October 2003 Monthly Operating Report for Kewaunee
ML033180112
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 11/05/2003
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-110
Download: ML033180112 (3)


Text

Committed to NuclearExcelle5 , Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-1 10 10 CFR 50.36 November 5, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 MONTHLY OPERATING REPORT The monthly operating report for the Kewaunee Nuclear Power Plant for October 2003 is enclosed in accordance with Technical Specification 6.9.a.3.

7/

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC MLA Enclosure cc: Administrator, Region Ill, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center N490 Highway 42

  • Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560 " -I-,

OPERATING DATA REPORT DOCKET NO. 5SD-305 Notes:

UNIT NAME K.ewaunee Unit continues to operate at 100% power.

DATE Nlovembei 5, 2003 COMPLETED BY IVlary Anderson TELEPHONE (9020) 388-8453 REPORTING PERIOD October, 2003

1. DESIGN ELECTRICAL RATING (MWE-NET) 544
2. MAXIMUM DEPENDABLE CAPACITY (MWE-NET) 526 MONTH ITAR.TO.DATE CUMULAIVE
3. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 6461.0 219955.7
4. NUMBER OF HOURS GENERATOR WAS ON LINE 745.0 6429.8 217723.1
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (IIM\I) 402479 3371280 109013511

Ui S UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE November 5, 2003 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD October, 2003 METHOD OF NO. DATE Type DURATION REASON2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours) DOWN 3

REACTOR Performance of SP54-086, Turbine Stop and 2 10/4/03 S 10.73 B N/A Governor Valve Operability Test, and Heater Drain Pump A&B maintenance.

(1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9 - Other H - Other (Explain)

SUMMARY

The unit continues to operate at 100% steady state power