ML111671073

From kanterella
Revision as of 21:28, 10 March 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedure EP-EOF-1 Re Corporate Emergency Response Organization & EP-EOF-2 Re Emergency Operations Facility Activation
ML111671073
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 03/03/1982
From: Mathews E
Wisconsin Public Service Corp
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML111671072 List:
References
CON-NRC-82-39 NUDOCS 8203250137
Download: ML111671073 (2)


Text

NRC-82-39 WISCONSIN PUBLIC SERVICE CORPORATION UPbilic Service P.0. Box 1200, Green Bay, Wisconsin 54305 March 3, 1982 Dr. Harold R. Denton, Director Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Dr. Denton:

Docket 50-305 Operating License DPR-43 Kewaunee Nuclear Power Plant Radiological Emergency Response Plan Implementing Procedures Pursuant to 10 CFR Appendix E, Wisconsin Public Service Corporation hereby submits ten copies of the Kewaunee Nuclear Power Plant Radiological Emergency Response Plan implementing procedures listed below. By copy of this letter, three copies of these procedures are hereby submitted to Mr. James G. Keppler, Director, U. S. NRC, Region III, Glen Ellyn, Illinois.

EP-EOF-l (Rev. C) Corporate Staff Emergency Response Organization EP-EOF-2 (Rev. C) Emergency Operations Facility (EOF) Activation EP-EOF-3 (Rev. C) Corporate Response to an Unusual Event EP-EOF-4 (Rev. C) Corporate Response to Alert EP-EOF-5 (Rev. C) Corporate Response to a Site Emergency EP-EOF-6 (Rev. C) Corporate Response to a General Emergency EP-EOF-7 (Rev. C) Communications and Documentation EP-EOF-8 (Rev. B) Relocation of EOF EP-EOF-9 (Rev. B) Interface with Support Organizations EP-TSC-2 (Rev. A) Technical Support Center Activation EP-TSC-3 (Rev. A) Plant Status Procedure EP-OP-2 (Rev. A) Emergency Control Room Activation for Emergency

Response

EP-RET-2B (Rev. B) Gaseous Effluent Sample and Analysis 9,6203250137 820317 PDR ADOCK 05000305 F PDR

Dr. Harold R. Denton March 3, 1982 Page 2 EP-ENV-3A (Rev. C) Environmental Protection Director Actions and Directives EP-ENV-3B (Rev. B) EM Team Actions EP-ENV-3E (Rev. B) Manual Environmental Dose Projection Calculations Index of Emergency Plan Implementing Procedures dated February 18, 1982 These revised procedures supersede those previously submitted.

Very truly yours, E. R. Mathews Senior Vice President Power Supply & Engineering snf Enc.

c% - Mr. J. G. Keppler, Region III - NRC (3)

Mr. J. Pagliaro, US NRC (1)

Mr. Robert Nelson, US NRC (1)

Mr. C. F. Riederer, PSCW (1)