June 2004 Monthly Operating Report for Kewaunee Nuclear Power Plant
ML042080315
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 07/08/2004
From: Coutu T
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-04-080
Download: ML042080315 (3)


Text

Committed to NudearExcerl en Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC July 8, 2004 NRC-04-080 TS 6.9.a.3 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 Monthly Operating Report In accordance with Technical Specification 6.9.a.3., enclosed is the Monthly Operating Report for June 2004 for the Kewaunee Nuclear Power Plant.

Thomas Coutu Site Vice President, Kewaunee Nuclear Power Plant Nuclear Management Company, LLC Enclosure cc: Administrator, Region III, USNRC Senior Resident Inspector, Kewaunee, USNRC Project Manager, Kewaunee, USNRC Public Service Commission of Wisconsin INPO Records Center c5q N490 Highway 42

  • Kewaunee, Wisconsin 54216-9511 Telephone: 920.388.2560

-Z OPERATING DATA REPORT DOCKET NO. 50-305 Notes:

UNIT NAME Kewaunee Unit continues to operate at 100%

steady state operation.

DATE July 8, 2004 COMPLETED Mary Anderson BY TELEPHONE (920) 388-8453 REPORTING PERIOD May, 2004

1. DESIGN ELECTRICAL RATING (MWE-NET) 574
2. MAXIMUM DEPENDABLE CAPACITY (MWE- 556 NET)

YEAR-TO-MONTH DATE CUMULATIVE

3. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4011.6 225431.3
4. NUMBER OF HOURS GENERATOR WAS ON LINE 720 3986.1 223173.2
5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 10.0
6. NET ELECTRICAL ENERGY (MWH) 410108 2192595 111993954

UNIT SHUTDOWNS DOCKET NO. 50-305 UNIT NAME Kewaunee DATE July 8, 2004 COMPLETED BY Mary Anderson TELEPHONE (920) 388-8453 REPORTING PERIOD June, 2004 METHOD OF NO. DATE Type1 DURATION REASON 2 SHUTTING CAUSE/CORRECTIVE ACTIONS (Hours) DOWN 3

._ REACTOR No shutdowns or power reductions in June (1) (2) (3)

F: Forced Reason: Method:

S: Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip/Scram C - Refueling 3 - Automatic Trip/Scram D - Regulatory Restriction 4 - Other (Explain)

E - Operator Training & License Examination Continuation F - Administrative 5 - Load Reductions G - Operational Error (Explain) 9- Other H - Other (Explain)

SUMMARY

N/A