MONTHYEARML24283A1192024-10-28028 October 2024 Letter to Shawn Hafen, Re Monticello Subsequent License Renewal Schedule Change L-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI ML24277A0202024-10-0303 October 2024 Operator Licensing Examination Approval Monticello Nuclear Generating Plant, October 2024 IR 05000263/20240112024-10-0101 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000263/2024011 ML24199A1752024-10-0101 October 2024 Issuance of Amendment No. 212 Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI IR 05000263/20240052024-08-30030 August 2024 Updated Inspection Plan and Follow-Up Letter for Monticello Nuclear Generating Plant, Unit 1 (Report 05000263/2024005) L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality 05000263/LER-2024-002, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure2024-08-27027 August 2024 Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure ML24222A1822024-08-27027 August 2024 – Proposed Alternative Request VR-09 to the Inservice Testing Requirements of the ASME OM Code for Main Steam Safety Relief Valves IR 05000263/20244202024-08-21021 August 2024 Security Baseline Inspection Report 05000263/2024420 - Cover Letter IR 05000263/20240022024-08-14014 August 2024 Integrated Inspection Report 05000263/2024002 ML24218A2282024-08-0505 August 2024 Request for Confirmation of Information for Relief Request RR-017, Inservice Inspection Impracticality During the Fifth Ten-Year Interval ML24208A1502024-07-26026 July 2024 Independent Spent Fuel Storage Installation - Submittal of Quality Assurance Topical Report (NSPM-1) ML24215A2992024-07-23023 July 2024 Minnesota State Historic Preservation Office Comments on Monticello SLR Draft EIS ML24198A2372024-07-18018 July 2024 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Monticello Nuclear Generating Plant L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) ML24164A2402024-06-10010 June 2024 Minnesota State Historic Preservation Office- Comments on Draft Monticello SLR Draft EIS L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 ML24137A2792024-06-0303 June 2024 Audit Summary for License Amendment Request to Revise Technical Specification 3.8.6, Battery Parameters, Surveillance Requirement 3.8.6.6 ML24141A1292024-05-22022 May 2024 Northern States Power Company - Use of Encryption Software for Electronic Transmission of Safeguards Information ML24141A1782024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24135A1902024-05-14014 May 2024 Submittal of 2023 Annual Radioactive Effluent Release Report IR 05000263/20240102024-05-13013 May 2024 Age-Related Degrading Inspection Report 05000263/2024010 ML24128A0042024-05-0909 May 2024 Letter to Minnesota State Historic Preservation Office- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renewal Application ML24127A1472024-05-0909 May 2024 Letter to Mille Lacs Band- Section 106 Consultation Regarding the Monticello Nuclear Generating Plant Subsequent License Renew. Application L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) ML24089A2382024-04-29029 April 2024 Summary of Nuclear Property Insurance IR 05000263/20240012024-04-29029 April 2024 Plan - Integrated Inspection Report 05000263/2024001 ML24115A2872024-04-25025 April 2024 Sec106 Tribal, Dupuis, Kevin-Fond Du Lac Band of Lake Superior Chippewa ML24115A2962024-04-25025 April 2024 Sec106 Tribal, Larsen, Robert-Lower Sioux Indian Community ML24115A3072024-04-25025 April 2024 Sec106 Tribal, Williams, Jr., James-Lac Vieux Desert Band of Lake Superior Chippewa Indians ML24115A3052024-04-25025 April 2024 Sec106 Tribal, Vanzile, Jr., Robert-Sokaogon Chippewa Community ML24115A2892024-04-25025 April 2024 Sec106 Tribal, Fowler, Thomas-St. Croix Chippewa of Wisconsin ML24115A3022024-04-25025 April 2024 Sec106 Tribal, Stiffarm, Jeffrey-Fort Belknap Indian Community ML24115A2972024-04-25025 April 2024 Sec106 Tribal, Miller, Cole-Shakopee Mdewakanton Sioux Community ML24115A2952024-04-25025 April 2024 Sec106 Tribal, Kakkak, Gena-Menominee Indian Tribe of Wisconsin ML24115A2922024-04-25025 April 2024 Sec106 Tribal, Jensvold, Kevin-Upper Sioux Community ML24115A3062024-04-25025 April 2024 Sec106 Tribal, Wassana, Reggie-Cheyenne and Arapaho Tribes ML24115A2912024-04-25025 April 2024 Sec106 Tribal, Jacskon, Sr., Faron-Leech Lake Band of Ojibwe 05000263/LER-2024-001, Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component2024-04-25025 April 2024 Reactor Scram, Containment Isolation, and Cooldown Rate Outside of Limits Following Technician Adjustment of Wrong Component ML24115A2982024-04-25025 April 2024 Sec106 Tribal, Reider, Anthony-Flandreau Santee Sioux Tribe ML24115A3032024-04-25025 April 2024 Sec106 Tribal, Taylor, Louis-Lac Courte Oreilles Band of Lake Superior Chippewa Indians ML24115A3012024-04-25025 April 2024 Sec106 Tribal, Seki, Darrell-Red Lake Nation ML24115A2882024-04-25025 April 2024 Sec106 Tribal, Fairbanks, Michael-White Earth Nation.Docx ML24115A2992024-04-25025 April 2024 Sec106 Tribal, Renville, J. Garret-Sisseton Wahpeton Oyate of the Lake Travers Reservation 2024-09-26
[Table view] Category:Meeting Notice
MONTHYEARPMNS20240506, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-15015 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application PMNS20240505, Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application2024-05-0707 May 2024 Draft Environmental Impact Statement Meeting Related to the Monticello Power Plant License Renewal Application ML24115A3102024-04-24024 April 2024 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Plant for Performance for 2023 Calendar Year PMNS20240066, Cultural Resource Surveys2024-01-19019 January 2024 Cultural Resource Surveys PMNS20231228, Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-11-0101 November 2023 Section 106 Consultation Discussion for the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20231085, SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation2023-10-0202 October 2023 SLRA - Public Meeting to Discuss Condensate Backwash Receiving Tank Fatigue Evaluation PMNS20231010, Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy2023-09-0808 September 2023 Notice of Meeting with Northern States Power Company, a Minnesota Corporation, Doing Business as Xcel Energy PMNS20230790, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-06-29029 June 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy ML23111A2762023-04-25025 April 2023 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Plant for Performance for 2022 Calendar Year PMNS20230237, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-28028 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230213, Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application2023-03-14014 March 2023 Environmental Scoping Meeting Related to the Monticello Nuclear Generating Plant Subsequent License Renewal Application PMNS20230188, Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy2023-02-24024 February 2023 Notice of Meeting with Northern States Power Company, Doing Business as Xcel Energy PMNS20220900, Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-09-12012 September 2022 Pre-Submittal Meeting of License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220695, Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant2022-07-26026 July 2022 Meeting with Xcel Energy to Discuss an Alternative Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant PMNS20220699, Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel2022-07-0808 July 2022 Meeting with Xcel Energy to Discuss the Amendment Request for Monticello Nuclear Generating Plant Related to Atrium 11 Fuel ML22109A0672022-04-20020 April 2022 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello and Prairie Island Nuclear Generating Plant for 2021 Calendar Year PMNS20220131, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant Environmental PMNS20220141, Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety2022-03-0909 March 2022 Pre-Submittal Meeting for License Renewal Application for Monticello Nuclear Generating Plant (MNGP) Safety PMNS20220019, Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello)2022-01-13013 January 2022 Pre-Application Meeting with Xcel Energy to Discuss Excess Flow Check Valves Relief Request for Monticello Nuclear Generating Plant (Monticello) PMNS20211229, Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant2021-09-22022 September 2021 Pre-application Meeting Regarding Potential License Amendment Request to Modify Emergency Diesel Generator Fuel Oil Storage Tank Requirements for Monticello Nuclear Generating Plant ML21145A3462021-05-25025 May 2021 6/9/21 Notice of Significant Public Meeting to Discuss NRC End-of-Cycle Performance Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant for Performance for 2020 Calendar Year ML21146A1902021-05-25025 May 2021 Notice of Information Meeting with a Question and Answer Session to Discuss NRC 2020 End-Of-Cycle Plant Performance Assessment of Monticello Nuclear Generating Plant PMNS20210203, Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant2021-03-0404 March 2021 Pre-Application Meeting with Xcel Energy to Discuss the Atrium 11 Fuel Transition License Amendment Request for Monticello Nuclear Generating Plant ML21022A0082021-01-22022 January 2021 Teleconference with Xcel Energy to Discuss a Planned License Amendment Request for Monticello Nuclear Generating Plant (Monticello) and Prairie Island Nuclear Generating Plant, Units 1 and 2 (Prairie Island) ML20183A2872020-07-0101 July 2020 7/16/2020 Notice of Significant Public Meeting to Discuss Nrc'S End of Cycle Assessment of Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant Performance for the 2019 Calendar Year ML19144A2402019-05-23023 May 2019 6/19/2019 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2018 Calendar Year ML18122A0992018-05-0101 May 2018 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2017 Calendar Year ML17258A0772017-09-14014 September 2017 17 U.S. Nuclear Regulatory Commission Region III 2017 Operator Licensing Workshop (Public Meeting) for Monticello Nuclear Generating Plant (CMS) ML17257A3762017-09-14014 September 2017 Public Meeting Notice of NRC Region III 2017 Operator Licensing Workshop ML16119A3892016-04-27027 April 2016 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2015 Calendar Year ML15275A4362015-10-0202 October 2015 EA-14-193 Monticello Nuclear Generating Plant- Notice of Significant Licensee Meeting Newly Scheduled (non-public) ML15181A0202015-07-0101 July 2015 July 9, 2015 Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML15183A4842015-07-0101 July 2015 Ltr. 07/01/15 Davis-Besse U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4792015-07-0101 July 2015 Ltr. 07/01/15 D.C. Cook U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting)(Drm) ML15183A4782015-07-0101 July 2015 Ltr. 07/01/15 Duane Arnold U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4722015-07-0101 July 2015 Ltr. 07/01/2015 Fermi U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4632015-07-0101 July 2015 Ltr. 07/01/15 Monticello U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A4452015-07-0101 July 2015 Ltr. 07/01/15 Perry U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15183A3862015-07-0101 July 2015 Ltr. 07/01/15 Prairie Island U.S. Nuclear Regulatory Commission Region III 2015 Operator Licensing Workshop (Public Meeting) (Drm) ML15182A4412015-07-0101 July 2015 Notice and Agenda - 2015 Operator Licensing Workshop ML15071A4012015-03-12012 March 2015 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2014 Calendar Year ML14357A1372014-12-23023 December 2014 January 14, 2015 Notice of Significant Non-Public Lecensee Meeting Regulatory Conference Regarding Monticello Nuclear Generating Plant ML14258A0652014-09-15015 September 2014 Forthcoming Meeting with Northern States Power Company - Minnesota (NSPM) to Discuss License Amendment Requests Associated with Areva Fuel Transition and Future Extended Flow Window for the Monticello Nuclear Generating Plant ML14205A5242014-07-24024 July 2014 August5, 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 ML14169A5522014-06-13013 June 2014 Operator License Workshop Invitation ML14168A1862014-06-13013 June 2014 07/9-10/2014 Meeting Notice with the Public - 2014 Operator Licensing Workshop ML14071A5612014-03-12012 March 2014 Notice of Significant Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Monticello Nuclear Generating Plant Performance for the 2013 Calendar Year ML14013A3202014-01-27027 January 2014 Federal Register Notice Regarding the 611th ACRS Meeting, February 5-7, 2014 ML13322A0092013-11-18018 November 2013 Notice of Forthcoming Meeting with Xcel Energy to Discuss the Proposed License Amendment for Transitioning to Areva Atrium 10XM Fuel in the Extended Flow Window ML13172A0802013-06-20020 June 2013 Notice of Meeting with Northern States Power Company, Minnesota to Present the Licensee the Results of NRC End-of-Cycle Assessment Regarding Monticello Nuclear Generating Plant 2024-05-07
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 19, 2009 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
PUBLIC MEETING/OPEN HOUSE TO REVIEW 2008 END-OF-CYCLE PERFORMANCE ASSESSMENT FOR MONTICELLO NUCLEAR GENERATING PLANT
Dear Mr. OConnor:
This letter is to inform you that the Nuclear Regulatory Commission will conduct a Category 3 public meeting/open house on July 7, 2009, at 5:00 p.m., at the Monticello Community Center in Monticello, MN. The purpose of this meeting is to provide an open public forum to discuss the Agencys annual assessment of Monticello Nuclear Generating Plant. The NRC will be available to answer questions from the public regarding plant performance, as well as the Agencys oversight of the facility. Northern States Power Company is encouraged to attend this meeting.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).
If you have any questions regarding this meeting, please contact me at (630) 829-9628.
Sincerely,
/RA by Nirodh Shah for/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22 DISTRIBUTION See next page
Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
PUBLIC MEETING/OPEN HOUSE TO REVIEW 2008 END-OF-CYCLE PERFORMANCE ASSESSMENT FOR MONTICELLO NUCLEAR GENERATING PLANT
Dear Mr. OConnor:
This letter is to inform you that the Nuclear Regulatory Commission will conduct a Category 3 public meeting/open house on July 7, 2009, at 5:00 p.m., at the Monticello Community Center in Monticello, MN. The purpose of this meeting is to provide an open public forum to discuss the Agencys annual assessment of Monticello Nuclear Generating Plant. The NRC will be available to answer questions from the public regarding plant performance, as well as the Agencys oversight of the facility. Northern States Power Company is encouraged to attend this meeting.
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).
If you have any questions regarding this meeting, please contact me at (630) 829-9628.
Sincerely,
/RA by Nirodh Shah for/
Kenneth Riemer, Chief Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22 DISTRIBUTION See next page DOCUMENT: G:\BRANCH TSS\ALL EOC/EOC CY 2008\EOC LETTERS\EOC MEETING NOTICES\MONTICELLO 2008 EOC MEETING LETTER.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME NShah:dtp KRiemer
- NShah for DATE 06/19/09 06/19/09 OFFICIAL RECORD COPY
Letter to T. OConnor from K. Riemer dated June 19, 2009
SUBJECT:
PUBLIC MEETING/OPEN HOUSE TO REVIEW 2008 END-OF-CYCLE PERFORMANCE ASSESSMENT FOR MONTICELLO NUCLEAR GENERATING PLANT cc: D. Koehl, Chief Nuclear Officer Manager, Nuclear Safety Assessment P. Glass, Assistant General Counsel Nuclear Asset Manager, Xcel Energy, Inc.
J. Stine, State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency R. Hiivala, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office Chairman, Wright County Board Mayor of Monticello Chairperson, Sherburne County Administrator, City of Monticello G. Mortensen, INPO
Letter to T. OConnor from K. Riemer dated June 19, 2009
SUBJECT:
PUBLIC MEETING/OPEN HOUSE TO REVIEW 2008 END-OF-CYCLE PERFORMANCE ASSESSMENT FOR MONTICELLO NUCLEAR GENERATING PLANT DISTRIBUTION:
Tamara Bloomer RidsNrrDorlLpl3-1 RidsNrrPMMonticello RidsNrrDirsIpab Resource Patrick Hiland Kenneth Obrien Jared Heck Allan Barker DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource