ML111671028

From kanterella
Revision as of 20:28, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Radiological Emergency Response Plan Implementing Procedures,Including Procedures ECD 16.1 Re Corporate Emergency Response & Acd 12.1 Re Emergency Organization Structure
ML111671028
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 06/03/1981
From: Mathews E
Wisconsin Public Service Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML111671026 List:
References
CON-NRC-81-88 NUDOCS 8111130340
Download: ML111671028 (1)


Text

NRC-81-88 WISCONSIN PUBLIC SERVICE CORPORATION P.O. Box 1200, Green Bay, Wisconsin 54305 June 3, 1981 Dr. Harold R. Denton, Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Imolementine Procedures Imolementinq Procedures Pursuant to 10 CFR Appendix E, Wisconsin Public Service Corporation hereby submits ten copies of the Kewaunee Nuclear Power Plant Radiological Emergency PResponse Plan implemetning procedures listed below. By copy of this letter, three copies of these procedures are hereby submitted to Mr. James G. Keppler, Director, U.S. NRC, Region III, Glen Ellyn, Illinois.

ECD 16.1 (Rev. 0) Corporate Emergency Response Procedure ACD 12.1 (Rev. G) Kewaunee Emergency Organizational Structure ACD 12.2 (Original) Emergency Class Determination ACD 12.3 (Original) Unusual Event ACD 12.4 (Original) Alert ACD 12.5 (Original) Site Emergency ACD 12.6 (Original) General Emergency ACD 12.7 (Original) Emergency Communication System ACD 12.8 (Original) Activation and Staffing of Emergency Centers ACD 12.9 (Original) Personnel Accountability j) ACD 12.10 (Original) Occupational Injuries ACD 12.11 (Original) Radiation Emergency These revised procedures supersede those previously submitted. S Very truly yours, //0 E. R. Mathews, Senior Vice President Power Supply & Engineering snf cc - Mr. J. G. Keppler, Region III - NRC (3)

FDRA K AOO3O5 F D