May 2004 Monthly Operating Report for Kewaunee
ML041740699
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/14/2004
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-04-069
Download: ML041740699 (3)


Text

I Committed to NucearExcell Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC June 14,2004 NRC-04-069 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Report In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for May 2004 for the Kewaunee Nuclear Power Plant.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region 1II, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center N490 Highway 42 . Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560 191A l

OPERATING DATA REPORT DOCKET NO. 50-305 Notes:

UNIT NAME Kewaunee Unit continues to operate at 100%

steady state operation.

DATE June 14, 2004 COMPLETED Mary Anderson BY TELEPHONE (920) 388-8453 REPORTING PERIOD May, 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 574
2. MAXIMUM DEPENDABLE CAPACITY (MWE- 556 NET)

YEAR-TO-MONTH DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 3291.6 224711.3
4. NUMBER OF HOURS GENERATOR WAS ON LINE 744 3266.1 222453.2
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 425146 1782487 111583846

.- ' 4-i UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee '

DATE June 14, 2004 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD May, 2004 METHOD OF 2

NO. DATE Type' DURATION (Hours) REASON SHUTTING DOWN CAUSE/CORRECTIVE ACTIONS REACTOR 3

No shutdowns or power reductions in May (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9- Other H - Other (Explain)

SUMMARY

N/A