Text
-1
-Document Control Desk t
t ATTACHMENT A Revised June 1993 Operating Status SONGS Unit 2 Monthly Operating Report l
l mor.jul/14-9308170185 930813 PDR ADOCK 05000361-R PDR-
Document Control Desk NRC MONTHLY OPERATING REPORT
- Revised data is in BOLD Type ***
DOCKET NO:
50-361 UNIT NAME:
SONGS - 2 DATE:
COMPLETED BY:
J. L. Darlina TELEPHONE:
(714) 368-6223 OPERATING STATUS 1.
Unit Name:
San Onofre Nuclear Generatina Station. Unit 2 2.
Reporting Period: June 1993 3.
Licensed Thermal Power (Mwt):
3390 4.
Nameplate Rating (Gross MWe):
1127 5.
Design Electrical Rating (Net MWe):
1070 6.
Maximum Dependable Capacity (Gross MWe):
1127 7.
Maximum Dependable Capacity (Net MWe):
1070 8.
If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA 9.
Power Level To Which Restricted, If Any (Net MWe):
NA 10.
Reasons For Restrictions, If Any:
NA This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 720.00 4.343.00 86.520.00 12.
Number Of Hours Reactor Was Critical 96.73 3.719.73 64.454.09 13.
Reactor Reserve Shutdown Hours 0.00 0.00 0.00-14.
Hours Generator On-Line 96.62 3.719.62 63.376.89-15.
Unit-Reserve Shutdown Hours 0.00 0.00 0.00 16.
Gross Thermal Energy Generated (HWH) 272.151.65 12.281.788.01 207.101.636.33 17.
Gross Electrical Energy Generated (MWH) 96.503.50 4.149.548.00 70.195.108.00 j
18.
Net Electrical Energy Generated (MWH) 87.248.96 3.946.550.96 66.554.066.79 J
19.
Unit Service Factor 13.42%
85.65%
73.25%
20.
Unit Availability Factor 13.42%
85.65%
73.25%-
21.
Unit Capacity Factor (Using MDC Net) 11.33%
84 93%
71.89%
22.
Unit Capacity Factor (Using DER Net) 11.33%
84.93%
71.89%
23.
Unit Forced Outage Rate 0.00%
0.0d%
6.50%
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
1 Refuelina shutdown. June 5.1993, forecast duration (86 days) i 25.
If Shutdown At End Of Report Period, Estimated Date of Startup:
NA I
26.
Units In Test Status (Prior To Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA l
COMMERCIAL OPERATION NA NA mor.jul/15
,