ML032880415

From kanterella
Revision as of 21:44, 20 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
September 2003 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML032880415
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 10/06/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-104
Download: ML032880415 (3)


Text

Committed to Nuclear Excellen Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-1 04 10 CFR 50.36 October 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for September 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC MLA Enclosure cc: Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center je N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560

OPERATING DATA REPORT DOCKET NO. 5()-305 Notes:

UNIT NAME K ewaunee Unit continues to operate at 100% power.

DATE 0 ctober 6, 2003 COMPLETED BY IM[ary Anderson TELEPHONE (9 120) 388-8453 REPORTING PERIOD September, 2003 -

1. DESIGN ELECTRICAL RATING (MWE-NET) 544
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 526 MONTH YEAR-TO-DATE CUMULATIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5716.0 219210.7
4. NUMBER OF HOURS GENERATOR WAS ON LINE 720.0 5684.8 216978.1
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 388429 2968801 108611031

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE October 2, 2003 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD September, 2003 METHOD OF NO. DATE Type DURATION REASON 2 SHUTTING CAUSECORRECTIVE ACTIONS ye (Hours) DOWVNN REACTOR 3

No shutdowns or power reductions in September (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9 - Other H - Other (Explain)

SUMMARY

The unit continues to operate at 100% steady state power