MONTHYEARML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20202H0431998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Cpses,Units 1 & 2 ML20198N7141997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Cpses,Units 1 & 2 ML20197J0941997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for CPSES Units 1 & 2 ML20199D2261997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Cpses,Units 1 & 2 TXX-9721, Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Comanche Peak Steam Electric Station ML20212C4851997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for CPSES Unit 2 ML20210V2101997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CPSES ML20141J3911997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CPSES ML20149E2991997-06-30030 June 1997 Monthly Operating Repts for June 1997 for CPSES TXX-9713, Monthly Operating Repts for May 1997 for CPSES1997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CPSES TXX-9710, Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station1997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Comanche Peak Steam Electric Station TXX-9708, Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for CPSES Units 1 & 2 ML20137B9781997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for CPSES Units 1 & 2 ML20134Q2521997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20137B9901997-01-31031 January 1997 Revised MOR for Jan 1997 CPSES Unit 2 ML20133M1971996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20132C1631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Comanche Peak Steam Electric Station TXX-9650, Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station1996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Comanche Peak Steam Electric Station ML20129F1601996-09-30030 September 1996 Revised Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20129B2401996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Comanche Peak Steam Electric Station ML20117N5201996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Comanche Peak Steam Electric Station ML20116N6651996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Comanche Peak Unit 1 & 2 TXX-9640, Monthly Operating Rept for June 1996 for Comanche Peak Electric Station1996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Comanche Peak Electric Station TXX-9638, Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Comanche Peak Steam Electric Station Units 1 & 2 ML20112A1951996-04-30030 April 1996 Monthly Operating Repts for April 1996 for CPSES TXX-9610, Monthly Operating Repts for March 1996 for CPSES1996-03-31031 March 1996 Monthly Operating Repts for March 1996 for CPSES ML20101D0461996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Comanche Peak Steam Electric Station Units 1 & 2 TXX-9601, Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Comanche Peak Steam Electric Station,Units 1 & 2 ML20101D0511996-01-31031 January 1996 Revised Monthly Operating Rept for Jan 1996 for Comanche Peak Steam Electric Station Unit 1 ML20096E7381995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Comanche Peak Steam Electric Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E8021999-10-0707 October 1999 CPSES Unit 1 Cycle 8 Colr ML20217G4151999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Cpses,Units 1 & 2 ML20212F7671999-09-24024 September 1999 SER Granting Relief Request C-4 Pursuant to 10CFR50.55a(g)(6)(i) for Unit 2,during First 10-year ISI Interval & Relief Requests B-15,B-16 & B-17 Pursuant to 10CFR50.55a(g)(6)(i) ML20216J5701999-09-16016 September 1999 Rev 2 to CPSES Unit 2 Cycle 5 Colr TXX-9920, Monthly Operating Repts for Aug 1999 for Cpses.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Cpses.With ML20211M2981999-08-0606 August 1999 Rev 1 to CPSES Fuel Storage Licensing Rept, CPSES Credit for Soluble Boron & Expansion of Spent Fuel Storage Capacity, Consisting of Revised Title Page and 4-1 ML20210U4081999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Cpses,Units 1 & 2 ML20210D8321999-07-23023 July 1999 Safety Evaluation Accepting Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20209H7661999-07-15015 July 1999 Safety Evaluation Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Comanche Peak Steam Electric Station,Units 1 & 2 ML20209H2721999-07-0909 July 1999 2RF04 Containment ISI Summary Rept First Interval,First Period,First Outage ML20209H2631999-07-0909 July 1999 2RF04 ISI Summary Rept First Interval,Second Period,Second Outage ML20209G7501999-07-0808 July 1999 SER Finding That Licensee Individual Plant Exam of External Events Complete with Regard to Info Requested by Suppl 4 to GL 88-20 & That IPEEE Results Reasonable Given Design, Operation & History of Comanche Peak Steam Electric Station ML20196L0191999-07-0808 July 1999 Safety Evaluation Granting Request Relief B-6 (Rev 2),B-7 (Rev2),B-12,B-13,B-14 & C-9,pursuant to 10CFR50.55a(g)(6)(i).Technical Ltr Rept Also Encl ML20210J9391999-06-30030 June 1999 CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20209G0801999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Cpses,Units 1 & 2 ML20196J0621999-06-29029 June 1999 Safety Evaluation Supporting Proposed Changes to Emergency Plan Re Licenses NPF-87 & NPF-89 Respectively ML20195G5141999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Comanche Peak Steam Electric Station,Units 1 & 2.With ML20216E0711999-05-21021 May 1999 1999 Graded Exercise - Comanche Peak Steam Electric Station ML20206Q0091999-05-14014 May 1999 Safety Evaluation Accepting GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217,for Comanche Peak Electric Station,Unit 1 ML20206H2061999-05-0606 May 1999 SER Accepting Exemption to App K Re Leading Edge Flowmeter for Plant,Units 1 & 2 ML20196L2241999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Cpses,Units 1 & 2 ML20205R5701999-04-14014 April 1999 Rev 6 to ER-ME-067, TU Electric Engineering Rept,Evaluation of Thermo-Lag Fire Barrier Sys ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20205J7831999-04-0101 April 1999 Rev 0 to ERX-99-001, CPSES Unit 2 Cycle 5 Colr ML20205N3101999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Cpses,Units 1 & 2 ML20204H6371999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Comanche Peak Units 1 & 2 ML20205N1481999-02-28028 February 1999 Corrected Monthly Operating Rept for Feb 1999 for CPSES, Units 1 & 2 ML20203A4881999-02-0303 February 1999 Safety Evaluation Granting Requests for Relief B-3 - B-6,C-2 & C-3 for Plant,Unit 2 ML20210J9201999-02-0101 February 1999 CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802- 990201 ML20202D0101999-01-27027 January 1999 Safety Evaluation Supporting First 10-yr Interval ISI Program Plan Requests for Relief B-9,B-10 & B-11 for CPSES, Unit 1 ML20199E9961998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Cpses,Units 1 & 2 ML20207D6091998-12-31031 December 1998 1998 Annual Operating Rept for Cpses,Units 1 & 2. with ML20197K2371998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Cpses,Units 1 & 2 ML20195F3161998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Cpses,Units 1 & 2 ML20154M8841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Cpses,Units 1 & 2 ML20154B5741998-09-30030 September 1998 Safety Evaluation Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Motor-Operated Valves. Licensee Has Established Acceptable Program ML20151W0361998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Cpses,Units 1 & 2. with ML20151Q1211998-08-14014 August 1998 Rev 0 to Control of Hazard Barriers ML20237C4061998-08-14014 August 1998 Safety Evaluation Supporting Request to Implement Risk Informed IST Program ML20237C6721998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Cpses,Units 1 & 2 ML20236V3121998-07-29029 July 1998 Final Part 21 Rept Re Enterprise DSR-4 & DSRV-4 Edgs.Short Term Instability Was Found During post-installation Testing & Setup as Part of Design mod/post-work Testing Process. Different Methods Were Developed to Correct Problem ML20236R0711998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Cpses,Units 1 & 2 ML20249B2581998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Cpses,Units 1 & 2 ML20248A1671998-05-22022 May 1998 Interim Part 21 Re Enterprise DSR-4 & DSRV-4 Emergency diesel.Post-installation Testing Revealed,High Em/Rfi Levels Affected New Controllers,Whereas Original Controllers Were unaffected.Follow-up Will Be Provided No Later than 980731 ML20247G3241998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Cpses,Units 1 & 2 ML20216B8661998-04-0101 April 1998 Rev 0 to ERX-98-001, CPSES Unit 1 Cycle 7 Colr ML20216J3061998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Cpses,Units 1 & 2 ML20216J1861998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Comanche Peak Steam Electric Station ML20197A6951998-02-24024 February 1998 Inservice Insp Summary Rept,First Interval,Second Period, First Outage ML20199J5391998-02-0202 February 1998 CPSES Commitment Matl Change Evaluation Rept 0002 for 960202-970801 1999-09-30
[Table view] |
Text
._. -
w L .. .' o maammmmmme MM Log # TXX-90207 1
I7 File # 10010 Ref. # 10CFR50.36 lilELECTRIC
- s. June 8, 1990 W.J.Cahm lurcutive Vke President '
U. S. Nuclear Regulatory Commission A,tn: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEN 4 ELECTRIC STATION (CPSES)
DOCKET NO. 50-445
- MONTHLY OPERATING REPORT FOR MAY 1990 l 4 Gentlemen:
Attached is the Meathly Operating Report for May 1990 prepared and submitted pursuant to Spec'.fication 6.9.1.5 of Appendix A (Technical Specifications) to the Comanche Peak Unit 1 Steam Electric Station Operating License.
Sincerely, William J. Ca ill, Jr.
JLR/vid :
Attachment x'~ c - Mr. R. D. Martin, Region IV !
Resident Inspectors, CPSES (3)
( j l
l I
9006120156 900531 ADOCK0500ggG (,
{DR
- - . - ~ . . Jv 1
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 N11C MONTHLY OPERATING REPORT DOCKETNO: 50-445 UNIT: CPSES1 DATE: June 6.1990 COMPLETED BY: D. E. Biierhhniim TEl.EPHONE: 817 897 5851
- OPERATING STATUS
- 1. Reporting Period: MAv,.1292 Gross hours in reporting period: Zid_
2i Currently authorized poweil evel (MWt): 1411 Max. depend. capacity (MWe Net): 127. Design Electrical Rating (MWe Net): .i1Mt
- 3. Power levol to which restricted (if any) (MWe Net): bl0AR
- 4. Reasons for restriction (if any):
THIS MONTH YRTO DATE CUMULATIVE
- 5. Number of hours reactor was critical 621.1 773.6 773.6
- 6. Reactor reserves shutdown hours 122.9 122.9 122.9
- 7. Hours generator on line 530.1 653.9 653.0
- 8. Unit reserve shutdown hours 0 0 0 y
- 9. Gross thermal energy generated (MWH) 748,810 875,945 875,945
- 10. Gross electrical energy generated (MWH) if 7,108 211,948 211,948 Y 11. Net electrical enorgy generated (MWH) 165,742 174,693 174,693
+ 12. Reactor Service factor N/A N/A N/A
- 13. Reactor availability factor N/A N/A N/A
- 14. Unit service factor N/A N/A N/A 15' Unit availability factor N/A N/A N/A
- 16. Unit capacity factor (Using MDC) N//s N/A N/A
- 17. Unit capacity factor (Using Design MWe) N/A N/A N/A
- 18. ' Unit forced outage rate N/A N/A N/A
- 19. ~ Shutdowns scheduled over next 6 months (Type, Date, and Duration of each):
Planned Trips for Startup Phase Testing
- 20. If shutdown at end of report period, estimated date of startup: N/A 21, Units in test status (pridr to commercial operation): FORECAST ACHIEVED Inltlal Criticality 9004(3 900403 Initial Electrictty 900501 900424 Commercial Operation 900721 1
1 1
s
( h[technent to TXX-90207
).Page 2 of 4 ,
[' -
AVERAGE DAILY UNIT POWER LEVEL l- ,
DOCKETNO: 50-445 l
- l. UNIT: CPSES1 l DATE: June 8.1990 ;
COMPLETED BY: D. E. Buenhhaum TELEPHONE: 817-897 5851 _ l MONTH: MAY 1990 CAY AVERAGE DAILY POWER LEVEL [MY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) ,
1 198 17 410
'2 a 188 18 40L -
it' 3 224 19 378
.4 378 20 182 5 408 21 209 6 385 22 67 7 402 23 0 8 280 24 0 9 419 25 0 10 0 26 111 11 101 27 0 ;
12 ,., 32 28 110 13 0 29 344 14- 195 30 444 15 419 31 443 16 431 2
Attachme.nt to TKX 90207 Pepe 3,Gf 4 '.
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKETNO: 50-445 UNIT: JOSES 1 DATE: ny&&1990 COMPLETED BY: I Q 3 f.. h ha u m TELEPHONE: 817 897-5851 MONTH: MAY 1990 5/1 0000 Unit began month in MODE 4 performing Initial Startup Testing.
5/9 1506 Reactor Trip on Low Low Steam Cenerator Level, Unit enterk MODE 3. Lost level due to loss of Feedwater to on0 Steam Generator due to Technician error working on Pressure transmitter for Feedwater Cdntrol. LER 90 013 to follow.
5/10 1334 Unit entered MODE 2. ,
5/10 1559 Unit entered MODE 1.
5/12
- 1022 Unit entered MODE 2 experiencing problems with a Feedwater Control Valve.
Subsequently determined that disk had separated from the stem. Vane was I repaired.
5/14 0308- Unit entered MODE 1.
5/22 0931 Unit entered MODE 3 as a preplanned result of Loss of Offsite Power Test o' Initial Startup Program. During the resulting plant trip, one RCS PORV tifted for approximately 4 seconds (normal response).
5/25 2112 Unit entered MODE 2.
l.
l 5/26 0259 Unit entered MODE 1. I 5/27 0128 Manual Reactor Trip, Unit entered MODE 3. Trip in response to failed shut j l
Feedwater Control Valve and anticipated low Steam Generator level. Failure due to shorted on Feedwater Control Valve. LER 90-017 to follow.-
l 5/27 1811 Unit entered MODE 2.
i ,
l 5/28 0748 Unit entered MODE 1. l 1
l l
5/31 2400 Unit ended month in MODE 1 continuing Initial Startup Testing. I l 1 i
I 3 i 4
- . . - - - .. . - . . - . . . . . . . - . . - . . . .~ .. - .
Attachment to TXX-90207 Page 4 cf 4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOOErNO- 50-445 UNIT: CPSES1 DATE- June 6.1990 COMPLETED BY: D. E. Rwhan TELEPHOE- 817-897-5851 REPORT A00 NTH MAY 1990 PETHODOF -
TfPE SHUTTINGDOWN ,
FFORCED DURATION TEREACTOROR M DATE S:SCEDULED fHOURS) ASON REDUCING POWER CORRECTNE ACTIONSCOMMtiNTS 001 900509 F 41.4 G 3 Loss of Feedwater Control, see previous page. (LER 90-013 to follow.)
002 900512 F 43.7 A 1 Feedwater Control Valve Disk Separation. See previous page.
003 900522 S 95.5 8 3 Part of planned Loss of Offsite Power Test per initial Startup Program.
004 900527 F 33.3 A 2 Failure of Feedwater Control Valve Solenoid. See previous page. (LER 90
-017 to follow.)
- 1) MASON 2)PETHOD A- EQUIPMENT FAILURE (EXPLAIN) E. OPERATOR TRANNG AND UCENSE EXAMINATION 1: MANUAL B: MAINTORTEST F: ADMINISTRATIVE 2: MANUALSCRAM
, C: REFUEUNG G OPERATiONALERROR(EXPLAIN) 3: AUTOMATICSCRAM
', D: REGULATORYRESTRICTION H- OTHER(EXPLAIN) 4: OTHER (EXPLAIN)
'. 4 s . .. m , .