ML20056D614

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Repts for Jul 1993 for SONGS, Units 2 & 3 & Revised Monthly Operating Status Sheet for June 1993 Monthly Operating Rept to Correct Gross Thermal Energy Generated Values
ML20056D614
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/13/1993
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20056D615 List:
References
NUDOCS 9308170176
Download: ML20056D614 (1)


Text

~

p 0a 9

,/"d[

Southem Califomia Edison Company i

23 PAF4KER S1HEET IHVINE. CALIFOHNIA 9271B wAaEn c. uxns" August 13, 1993 o,.,". s."..a,

---,, w m,as -u,x av w.~,

t U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50-362 Monthly Operating Reports for July 1993 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 6.9.1.10 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires SCE to provide a Monthly Operating Report for each Unit, which includes: routine operating statistics and shutdown experience; all challenges to safety valves; any changes to the Offsite Dose Calculation Manual (0DCM); and any major changes to the radioactive waste treatment system. All covered activities are reported monthly, except for ODCM changes, which are reported within 90 days from the time the changes were made effective.

This letter transmits the July 1993 Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to safety valves, no changes to the ODCM, and no major changes to the Units 2 and 3 radioactive waste treatment systems during the reporting period.

Attachment A to the Enclosure provides a revised " Operating Status" sheet for the June 1993 Monthly operating report to correct the Gross Thermal Energy Generated values.

If you require any additional information, please let me know.

Sincerely, M

Enclosures cc:

R. H. Faulkenberry, Regional Administrator, USNRC Region V 1

M. B. Fields, NRC Project Manager, Units 2 and 3 j

C. W. Caldwell, USNRC Senior Resident Inspector,. Units 1, 2 and 3

.)

/-

N I

9308170"1'76 930813 (PDR ADOCK 05000361 i

1 1

R PDR

-~.