Revised Monthly Operating Rept for June 1993 for San Onofre Nuclear Generating Station Unit 2
ML20056D620
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/30/1993
From: Darling J
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20056D615 List:
References
NUDOCS 9308170185
Download: ML20056D620 (2)


Text

-1

, -Document Control Desk t

t ATTACHMENT A Revised June 1993 Operating Status SONGS Unit 2 Monthly Operating Report l

l mor.jul/14- 9308170185 930813 PDR ADOCK 05000361-R PDR-

Document Control Desk  ;

NRC MONTHLY OPERATING REPORT

      • Revised data is in BOLD Type ***

DOCKET NO: 50-361 UNIT NAME: SONGS - 2 DATE:

COMPLETED BY: J. L. Darlina TELEPHONE: (714) 368-6223 OPERATING STATUS

1. Unit Name: San Onofre Nuclear Generatina Station. Unit 2
2. Reporting Period: June 1993
3. Licensed Thermal Power (Mwt): 3390
4. Nameplate Rating (Gross MWe): 1127
5. Design Electrical Rating (Net MWe): 1070 ,
6. Maximum Dependable Capacity (Gross MWe): 1127
7. Maximum Dependable Capacity (Net MWe): 1070
8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report, Give Reasons: NA

9. Power Level To Which Restricted, If Any (Net MWe): NA
10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 720.00 4.343.00 86.520.00
12. Number Of Hours Reactor Was Critical 96.73 3.719.73 64.454.09
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00- -
14. Hours Generator On-Line 96.62 3.719.62 63.376.89-
15. Unit-Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (HWH) 272.151.65 12.281.788.01 207.101.636.33
17. Gross Electrical Energy Generated (MWH) 96.503.50 4.149.548.00 70.195.108.00 j
18. Net Electrical Energy Generated (MWH) 87.248.96 3.946.550.96 66.554.066.79 J Unit Service Factor
19. 13.42% 85.65% 73.25%
20. Unit Availability Factor 13.42% 85.65% 73.25%-  !
21. Unit Capacity Factor (Using MDC Net) 11.33% 84 93%

. 71.89%

22. Unit Capacity Factor (Using DER Net) 11.33% 84.93% 71.89%
23. Unit Forced Outage Rate 0.00% 0.0d% 6.50%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): 1 Refuelina shutdown. June 5.1993, forecast duration (86 days) i
25. If Shutdown At End Of Report Period, Estimated Date of Startup: NA I
26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved -!

l INITIAL CRITICALITY NA NA .

INITIAL ELECTRICITY NA NA l COMMERCIAL OPERATION NA NA mor.jul/15

,