MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
k * W, , l v\
l~' ^ \ ,
L OPERAflHG DATA PEPORT
' DOCKET H0. 50-366 DATE
.. .. _ . . . _ _ - _ _ _ _.. ~ ' ' -' ~ " - ' ~ ' ' ~ ~ ~ ~ '
'CONFt[TED By'~
IEtEPHONE ( 912 ) 367-7791 x 203 L
~ -~
f4FPATING STATUS " - ~ "~~~~~-~~ ** " ' * " " * " ' * ' * * * " " * " " * " ' * * * " * " ' * " ' * " *
~ ~
'
- l Unet Nener E I Hetch Nuclear Plent Un6t 2 +
Cunulative totals reported in the January report have been *
? r e p a e t . .. g Fer cdt 60-91
- f ound to be incorrect but have tecen corrected per converu. *
' I tecensed Thernet Power (MWL)* 2436
- tion Phil Ross of the hRC on 3-18-81. Totals shown for this * #
4 Nee *pleie Re t eng ( MWe) *
- 5 Cesegn Flectrecal, Cross Feteng (Het MWe 917.0,784.0
)* , _ _ * . month.are cor. rect.
,mmmmmes 6 Mst nun De pe n.ie b t e Cepecety (Cross MWe >I 805.7 * *
' ? Men. nun Depensable Cepecity (Het MWe): 772.7 *******"*"*""******************'*'*********** ~~ ' ~'
9 If rhanges Oc cur ~ e es Ce pet e t y Ret i ng s ( It ens Nunber 3 Through 7) b nce test- Report. Gove'Reasonst' ~
\.,
~ ~ ~ ~ ' ' ' ~ "
9 Fower Level To Wh6ch Restr6cted.'If Any (Not MWe): ~ ~ ~ ~ ~ ~ ~ ~~ ] - '~ ~'~~ " ~ '' '
' ' ' ~ ~ '
In Peesons For Restr6ctions. If Anyt
' ~ ~
L -
This Month Yr,. -t o- D e t e ,
Cunuletive
~~
"Il~' Hours In Report'ang' Period~~ ~ ~~ 472 ~ l 3 0 3 3" ~ ~ ~ ^
~
. 1436 214.0 ^ ' 214.0 12 Hunter Of Hours Reector Wes Cret4Cet ~ ~ ~ ~ ~~ ~
8447.7
- ~ '
13 Peac6er Reserve Shutdown ~~ Hours ~ ~ ' ' ~ 0.0 0.0 0.0 le ' Hours Cenerater On-tone ' - ' -
~ ~ ~ 15 7 . 7
- ~ ~ '
'15 7. 7 ~ " 7846.0
"~
15 ten e t Peserve Shutdown Houts 0.0 ~ - - ~ '
O.0 0.0 16 Cress Ther ne t Energy'Genereted (MWN)-' ~
'268152 268152 17366050 ~
17 ~ Crns E l e c t r' e c a l Energy Generated (MWH)= 97660 '87660'~~ ~ ~~ 5754940
'~
tie t Electrocal Energy Generated (MWH)]~ ~
~^
79839 g 18 , .
16794 5478909 19 Unit Serwece Facter 20- Unit eve 6tabilety F eit t e r '~ ~ " ' * - ' ~
~~
23.5 23.5 ~
11.1 I I ,1 ~ ~ ~ 60.2 60.2
~ ~
15.4
~~ ' ~~
- 78. Unet Ce pec tly F actor ~ (Using PDC Net ) ~
" ~ ' ' ~
7.0 ' ' ' ~~ 54.4
- 22. Un6L Cepec6tg Factor (Using DER' ~ - " Net)" - ' ' ' ~ ~ ~ ~ ~ ~ -
' ' ' ~ - ' 15.2 ~
6.9 $3.6 23 Un.t Forced Outege pote ~ ~ 2 7 : 0 ~~ - 2 7 .' 0 ' '~~~ '~ 12. 2 ~ ~ ' "
24 Shutdowns Scheduled ,0_ver Nest 6 Months ( Type ' Dete, and' Duret s on of' Esch)s - , _
25 If %ut toun se t End'0f Report Period, Esteneted Date of Startupt' [ ~~- ,
- 26. Unets in fest Status (Prior to Connerciel Operation): . Forecast 'Ach6eved init:At Ceir: cat:1v iNitiat EtcCTR City
- ;y . _ _ _ ; . ;_ 7.____________... __ .___________
p
_ _ COnnteClet Orrnar:DH _. _ __._____________._ _ _____ _______ _ to _
.:r u . _ .-. _ _. _ .. .._ ._ . _ . _ _ _ . . _ . ._
>+
..._;.."==-'-
_ - - - *^
_M.- -
.e
_ O __
me y.m e_ _ _ , . . . _ - - -ne..- _ . _ , .,-g ,e.. .
_ _ _ _ ___ .. . _. . . ._g._
q v . . _ . . - _ _ _ _ . . _ . _ . . .. .. .
. _ ._ rm
__ . _ . _ - ~ _ _ .
.4
- 4 M '* w .m -v , ..,,, .y
- yo - * . sorte s - 's , l g i*
p g ,
,; q 7 51 ya . .
g
,; , #
4
t e, r. .g\
' QVERf.GE DCILY UNIT POWER LEVEL I
. ~..__ _ .
00CKET NO. 50-366
,y g . _ . . _ .. _ - .___ .. .._e. . .. _ . _ . ..
~ '
' COMPLETED BY - -
TELEPHGHE ( 912 ) 367-7701 x 203~ - -
d L
NONTH 02-21 - ' ~ ~
~ ~
DAY- AVEPACE Da!LY r0WER LEVEL ~" ~ DAY- AVERACE DAILY POWER LEVEL-~~- - --" -- - '-- -- '
-- - -"- - - / --
(NWe-Net) ' (MWe-Het)
.g.-. ._
4- _.g, _gg .- --. -
2 -4 -
19-
-11 -
L 1 -5 I9 -12 - - - '-- '
.g n - _ -. . _ .-.. ., . . . . ---_ . . - _ . _ .
5 -5 21- -
-16 --
s _7 . ._
. gg . . . 37 -
. . ~. . -
7 _. __
..5 . -
.. . _ --- 23-- - - - ' ' - - 4 3 0 - -- -- - - --* - - - - - - -- - - -- ----- - - -
8 -5 -
24 -- - - - - - - 557 - - - - - -- - - - -
L 9 5 ~. __. . . _
.-25' - " -
672 - - - - -- - - -
- d 3,__ . . .
_3.- ,g- _... ._ 437 .. ._. . . _ _ _. _. - _. m. . _ .. . . . . . _. .
L I1 -5 -- -
27 - - 582 --- ~ --- -
12 -5 ~ - -- - -
'28 ~
- - -"- 726 - - - - -- - - -
~
t3 -----~*---S --- 29 ---- -- - - - -- - - - - - - - - - - - - - - - --- - - ----
14 -5 --
3 0 -- --- - - -- - - - --- ~^ -- ~ ~
L g5 4 - _.. . __ .- .
33 % .. -. ._ _ __ __.. ._ _ . . _ . . ._ _ _ _ _ ..
/
,g_._.. .___.,7 __ . ._ --
L -._ . _ _. .__ _ _-.. . _. . . _ . . _ .. ,. . - . _ ___ .. -
{
. g y77 3
-.ss,. - _ e.- -
%we- ew. m- um- w e . .e.- me
. =.is. m. . m.-m .,
. m , .,,sbe m . .
. . _ _ _ . . _ . _ _ . .__ = _ _ _ .._ _ .. _ . _ . _ _ _
e.e hm .s m mu--m .e-h--Assu..- +.m.mn me- e -a .W*.O m -. .-* e ers-u . me-.-. . ee e.. e . . . - - .-
-..e.ageg. y-- .e-o,- e.em e . me- m.m-.m.-a-si unae... ,_. e. ump..+.---ie- ca.m.,--w. e.eu wm-,,um,.e. . ,, , , , , , ,,, ,,.,
,em-a, . ..<.- w .h ee .. m *-.e
= . =. m ..=m= tem,--%.%w .. , ---.% .e, -m. , , , , , , .. %. ,
m . m enemn. m.emi. *-h e. w % .gi mui.mi. m --en e . %-.a g.-er.e. .m.. e em meg g..e,em.g, 4.=,4 ,
,s. .e +"-6h.e ee* A*= *-*-a.w*_** - w- m * * = ' * - -h '*- *.u.m- h *.-ee - - e -
_.m e. .m>- . ,
. m,e. ,w- musia ee.--ee . m. e e
.w_%_.-g . me-. . - - *-mm...m@eme- .qu- hoe e+-we.. ---
- n eew v.-e.. . ,.. . ,, ,,
,.ese.. -%. aie- -
..a e g.m e- eem
g a e 4 p. a e, a, ,
"" "'- *- . m g- ,
. ...suimumiews a w m e.._ge. em --.mi= u . 9m-em. . e t * -
.w am a w- e.w.g, eseen e-. .
e_.e4. .uie.
m hww - - ea, ..uk*.P- .- ew. . .. a e. , 4 , y g, -
_ . ... .. . .- . . _-.- . . - - - -. ~ . . . _. . .
.*=m ma mm em .* is m . umm.= . ea=. ene wi- .- --@elb e-. @ --ashah. ---4 _ e- e. e , ,.
_.__ _ . _-_ . . . -- _ . - . a. .
9 h
- , -. e.e..wg.
s g.m.me e4 e.. .. %1- e.sa .o muus .m a m, -
, ~
- 7 m m. . ; 7 ; ,
,p a
)
I i IXXlKET NO. 50-366 UNIT SilUTUOWNS AND POWER REDUCTIONS UNIT NAME llatch 7 DATE 3-10-n1 ,
COMPLETED BY J. M. Kamishlain REPORT MONT11 February TELEPil0NE 912-367-7851
- "h n
.E E } *Y3 Licensee Eg *L Cause & Correc0ve N... Date k gg ,, 3g& Event g3 Eh
^*"""'"
H aE al jig Report # mu g Prevent Recurrence 456 C. NA. ZZ. ZZZZZZ, Shutdown for refueling outage 81-02 810201 5 1 81-03 810220 F 14 C 1 'NA ZZ ZZZZZZ Shutdown for refueling outage 81-04 810220 F 3 11 5 NA HA' TURBIN On line to warm up for turbine over-speed trip test 81-05 810220 F 41.6 C 1 ,NA ZZ. ZZZZZZ Of f line due to refuelingoutage.and turbine overspeed trip test ,
81-06 810222 F 31 11 5 NA HA
- TURBIN' On line to warm up for turbine over-
' ' speed trip test .'- -
81-07 810222 F 2.9 0 1 NA HA. TURBIN Unit of f line to. perform turbine over-speed trip test i i n. . ',
. I I 2 3 4 F: Forced Reason: Method: . Exhibit G-Instsuction:
A lainipment Failure (Esplain) 1 Manual for Preparation of Data 5: Scheduled B-M.iintenance of Test ' 2-Manual Scram. Entry Sheets for Licensee C. Refueling . J.Automalle Scram. Event Report (LE RI File INUREG- .
D llegulatory Restriction 4 -Continuations 0161) t E Operatier Tralning A Ucense Enemination 54 toad Rx1uction -
F. Administrative g gg ( gg) $ .:
Exhibit I Same Source Goperallonal Error (Emplain) * '
(9/77) ItOther(Emplain) ,
3 * . i ni. , . A
DOCKET NO. 50-366 UNIT SilU1 DOWNS AND POWER REDUC 110NS UNIT NAME llatch 7 DATE . 1-10-H1 COMPLETED BY J. M. Kamishlian REPORT MONilt February 1ELEril0NE 912-36/-/851 "Lc g .*
Licensee E e, 4 Cause & Correcllve
. N. . Date E .$
g ~! }Y3 gcE Event u'g b Action to E oE j (5 c: Repost# Eu j0 Prevent Recurrence b ,
81-08 810222 F 75.5 C- 5 NA ZZ 'ZZZZZZ Unit on startup ramp from above re-fueling outage 581'-05 81-09 810225 F 2 A 5 NA Cil PUMPXX Load reduced due to 2A.cond booster pump and RFPT trip 81-10 810225- F 3 C 5 NA ZZ ZZZZZ Unit on.startup ramp from refueling
.- outage 810226 2 A 5' 'NA Cil., PUMPXX Load reduced due to 2C booster pump 81-11 F and 2A RFPT trip 81-12 810226 F 5 C 5 NA ZZ ZZZZZZ Unit on startup ramp from refueling outage-a 2 3 , 4 F: Forced Resum: Method: Exhibit G Instructions A.I:iuipment Failure (Esp! sin) 1 Manual for Piepars'ior, of Data S: Scheduled
- tlStaintenance of Test ' 2 Manual Scram. Entry Sheels for Lkensee C Refueling .. 3. Automatic Scram. Event Repost (LERI File (NUREG-D Regulatory Restriction 4 -Continuations 0161)
EOperator Tralning & Ucense Enemination . 5-Ioad Rxluction 5 9-Other (Explain) Exhible I . Same Source d pc allo al Errut(Emplain) * *
(9/77) 110 her(Emplain)
O O l g e ,
I I
50-366 I DOCKET NO.
l UNIT SilUIDOWNS AND POWER REDUCTIONS UNIT N AME lhtch 2 3-10-81 J
DATE COMPLETED 8y J. M. Kamishlian REPORT MONT11 February - TELEPil0NE 912-367-7851
)
1 "L.
EE "b Licensee E* k b Cause & Correct'ive No. Date E-N 3= "b 3M Event 5i
- u jd Action to
$$ sk j(s Repori# prevent Recurrence 81-13 810226 F 1.1 A' 5 'NA CH PUMPXX Load reduced due to 2C booster pump i and 2A RFPT trip 81-14 810226 F 11.1 B 5 NA ZZ CONROD Load. reduced to perform ;od sequence !
exchange 81-15 810226 F 51.7 C 5 ,NA ZZ ZZZZZZ Unit on startup ramp from refueling outage l
.;
i i
i 2 3 . 4 F: Forced Reason: Method: Exhible G Instructions !
S: Scheduled A0 uirrnent t railure(Emplain) 1-Manual for Preparation of Data B41aintenance of Test 2 Manual Scram. Entry Sheets Sr Lkensee C Refueling . 3 Automatic Scram. Event Report (a.ER) File (NUREG-4 -Continuations 0161)
D Regulatory Restrktion .
E Operator Tralning & Ucense Ezerninstion 5--Ioad Paduction 5
F Administrative 9-Other (Explain) Exhible l- Some Simece Goperational Errot(Emplain) -
" liether (Emplain)
(9/77) '
I e q 4 0 9 g
HATCH 2 SAFETt-RELATED MAINTENANCE REQUESTS
TO BF REPORTED FOR FEBRUARY 1981 NUMBER DATE COMPLETED DESCRIPTION 80-3866 12-13-80 Replaced pilot gasket on base sub. ass. coil and housing assembly gaskets to scram pilot solenoid 2C11-HCU(26-15)-F118 81-25 1-23-31 On RHR torus isolation valves 2 Ell-F065A&B: replaced 13 ft.
copper air line and 13 ft. flex air line on valve A and replaced a 1 ft. copper air line, 23 ft. flex air line and 1 Whitey valve on valve B 81-24 1-23-81 Replaced one swagelock coupling on core spray suction isolation I
valve 2E21-F019A 80-4849 l-22-81 on- diesel generator engine 2R43-S001C the following corrective action was taken:
machined .003 from #11 main bearing cap and straightened
- 7,8,9,10,12,13, and 14 using hyd. press and special mandrill to correct line bore- twist.
Honed and placed .025 snim under cylinder liner and pad on engine blocx which corrected twist on #11 cylinder liner; installed new cylinder liners )
on #10 and #11 with new seals and "O" rings; disassembled, cleaned,
~
and replaced upper pistons; repaired top cover by removing damaged material and welding -new material in the area; installed new crank shaft, timing chain, upper and 1 front cover and new gaskets 80-4737- 1-17-81 Installed new mech. seal, checked shaft _ alignment, and retorqued.all bolts to required-torque' per HNP-2-6200 on "D" PSW pump 2P41-C001D 81-446' l-26-81' Replaced new .maglock -switen for
, disc indicating light on RHR
. testable check valve 2 Ell-F050B
c' NARRATIVE REPORT UNIT 2 Feb. 1st Unit shutdown for refueling Feb. 19th At 2: 35 Rx critical Feb. 20th At 13:55 gen on line to warm up for turoine overspeed trip test; 16:53 gen off line to perform turbine overspeed trip test; 23:57 Rx mode switch in start and hot standby Feb. 21st At 14:46 Rx auto scra= due to feed pump trip caused by low water level; 23: 23 Rx critical Feb. 22nd AT 04: 39 Rx mode switch in run; at 10:27 gen on line; at 13:35 gen off line to perfor= turbine overspeed' trip test; at 16:22 gen on line; unit on startup camp from refueling outage Feb. 25th At 19:54 load was reduced due to 2A cond boos-ter pump and 2A RFPT tripping Feb. 25th At approximately 21: 54 unit on startup camp from refueling outage Feb.' 26th At_1:00 load was reduced due to 2C booster-pump and 2A RFPT -tripping; at approximately 3: 00 unit'on startup camp from refueling outage; at
-8: 00 load was reduced due to 2C booster pump and.2A RFPT tripping; at 9: 10 load was reduced to perform rod sequence exchange at 20:17 unit on startup camp from refueling outage i
I i
(
l I .'
c.
- k. T
&'L-[
80-5075 1-28-81 Replaced all bad components a f ter trouoleshooting and replaced security inverter (UPS system) 2R44-S004 back to service 31-21 1-20-81 Removeed are strikes with grinder on core spray piping 2C21 80-5025 1-22-81 Blued valve gate and cleaned and reassembled drywell floor drai:. sump isolation valve 2Gil-F004 80-4430 1-19-81 Opened RHR minimum flow valve 2 Ell-F007A and took blue check. Seating surface showed 905 contact on pressure side and approximately 60% on back side. Could not cut better fit. Lapped gate to correct as best as could and reblued. New gate recommended for valve but none in stock s
81-22 1-20-81 Removed arc strikes located near 2E21-F019A on torus side on core spray piping 2E21 _
81-26. 1-26-81 Replaced one 3 ft. flex air line and 1 ft. copper tube on HPCI torus suction valve 2E41-F051 1