Category:Meeting Summary
MONTHYEARML24143A1832024-05-23023 May 2024 Summary of the May 07, 2024, Public Outreach to Discuss the NRC 2023 End-of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML24039A1802024-02-23023 February 2024 January 29, 2024 Teleconference Between the U.S. Nuclear Regulatory Commission and Xcel Energy ML23313A1592023-11-0909 November 2023 U.S. Nuclear Regulatory Commission Summary of the October 10, 2023, Public Meeting to Discuss Monticellos Condensate Backwash Receiving Tank Fatigue Evaluation ML23275A0222023-10-0505 October 2023 Summary of September 21, 2023, Public Meeting with Northern States Power Company Regarding Proposed License Amendment Request to Revise the Pressure Temperature Limits Report ML23200A2602023-07-20020 July 2023 Summary of July 14, 2023, Public Meeting with Northern States Power Company Regarding Proposed Alternative to Defer Periodic Verification Testing of Reactor Water Clean-Up Inboard Isolation Valve ML23157A0432023-06-0808 June 2023 Summary of Public Outreach to Discuss the NRC 2022 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML23115A4382023-05-0101 May 2023 March 29, 2023, Meeting Summary for Environmental Review of Subsequent License Renewal Application for Monticello Nuclear Generating Plant, Unit 1 ML23110A0142023-05-0101 May 2023 Memo March 22, 2023, Monticello Unit 1, Subsequent License Renewal Application Public Environmental Scoping Meeting ML23115A4642023-05-0101 May 2023 Summary, March 29, 2023, Monticello Units 1 Subsequent License Renewal Application Public Environmental Scoping Meeting ML23110A0152023-05-0101 May 2023 Summary March 22, 2023, Monticello Units 1 Subsequent License Renewal Application Public Environmental Scoping Meeting ML23074A1212023-04-0303 April 2023 March 8, 2023, Summary of Public Meeting with Northern States Power Company Regarding Monticello Nuclear Generating Plant Alternative Request PR-08 to Defer Quarterly Testing of Components of High Pressure Coolant Injection System ML22292A0122022-10-24024 October 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application, on September 13, 2022 ML22208A2192022-08-0303 August 2022 Summary of July 25, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Amendment to Adopt Advanced Framatome Inc. Methodology for Determining Core Operating Limits for Monticello Plant ML22208A1952022-08-0303 August 2022 Summary of July 26, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to the Alternative Request for Excess Flow Check Valves at Monticello Nuclear Generating Plant ML22130A7172022-05-10010 May 2022 Summary of the May 3, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML22084A3852022-03-31031 March 2022 Meeting Summary for Environmental Pre Submittal Meeting for Subsequent License Renewal Application on March 15, 2022 ML22032A0112022-02-0303 February 2022 Summary of January 27, 2022, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned Relief Request to Test Excess Flow Check Valve ML21285A0312021-10-15015 October 2021 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to Planned License Amendment to Extend Allowed Outage Time for Fuel Oil Storage Tank for Monticello Nuclear Plant ML21167A1842021-06-16016 June 2021 Summary of the June 9, 2021, Public Outreach to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML21098A0742021-04-13013 April 2021 Summary of March 25, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Adopt Advanced Framatome Methods ML21040A4612021-02-11011 February 2021 Summary of February 3, 2021, Meeting with Northern States Power Company, Doing Business as Xcel Energy, Related to a Planned License Amendment to Combine the Emergency Plans and Create a Common Emergency Operations Facility ML20281A5092020-10-16016 October 2020 Summary of October 2, 2020, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Amendment to Revise the Safety Limit Minimum Critical Power Ratio for Monticello Nuclear Generating Plant ML20218A4462020-08-0505 August 2020 Summary of the July 16, 2020 Public Outreach to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant ML20077L8312020-03-20020 March 2020 Summary of February 27, 2020, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment to Adopt TSTF-505 Provide Risk-Informed Completion Times - RITSTF Initiative 4b ML19130A1672019-05-14014 May 2019 May 8, 2019 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, to Discuss a Response to a Request for Additional Information Related to the License Amendment Request to Adopt 10 CFR 50.69 ML18046B2072018-02-26026 February 2018 Summary of February 8, 2018, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Exemption from Fire Protection Requirements at Monticello Nuclear Generating Plant Units 1 and 2 ML17353A0242018-01-0202 January 2018 Summary of December 12, 2017, Teleconference with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request to Adopt TSTF-425 ML17341A1292017-12-11011 December 2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Changes to the Security Plans at the Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML17300A0362017-10-31031 October 2017 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request Related to Emergency Diesel Generator Technical Specifications ML17270A0072017-09-29029 September 2017 Summary of Teleconference with Northern States Power Company, Doing Business as Xcel Energy, on Potential License Amendment Request to Adopt TSTF-542 Reactor Pressure Vessel Water Inventory Control ML17235B1542017-08-23023 August 2017 July 11, 2017,Summary of the Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Monticello ML17090A2442017-04-0606 April 2017 Summary of February 28, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on the Integrated Leak Rate Test License Amendment Request for Monticello Nuclear Generating Plant CAC No. MF7359) ML17034A1202017-02-0909 February 2017 Summary of January 24, 2017, Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Revision to the Emergency Action Level ML16334A0112016-12-0606 December 2016 Summary of Meeting with Northern States Power Company, Doing Business as Xcel Energy, on Potential Exemption Request from Fire Protection Requirements ML16172A0662016-06-20020 June 2016 Summary of the May 26, 2016, Monticello Public Meeting ML15271A2072015-10-0202 October 2015 July 9, 2015 Summary of Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, U.S, Nuclear Regulatory Commission and Northern States Power Company- Minnesota to Discuss Flood Analysis Associated with Monticello Nuclear ML15195A4472015-08-0505 August 2015 Summary of Public Meeting with Xcel Energy and Areva to Discuss Changes to the Proposed Technical Specifications and COLR in Support of the Areva Extended Flow Window License Amendment Request ML15093A2342015-04-0303 April 2015 Summary of Monticello Public Meeting ML14297A1272014-10-31031 October 2014 Summary of October 1, 2014, Public Meeting with NSPM and Areva to Discuss Areva Fuel Transition License Amendment Request and Future License Amendment Application Regarding Use of Areva Atrium 10XM Fuel in Extended Flow Window Domain ML14220A2832014-09-0808 September 2014 Summary of August 5, 2014, Closed Meeting Between Representatives of the U.S. Army Corps of Engineers, NRC, and Northern States Power Company - Minnesota to Discuss Flooding Analysis Associated with Monticello and Prairie Island Nuclear Gen ML14153A0252014-06-20020 June 2014 Meeting Summary - Public Meeting on May 16, 2014, to Discuss Xcel Energy'S Flood Hazard Reevaluation Extension Request for the Monticello and Prairie Island Nuclear Generating Plants ML14168A0182014-05-16016 May 2014 Xcel Energy Responses to NRC Questions Regarding Flood Hazard Reevaluation Report Extension Requests ML14111A0352014-04-21021 April 2014 Summary of Monticello Public Meeting to Discuss the 2013 Annual Assessment Results ML13351A3422013-12-30030 December 2013 December 4, 2013 Summary of Public Meeting with Northern States Power Company of Minnesota to Discuss the Future License Amendment Application Regarding the Use of Areva Atrium 10XM Fuel in Extended Flow Window Operating Domain ML13171A1522013-06-24024 June 2013 April 24, 2013, Summary of Public Meeting in City of Kewaunee to Make Post-Shutdown Decommissioning of Activities Report (PSDAR) Available for Public Comment ML13169A0352013-06-14014 June 2013 Email Miller to Wilson Summary of Call with Monticello Flooding Audit ML13135A0312013-05-31031 May 2013 Summary of May 3,2013, Conference Call with Northern States Power Company - Minnesota (NSPM) to Discuss Application of 10 CFR 26.205(d)(6) During the Current Refueling Outage ML12338A0062012-12-13013 December 2012 November 20, 2012, Summary of Public Meeting with Northern States Power Company of Minnesota to Discuss the Extended Power Uprate Gap Analysis ML12188A2582012-07-20020 July 2012 Summary of Meeting with Monticello Regarding a Future Amendment to Approve Use of Areva Atrium 10XM Fuel ML12093A4772012-05-0101 May 2012 April 2, 2012, Summary of Meeting with NSPM to Discuss Issue Related to Containment Accident Pressure Credit for Extended Power Uprate Operation 2024-05-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 23, 2009 LICENSEE: Northern States Power Company, Minnesota FACILITY: Monticello Nuclear Generating Plant
SUBJECT:
SUMMARY
OF THE JULY 7, 2009, OPEN HOUSE PUBLIC MEETING TO DISCUSS NRC ACTIVITIES, NUCLEAR POWER ISSUES, AND THE MONTICELLO NUCLEAR GENERATING PLANT 2008 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 7, 2009, the U.S. Nuclear Regulatory Commission (NRC) held an open house at the Monticello Community Center in Monticello, MN. The purpose of the open house was to provide opportunities to discuss NRC activities, nuclear power issues, and Monticello Nuclear Generating Plant performance for the 2008 calendar year with the public. The NRC letter and meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML091700147 and ML091700163, respectively. A list of principal meeting attendees can be found in the Enclosure.
The open house discussed an overview of the NRCs Mission and Strategic Goals, the Reactor Oversight Process (ROP), and national ROP results. The NRC discussed other agency regulatory activities such as nuclear security and safeguards, the license renewal process, spent nuclear fuel and independent spent fuel storage installations, radiation safety, and new nuclear power plant construction and licensing activities.
The NRC also provided discussions related to the NRCs assessment of the Monticello Nuclear Generating Plants 2008 annual performance, which was documented in the March 4, 2009, End-of-Cycle assessment letter, under ML090630251. The End-of-Cycle assessment had been presented onsite to Monticello management and staff on April 1, 2009. Throughout the open house, members of the public were given the opportunity to ask questions of NRC officials.
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22
Enclosure:
As Stated DISTRIBUTION:
See next page
Letter to T. OConnor from K. Riemer dated July 23, 2009
SUBJECT:
SUMMARY
OF THE JULY 7, 2009, OPEN HOUSE PUBLIC MEETING TO DISCUSS NRC ACTIVITIES, NUCLEAR POWER ISSUES, AND THE MONTICELLO NUCLEAR GENERATING PLANT 2008 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT cc w/encl: D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.
J. Stine, State Liaison Officer, Minnesota Department of Health Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office Chairman, Wright County Board Mayor of Monticello Chairperson, Sherburne County Administrator, City of Monticello G. Mortensen, INPO
July 23, 2009 LICENSEE: Northern States Power Company, Minnesota FACILITY: Monticello Nuclear Generating Plant
SUBJECT:
SUMMARY
OF THE JULY 7, 2009, OPEN HOUSE PUBLIC MEETING TO DISCUSS NRC ACTIVITIES, NUCLEAR POWER ISSUES, AND THE MONTICELLO NUCLEAR GENERATING PLANT 2008 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On July 7, 2009, the U.S. Nuclear Regulatory Commission (NRC) held an open house at the Monticello Community Center in Monticello, MN. The purpose of the open house was to provide opportunities to discuss NRC activities, nuclear power issues, and Monticello Nuclear Generating Plant performance for the 2008 calendar year with the public. The NRC letter and meeting notice for this open house can be found in the Agencywide Documents Access and Management System (ADAMS) as ML091700147 and ML091700163, respectively. A list of principal meeting attendees can be found in the Enclosure.
The open house discussed an overview of the NRCs Mission and Strategic Goals, the Reactor Oversight Process (ROP), and national ROP results. The NRC discussed other agency regulatory activities such as nuclear security and safeguards, the license renewal process, spent nuclear fuel and independent spent fuel storage installations, radiation safety, and new nuclear power plant construction and licensing activities.
The NRC also provided discussions related to the NRCs assessment of the Monticello Nuclear Generating Plants 2008 annual performance, which was documented in the March 4, 2009, End-of-Cycle assessment letter, under ML090630251. The End-of-Cycle assessment had been presented onsite to Monticello management and staff on April 1, 2009. Throughout the open house, members of the public were given the opportunity to ask questions of NRC officials.
/RA/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22
Enclosure:
As Stated DISTRIBUTION:
See next page DOCUMENT NAME: G:\1-Secy\1-Work In Progress\MONT 2008 EOC Mtg Summary.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII C RIII C RIII RIII NAME CScott for KRiemer CScott:cms DATE 07/23/09 07/20/09 OFFICIAL RECORD COPY
Letter to T. OConnor from K. Riemer dated July 23, 2009
SUBJECT:
SUMMARY
OF THE JULY 7, 2009, OPEN HOUSE PUBLIC MEETING TO DISCUSS NRC ACTIVITIES, NUCLEAR POWER ISSUES, AND THE MONTICELLO NUCLEAR GENERATING PLANT 2008 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-1 RidsNrrPMMonticello RidsNrrDirsIpab Resource Cynthia Pederson Kenneth OBrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource
PUBLIC MEETING PRINCIPAL ATTENDEES July 7, 2009 NRC G. Shear, Deputy Director, Division of Reactor Projects, Region III K. Riemer, Branch Chief, Branch 2, Division of Reactor Projects, Region III C. Thomas, Senior Resident Inspector, Monticello L. Haeg, Resident Inspector, Monticello P. Chandrathil, Public Affairs, Region III H. Logaras, Government Liaison, Region III Monticello Nuclear Generating Plant T. OConnor, Site Vice President, Monticello Enclosure