visual Inspections.
1430 Unit entered MODE 3.
~11/4 0847- Unit entered MODE 4.
1715 Unit entered MODE 5.
11/12 1024 Unit entered MODE 4.
2356 Unit entered MODE 3.
11/13 0522 Unit entered MODE 4 in order to establish conditions for surveillance test on RCS Pressure isolation Valves which could not be achieved in MODE 3.
.1113 Unit entered MODE 3.
11/14 1347 Unit entered MODE 2.
1803 Unit entered MODE 1.
~
111/18 0243 Protection Inverter IV1F'C3 failed.
1.1/19. 0200 Unable to restore inverter within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> por Technical Specification 3.8.3.1, plant shutdown initiated and notification of unusual event declared.
LER 90 041 to follow.
0651 Unit entered MODE 2.
0754 Unit entered MODE 3.
-11/20 0925 Unit entered MODE 2.
1238 Unit entered MODE 1.
1 t '/ 3 0 - 2400 Unit ended month in MODE 1.
_ ~ -. ._ ._
2 Attachment to TXX-901050 .3 Page 4 of 4 : --
UNIT SHUTDOWNS AND POWER REDUCTIONS .
DOCKETNCE 50-445 UNE: CPSES 1 -
DATE: December 11.1900 COMPLETED BY: D. E. Buschbaum TELEPHOE; 817-897-5851 ;
REPORT MONTH NOVEMBER 1990 i METHODOF
, TYPE SHUTTINGDOWN !
Ff0RCED DURATION TKREACTOROR N1 DATE SSCHEDUI Fn (HOURS) REASCN REDUCINGPOWER CORRECTIVE ACTIONSCOMNENTS .
023 901103 S 259.5 8 1 Planned outage for BOP maintenance and incore flux thimble cleaning prior to winter peak load period 024 901114 F 13.0 G 4 Restart delayed following scheduled outage. Failure to perform surveillance test in MODE 4 required plant to cool down to MODE 4 after achieving MODE 3.
025 901114 F 0 B 4 Reduced Power operation for 105.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fot BOP grooming.
026 '901119 F 32.0 A 1 Protection inverter failure resulted in Tech Spec required shutdown. See wevious page.
- 1) REASON 2 ) METHOD A- EQUlPMENT FAILURE (EXPLAIN) . E. OPERATOR TRAINING AND UCENSE EXAMNATION 1: MANUAL B: MAINTORTEST F: ADMINISTRATIVE 2: MANUALSCRAM C- REFUEUNG G OPERATIO.JALERROR(EXPLAIN) 3: AUTOMATICSCRNA D: REGULATORYRESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)