Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML17325B5191999-03-29029 March 1999 Forwards LER 99-001-00,re Degraded Component Cw Flow to Containment Main Steam Line Penetrations.Commitment, Listed ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4751999-03-18018 March 1999 Forwards LER 99-004-00,re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitment Made by Util,Listed ML17325B4721999-03-18018 March 1999 Forwards LER 99-005-00,re Reactor Trip Breaker Manual Actuations During Rod Drop Testing Not Previously Reported. Listed Commitments Identified in Submittal ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation 1999-09-30
[Table view] Category:UTILITY TO NRC
MONTHYEARML17328A4481990-09-21021 September 1990 Requests Withdrawal of Mode 6 Proposed Tech Spec Change Since Issue Currently Being Addressed by New STSs ML17328A4331990-08-27027 August 1990 Informs of Preliminary Assessment of 900713 Electrical Contact Accident at Facility.Investigation Concludes That No Safety Rules Violated ML17328A4001990-08-24024 August 1990 Responds to 900725 Ltr Re Commitments Made in Response to Generic Ltr 88-14 on Instrument Air Supply Problems Affecting safety-related Equipment.Simulator Training to Be Provided as Stated ML17334B3781990-08-24024 August 1990 Forwards Info to Certify Plant Simulator Facility.Results of Evaluation of Dual Unit Simulation Facilities Demonstrate That Plant Simulator Performance Compares Favorably W/Units ML17328A4231990-08-21021 August 1990 Forwards Under Separate Cover,Semiannual Radioactive Effluent Release Rept for Jan-June 1990 ML17328A3901990-08-17017 August 1990 Responds to NRC 900720 Ltr Re Violations Noted in Onsite Audit of Spds.Corrective Actions:Apparent Disparity in Selection of Reactor Trip & Sys Capacity or Anticipatory Values Rectified ML17328A3891990-08-15015 August 1990 Forwards Performance Data Sheets for Plant fitness-for-duty Program for Period Jan-June 1990,per 10CFR26.Encl Includes Statistics on Various Categories of Testing,Substances Tested for & cut-off Levels Used ML17328A3571990-08-0202 August 1990 Responds to Open Items in Safety Evaluation of Util Response to Unresolved Issues on post-fire Safe Shutdown Methodology. Open Items 1 & 21 Will Be Closed by Implementing Plant Procedures Providing Equivalent Degree of Protection ML17328A3431990-07-23023 July 1990 Requests Withdrawal of 890830 Proposed Tech Spec Changes Re Sections 3.0 & 4.0.Util Will Resubmit Generic Ltr 87-09 Recommended Improvement Items on Case by Case Basis ML17328A3421990-07-23023 July 1990 Provides Results of Offsite Dose Calculation for Reactor Coolant Pump Locked Rotor Event for Facility Cycle 8.Util Identified Previously Issued SERs Addressing Short Term Containment Analysis & LOCA Containment Integrity ML20055G7551990-07-18018 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-315/90-10 & 50-316/90-10.Corrective Actions:Required Review Performed & Updated Procedure 12 Mhp 5021.019.001 Revised & Issued ML17328A3191990-07-12012 July 1990 Responds to NRC 900601 Ltr Re Violations Noted in Insp Repts 50-315/89-31 & 50-316/89-31.Corrective Actions:Electrical Testing Techniques Improved & Surveillance Procedures for Feedwater Pumps Will Be Rewritten ML17328A3181990-07-0909 July 1990 Responds to Generic Ltr 90-03,Suppl 1, Relaxation of Staff Position in Generic Ltr 83-28,Item 2.2,Part 2, 'Vendor Interface for Safety-Related Components.' Licensee Will Contact safety-related Vendors on Annual Basis ML17328A3111990-07-0303 July 1990 Provides Certification of Funding Plan for Decommissioning of Plant,Per 10CFR50.33 & 50.75 ML17328A2961990-06-25025 June 1990 Forwards Response to Generic Ltr 90-04 Re Closeout of Generic Safety Issues.Util Supports Concern & Desire to Close long-standing Generic Safety Issues ML17328A2921990-06-22022 June 1990 Forwards WCAP-12483, Analysis of Capsule U from American Electric Power Co DC Cook Unit 1 Reactor Vessel Radiation Surveillance Program. ML20044A3521990-06-22022 June 1990 Submits Info Re Sensitivity Study Performed on Number of Fuel Axial Intervals,Per Topical Rept, American Electric Power Reactor Core Thermal-Hydraulic Analysis Using Cobra III-C/MIT-2 Computer Code. ML17328A2821990-06-15015 June 1990 Submits Ltr Re Proposed Control Room Habitability Tech Spec Changes & Supporting Analyses,Per 900521 Discussion.Revised Calculations of Control Room Thyroid Doses Will Be Submitted within 60 Days of Receipt of Proposed Generic Ltr ML17328A2741990-06-12012 June 1990 Submits Followup,Per 900205 & 0308 Ltrs & Provides Update Re Inoperable Fire Barrier.Fire Seal Repaired & Restored to Operability on 900419 ML17328A2551990-06-0505 June 1990 Forwards Addl Info Re Util 900126 Revised Response to NRC Bulletin 88-002,per NRC 900509 Request ML17328A7361990-06-0101 June 1990 Forwards Addl Info Re 890825 & 1212 Applications for Amends to Licenses DPR-58 & DPR-74,per Request.Amends Make Changes to Administrative Controls ML17328A7331990-05-29029 May 1990 Forwards Nonproprietary WCAP-12577 & Proprietary WCAP-12576, Westinghouse Revised Thermal Design Procedure Instrument... Methodology for American Electric Power DC Cook Unit 2 Nuclear Power Station, Per 900419 Commitment ML17328A7321990-05-24024 May 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Model 1153 Series B or D or Model 1154 Transmitters Installed at Facility.Transmitters Purchased as commercial-grade Units ML17328A6991990-05-0909 May 1990 Provides Suppl to 900103 Response,Certifying That Fitness for Duty Program Implemented at Plant.Change Also Clarifies When More Stringent cut-off Levels Adopted at Plant Program Apply ML17328A7001990-05-0909 May 1990 Responds to NRC 900406 Ltr Re Inadequacies of Spds,Per Audit on 900221-22.Corrective Actions:Software Mod Will Prevent User from Accessing Displays Other than Iconic Displays from SPDS Dedicated Terminal ML17328A7071990-05-0707 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept Mar 1990 for Donald C Cook Nuclear Plant Unit 1 ML17328A7031990-05-0707 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Rept for Mar 1990 for DC Cook Nuclear Plant Unit 2 ML17328A6951990-04-30030 April 1990 Certifies That Training Programs for Initial Licensing & Requalification Training of Operators & Senior Operators at Plant Accredited by Inpo,Per Generic Ltr 87-07 ML17328A6861990-04-30030 April 1990 Forwards Annual Environ Operating Rept,Jan-Dec 1989, & DC Cook Nuclear Plant Units 1 & 2 Operational Radiological Environ Monitoring Program 1989 Rept Jan-Dec 1989. ML17328A6801990-04-23023 April 1990 Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Study Planned to Evaluate Alternative Actions to Be Taken for Protecting RHR Pumps ML17328A6771990-04-23023 April 1990 Forwards DC Cook Nuclear Plant 1990 Annual Emergency Preparedness Exercise. Exercise Scope & Objectives & Detailed Scenario Documentation Encl ML17334B3641990-04-11011 April 1990 Responds to NRC 900301 Ltr Re Violations Noted in Insp Repts 50-315/89-31 & 50-316/89-31.Corrective Actions:Reliability Centered Maint Program Initiated ML17328A6601990-04-11011 April 1990 Forwards Updated QA Program Description for Cook Nuclear Plant, Incorporating Editorial,Organizational & Position Title Changes ML17328A6551990-04-0909 April 1990 Responds to NRC 900309 Ltr Re Violations Noted in Insp Rept 50-316/90-08.Corrective Actions:Procedure for Steam Generator Stop Valve Operability Test Revised to Require That MSIV Be Declared Inoperable After Failing Stroke Test ML17334B3601990-04-0606 April 1990 Forwards Revised Figures for Loss of Load Event Previously Submitted in Attachment 4,App B of Vantage 5 Reload Transition Safety Rept Supplied by Westinghouse in Jan 1990. Update Is Editorial in Nature ML17334B3621990-04-0606 April 1990 Forwards 1989 Annual Rept & Projected Cash Flow ML17328A6341990-03-30030 March 1990 Forwards Application for Renewal of Plant NPDES Permit,For Info,Per Section 3.2 of App B to Plant Tech Specs.W/O Encl ML17328A6331990-03-30030 March 1990 Responds to NUMARC 900104 Request for Addl Info Re Station Blackout Submittals.Target Reliability for Emergency Diesel Generator of 0.0975 Established for 4 H ac-independent Coping Category Will Be Maintained ML17328A6321990-03-30030 March 1990 Forwards Response to Generic Ltr 90-01, NRC Regulatory Impact Survey. Util Ack Recommendation by NUMARC ML17328A6221990-03-27027 March 1990 Responds to 900226 Ltr Transmitting Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $75,000. Corrective Actions:Flow Retention Circuitry Setpoints Set to Compensate for Missized Process Flow Orifice ML17328A6191990-03-27027 March 1990 Forwards Payment in Amount of $75,000 for Civil Penalty Imposed Through Notice of Violation Issued in Insp Rept 50-316/89-02 on 891016-20,24-26 & 1204.Response to Violation & Corrective Actions Provided in Separate Submittal ML17328A6161990-03-20020 March 1990 Responds to Generic Ltr 89-19 Re Safety Implications of Control Sys in LWRs (USI A-47).Both Units Have Steam Overfill Protection Sys That Would Automatically Prevent Water Carryover Into Steam Lines If Control Sys Failed ML17328A6121990-03-13013 March 1990 Forwards Monthly Performance Monitoring Rept,Jan 1990. ML17325B3901990-03-0606 March 1990 Forwards Annual Rept to NRC Per 10CFR50.54(W)(2) Re Nuclear Property Insurance ML17325B3921990-03-0606 March 1990 Modifies Application for Amend to License DPR-74 Re Cycle 8, Per 900228 Telcon ML17325B3781990-02-28028 February 1990 Forwards Response to NRC Info Notice 89-056 Re Questionable Certification of Matl Supplied to Dod by Nuclear Suppliers. Matl Capable of Performing Design Function & Acceptable for Continued Use ML17328A5971990-02-27027 February 1990 Withdraws 890203 Application for Amend to License DPR-74, Modifying Tech Spec Table 3.2-1 Re DNB Parameters to Express RCS Flow Rate on Volumetric Rather than Mass Basis ML17334B3511990-02-22022 February 1990 Submits Annual Rept of Changes to or Errors in Acceptable LOCA Evaluation Models or Application of Models for Plants. Wflash Analyses Will Be Superceded by Notrump Analyses for Unit 2,Cycle 8 Reload ML17328A5881990-02-21021 February 1990 Responds to NRC 890914 Request for Addl Info Re Safe Shutdown Methodology.App R Fire Barriers Being Maintained & Surveilled Under 3/4.7.10 for Units 1 & 2 ML17328A5861990-02-16016 February 1990 Provides Revised Comments in Response to NRR Comments During 891213 Telcon Re Allowable Stresses for Piping & Piping Supports 1990-09-21
[Table view] |
Text
R'iiuL i~t'v'I-GHIl AT ID u OISTHI6v I 1 S I STF i (RIOS)bCCE,SSiu!i 1;oR::~30>
I-AC ll:50-315 Oona 50-3to Dona A U T il~i~A i EF~t(L P~vlA'i,'iv 7 g 1V, Tg,<C, Pu0'Iil DuC.I)ATt:
R3/05/Q4 IvTARIZLO:
ISO 1 o C.Coolc induc)ear ro~er P)anti Uni t 1 s Inn I a C.Coo~i~ucl ear goTTer r'I anti Iini t dE ino Aul liuR nr FILI A I'Iur inoiana 4'">chigan f:lectric (.o."EFC Jr IE'.I OFF[LI)i TIDE'-It f i ce of buc 1 ear Reactor IT'e.-jul at i one 9 ir ec OOCKFT iana R 0500<15 iana~VOV3 t.or bI.>Jt.C T:<es+onr1s e-';ii i on e n reserved'Tua 1 i f i c to'ViEC t intel rul e on)GCI.Rb0~EI~re e I ectri t env>run dual i tication.Rignt to aaeno resp un t i I 1riee t jnq w/1.'RC scneou I eo to r eso 1 ve e ation deflclencles
~onse nvlron ClSTHT'rrri1"'r C r>r.l>U4rrS CO'r TES"ECETVEr:<Trv E'l Cl.g"Tr!E: T 1 I'Lc.'TT/i-i cens iET<>Suuml t ta i: E<quioinent Dua 1 i f i ca t ion TIC I L S:=<I'.C iT-" li'i i I v gr.dF/!.~By P~>upv I"i.1C i-0r'.r S 1 T IP FivCL RLi.II'fvv T I0 Curat./'~/it 8>I(~alii.G I D1~I (l 01 CD~I<S L I Tr.E.'~CL Ii~I Er,W~L: LI</vu~'p 3.iI.TR<</42/f....
'vv rW/v'.,rv F lc Ag Ov VA l 1 I C COL 4D E.I'tr'R/OL UI I<v'>ET,R/i) o I/At,(<Rgrvi3 13 LI'i)i<"3 IL ,'33, Td 5 INDIANA L, MICHIGAN ELECTRIC COMPANY P.O.BOX 18 BOWLING GREEN STATION NEW YORK, N.Y.10004 May 20, 1983 AEP:NRC:0775C Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 FINAL RULE ON EQUIPMENT ENVIR011MENTAL QUALIFICATION (10 CFR 50.49)Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555
Dear Mr,
Denton: This letter and its Attachments respond to the NRC's final rule 10 CFR 50.49,"Environmental Qualification of Electric Equipment Important to Safety for Nuclear Power Plants" puhlished in the Federal Register., Vol.48, No.13, dated January 21, 1983, pp.2729-2734, and to the clarification letter dated April 27, 1983 (Mr.S.A.Varga of the NRC to our Mr.J.E.Dolan).More specifically, we read 10 CFR 50.49(g)as requiring that we identify the electric equipment important to safety within the scope of the rule (that is, safety related, non-safety related, and certain post-accident monitoring equipment as defined in 10 CFR 50.49(b)(1) through (b)(3)), and those equipment items which we believe to be already qualified, and to establish a goal of final environmental qualification not to exceed the end of the second refueling outage after March 31, 1982, or by March 31, 1985 (whichever is earlier), for those equipment items for which qualification has not yet been established.
Furthermore, the clarification letter referenced, above requested us to indicate whether our previous submittals comply with paragraphs (a)and (b)of 10 CFR 50.49, to describe the methods used to identify the non-safety related electric equipment defined by 10 CFR 50.49(b)(2), and to establish any qualification programs not previously described for such non-safety related equipment.
We must first note for the record that we have repeatedly attempted during the past few months to meet with the NRC staff in order to clarify and resolve the environmental qualification"deficiencies" identified in the Technical Evaluation Reports (TERs)prepared by the Franklin Research Center (FRC)under contract to the NRC (see our letter AEP:NRC:0775, dated January 24, 1983).To date, a meeting has not been scheduled so that we could achieve resolution with NRC staff on this important topic.Therefore, we reserve the right to amend this SGO5260281 830520 r'!3F<ADQCK 05000315 PDR Mr.Harold R.on-2-AEP:NRC: 0775C response until such time as we may discuss the FRC TERs with your staff and arrive at an understanding of present qualification requirements.
Furthermore, if as a result of other activities (either internally generated or in response to other regulatory issues, such as Generic Letter No.82-33)it is determined that additional equipment should be included within the scope of the final rule and/or it is determined that equipment items identified in Attachment 1 to this letter require upgrading, this letter will be correspondingly amended.With the above provisos, Attachm'ents 1 through 6 to this letter provide the information requested by 10 CFR 50.49(g)and the NRC clarification letter referenced above.Specifically, Attachment 1 provides a list of equipment which we presently believe to fall within the scope of the environmental qualification final rule.The Attachment provides a listing of equipment manufacturers and model/Plant item numbers, a brief description of each equipment item, Plant identification numbers, a reference to a System Component Evaluation Worksheet (SCEW)in our AEP:NRC:0578B submittal (dated June ll, 1982), and an indication regarding whether the equipment is believed to be qualified or if qualification has not yet been established.
Not all of these equipment items (such as certain cables and cable terminations identified as a result of the NUREG-0737 reviews)have been identified in our previous submittals on environmental qualification.
The equipment list in Attachment 1 references, in the case of equipment for which qualification has not yet been established, one or more of the other Attachments to this letter.Specifically, Attachment 2 discusses aging qualification required by Section 7.0 of the DOR Guidelines.
Attachment 3 discusses those equipment items presently identified as falling under the scope of our response to Generic Letter No.82-33 (see our letter No.AEP:NRC:0773, dated April 15, 1983).Attachment 4 discusses certain Resistance Temperature Detectors (RTDs)which will be replaced in connection with the program established to meet the requirements of 10 CFR 50, Appendix R (see our letter No.AEP:NRC:0692E, dated March 31, 1983).Attachment 5 discusses the test qualification program currently underway.,with regard to our containment spray pump motors manufactured by Reliance Electric.Where applicable, requests for final environmental qualification schedular extensions under the provisions of 10 CFR 50.49(g)are included in the Attachments to this letter.Attachment 6 to this letter provides a brief description of the methods used to identify the equipment defined by 10 CFR 50.49(b).
Mr.Harold R.~on 3 I AEP:NRC:0775C This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.
Very truly yours, Vice President RFH/os cc: J.E.Dolan-Columbus R.S.Hunter M.P.Alexich R.W.Jurgensen W.G.Smith, Jr.-Bridgman R.C.Callen G.Charnoff NRC Resident Inspector at Cook Plant-Bridgman Attachment 1 to AEP:NRC:0775C Donald C.Cook Nuclear Plant Unit Nos.1 and 2 10 CFR 50.49()E ui ment List The enclosed table contains a list of those equipment items presently known to be installed at the D.C.Cook Nuclear Plant Unit Nos, 1 and 2 and which we believe to be within the scope of 10 CFR 50.49(b)(1) through (b)(3).The identified equipment items are relied on to remain functional during and following a design basis accident.For each equipment item identified, the following information is provided in the table: AEP:NRC:0578B submittal System Component Evaluation Worksheet (SCEW)reference(s).
This reference is not intended to imply that the AEP:NRC:0578B submittal, dated June 11, 1982, provides the most up-to-date qualification data.Rather, the reference is intended to provide guidance with regard to identifying those Plant systems which utilize the equipment item~(2)Identification of the D.C.Cook Plant Unit(s)in which the equipment is installed.
(3)Equipment manufacturer(s).
(4)Equipment model or-"Plant item number(s).'*-(5)A brief description of the equipment item.(6)Plant identification (i.e., tag)number(s).
(7)An indication as to whether the equipment is qualified, or whether qualification has not yet been established.
In the latter case, an entry has been made in the table which references at least one other attachment to this letter.The referenced attachment(s) provides a description of the open item(s)and, when applicable, a request for schedular extension under the provisions of 10 CFR 50.49(g).
e DPNALD C.COOK NUCLEAR PLANT'CCSISCSC5~W~
UfVXT NOS.i AND 2 1 0 C F R 5'0.4'I(l)
EQ.U j.PgE'NT LT.5T AEP:NRCi O57+8"SCEW" SHEET NUBBER, CC k CC3 CC5 CC4, CC7 Cc'I CCXO CZ" C r 3m.;t 1)~*m."" o.c.coog qN>j No(s).1 Q of i Q.EQ.OZPH Ehl l HANLlFAC TLlRER HODEL.NI.(ABER Continental Co~Uinentaf EIRO.hnac.Ja Continenta I"3IRO 3IRI General Electric 3I 2 I Continental General Electric C~tinental"3IM.3l 3.3 Cacnev al Electric 3I k 3 8".t.~r sul<teJ%i~Rockbestos Sainue.l Moore Continent.ta
/Boston, Ins'klan 4 Mire,"-3O64"'3o64"3OTS+30 l5 3075 General Electric,+3I RO Eaux PHENT'ESCtupTXON
%/C,"lR Cu~mr oLC~Lle w/c")2 Cu C n4xg3 C 4Je+/c,"e.Cu c..C I S/C"lz Cu~trof fCagb 7/C.Ik Cu Ccwtro~a~f 7/C IR Cu~tvo]Coal IR/C~~lk Cu Coi.tfof Co,ble n/C"Ia.Cu Co~e~f 41k ls/c'2.Cu Co~yy~l c ale l5'/C l2.Cu~ant.r4 c bh 2/C.+I6 Cu rnstra~y.t C f Jg>/C"fa C r.p~gi deny C\fe 2 sTP'"'(.Cu Ir straiggw~Cn4]g 1.STP II)Cu Xz-.txuwent C..l le.1 STP IQ Cu instrument C f fe.PLANTD WuVBER83 Various Various Various Various Various Vwioqs Various Var ious Various Various Various Various VariouS Various Various gALXFZCATrOQ gpT EsTABLZSIIEO Qg ALXFXED Attachment 2.Attach.le'en'8 Attoc hment 2.Attachment-k Amocl~en'.Attac4nen.t 2.Attachr ent Attac,k~ent
~Att ac4nenh c Attachment X Attac l rien.t 2.httac,hyena 2 Attocl~en.4 k, Attockinemt al.Attach.ine>6 LZ-I TION S7AT"
AEP.-NRc.:
os7e B"scEe" SIIEE7 NuHBER era GER.Q G I 1 i(@nial)C,X is (u.;+a.)C.Z 1 Z(u.;ti)c.zis(u.;X c.P i CP 3 (t/;t 1)CPi On C P~t.'un;C 1.)D.G.cooK IANZ7 NO(5'3.i~2 EeurPMEA/7 M ANu FACTARER Cerro Wire L.Cable Samuel Moore Continental H AVE&H Avat-Okonit;e Esse,x 04nit;e, MODEL NuH BER 3077."3O77.vt PO77 M/A~324+3'I'I EQuzl'HEA/7 OESCRr PTXON 1 STQ, lk Cu X~i~ee Calel p 1 STQ.IG Cu K~~~en~Ca e i STa,"I/Cu Kal ton rnsulaacJ Penetrc Cion Feel-Ckrough Extension K I to Tnsa lacer(Penetrafion.
Fcc l through Extension.
3TC~Q, Cu Powev Cap e.3Tc."Iz Cu Pow~eCak I i/c 3.Cu p e C PLAer rD Nues BER(S)Various Various Various Various Various Various Q,t/I ALIT 7 Q.unLx I=XED httach~en+
2.ACtac hmez4 AMack~en4 oI.hteach e>e 2 ht:tac men.'t ht;tach en'.auh Lr Fr CA rr oN hlov'STABLT5HED hctactepnent' ht tackment: C P 5'<<;ti)C P 1,3.~un~tk c P~('-t;t 1.)~~PP'e;e x3 C P 7 (I/nit: c.p~(u.;c1>CPg (inta~o o.t-two c p i 0 (u;,t 1)eo'.I--'el.CP1 1 c P ik(u'ci)c.p+(u.;c a.)1~2 Anaconda Okoni t e Anac onJa Essex Keriae, Anaconcta Keritc Cyprus~RIOR'~el oa.3 1/C"R hl eee~C[e.~i/C"~AI~p~e~c~g~3 i/G 1o Cu~~ec~al J 3 1/C 10 Cu~PLee C Llo 3 1/c"10 C<~P~re C Q'/C"%nl Pow5~~4 5 1/c 2 Cg Po~e~Cnb Jg"3I<<~3llb-~3I03-3I3.7~~B+7.3 Z/c"2 Cu Povler (able Various VariouS Various Various Various Various Various Varioct S httackn~enh ht;t,ackment oL ht:t-'achiest Attachment 2.hCt'a>k~e t;L httachinen,t.
2.hht ac4ien6 Attack>~e) t 2.'
AF P)NRC-057'6B D.C.C00K"SCEWn SHEET nNZT NO(Q.NHt'1 BEE cv is(u.;tQ CP5 n t2 C.j: 11 CZ 1%CZ 1+CPA.CF'7 EQ.OXPMEAIT MAW FACTH RE%Anaconda Boston Znoulake~~i R ycl ew Continenta I Cyprus Cyprus,"7 iQODFL~tNH8ER 3+7"30-l7 3I I I 304g"3loZ EGAXPH EN 7 DeSC RI;PTZON 3 1/C"a.Cu Xnstruwcnt C+a R6 1.1 Atu Tric X I.4~e 1.IC Ik Cu~nota~~+XsL 3 TCI k C~~~1 31/C."Z nI l'LANT Xl7 AIIIrrt BERCS)Various VRYIONS Various VariouS Various VariouS 6 WALXFXED RM A LI FZCA7rojtj goT E5'7ABLZS]IED Attachment 2.nttacl,ment Abbacl~en+R, A ttachmen,d Attac ment 2.e.W r FXCA7 ron/5TATas P PtD1 EP OoL l-2.Conn<Cor p.Cona.x, Corp.QeStingt~1Se.QestinghousC, EP->TI rough EP-10 TBOP 4-kv Electrical c,~.tin~600-v an)Below electric I Fan Motors Ilylrogev o VariouS VcY ious IIV-CEQ.-X uL-r E~L oR-1 I Attachment 2.Attachment Attachment Attach.nugent X 1 X1$X1'3 (II it Q;z1>xR>%13) r1g Q-t2.)*3 (un t Q T 4{Mnit k)X 4(u.it 1.X 5Glnit 2)ITT Bar tort.FoXhoro Foxbcro M 764 Lot1 H 164 Lot 3.D;Aerent al Pre.ssur e TronStni tter EI30N-IlsAfll (IAGA)NE I 3-Orl-II-X-Ml-D~Di Per cntia l Pressure, DiAerev.tial Pressure TYan'twitter BLP-IIO)111)112)120>12I>12'>130>I 31>13 2)1+0)I%I)I+2.N FC I IO>ill>12'kl>130)131)14 0,i+I gJJ~~~~I5~154 FFC-3.los.II) 220 H.l)<<30)331>2 F Fg-210)23.0)230>240 A tatoL e t A+tacgrne~C k At+ackment 3-AEPI NRCI 057%8"SCOW" SHZey NMH BER D.C.C,oox.EaIAr PROEM r lANZT h/0 (.5).t"1hNW FAC URER HODEL.NMMBER EGQXPHEAIT DESC RXPTXOIV PLANT XD NHM BER(S)Q.HALzr-xcnrzohl sTArus Q.Ail LXFZCATXOhl Q.H ALEFXED YoT ESTABLXSII LD~-TX I.(u;,tD Z 1 5'uit 2)X 1.9>>X3.0)X21>>X23.X>3 XR4 (II.;t s);x~o, X21 T22)223>~a~'xze..&-'
XR5>>ZXL>>227 (I,I;t 1);X2@, X>7 (u.;t a)FO>>I borO rTT Barton H-E-Sost>>an.or RoSelnoanh EIIGIA-Pressure IISACI (Hch)Ti.ansmi++er
'>>I765 Lot1 Pressure.H 7f.3 Lo" 2.Tr ns issuer II%34 9 or Res>>stance.
l74 KI->>.Te>>peratc re.ReSpectIVely DeteetOr MPP 2IO>>All>220~
22t,a30,23I,~ho~I*MPP-l5'I I52 l53 UPS-IXI ling.>>I53 g T P-llo>>III>>I2o, I2I>isO>l3 I>llo>>I+I>klo>2II 2M>2%I>89o>>k3I>240>Abtack>>net>>4 oI.hot cL~ent-2 At Cack>>nant k, L51 1 k II.E.Sost>>an.or RoseInount
'Pest>>ng house R,e>>ance A&CO II9OI 5 or'74 KS>>Res ec>>ivel EA 1%0 p 5%osz>5'009 II>op'I-24 Frame"5%l.oZ 2oG-3%I-RRYM Resistance 1 e~perature Detector Li~t Ski to I Pion>>p Ho Col Pa>>n p Hotol-Sole,no i 3 Valve NTR-Ilo>i2O>130>>H.O)2IO>>>>>>~O~>>>>0 RA Li>>I t switches<or hlRV-15 I>>MR P P-050>>PP-oRG>>PP-oo9 X.S0-2'I l,x9a 2'I 3>>R'I4>>205>klan~Attack>>nen.b
+$44acl~en.t R An.acl I~el t~~Co,cb~~e nt At.t,acl~en', S11,>>517>'Iv/g'o>-450-32.0 Asc.0 gP-'b3l O'-, Solewoi A~wv,.V lve/50-I2>>Q.I>l3,I>>I 22>>I23>>I2+I2.5>IRG, I+7 M.0>503>505'>507 Attacli>>nent k,
AF P: AIRC: 05'7'i5 8'SCElv" SllEET Nara DER o.c~cooK EeurPMERlr Hhlx7 bio(50.HANAFACTHRER, HoDEL NuMBER Eaur PMEhl T pFcC RrPTXoh/PLAMT ZD NuzSER.(S)
Q.L<ALx Fx ED e.u ALz rscAmr ohl NO7 EST/I BLZSHED G.H LrrZCA rou S7AYuS Tci~TC2.~Tc.S~TC+~TC 10 T'C 11, T'c, 12 c TC.Gq TX3)T'P i TC7, Tr4->TPot T'C 17 TZ1,, rzq Y'Z:5'3 1o 1~2 N/A N A Cosa'.hl/A hl/W Nl4 hf A hl/A hl/1 hl ll:=, Al A)'<C..e" l C.l,le Ter v inatiov A t, Valve Operator solid Rapt'on.spliced 7'o&t:randed K pea Inside Ho J-Hp Str e K pt'oli.e.l T.';.Id C.ble h~Flood-l
>inal riel cable splice Rt Ter>>inat;>on-Atear Valve Actual:ov-Or Cable Ter>>i~son lib Terminal AlAMCO L Sw>t J Cable Ter>>inatio~-Lll~Barrio~Xnstru~ent C~n Connection-To Fo<boro Xnstr~-cu~spJ'%is+
xns~rn>>ew5 Field Cable Splice To t'enetral io v Feed<1 ro~L Wive N/A A//A hl A Abaca J men4 ot A&ac AMac)n,end 2 Att:ac(.penh 2.At+.acgvnent ot.flttacl rie~5 0 AtCgckvnen5 ot Attac4~enb ot Attachment fieCackmene
- k.
AEP:NRC: os7 b B"SCE<v"&IIEET MurlBER.,.D.C.CoOK HtJTT goCs)EauXPHEHT Vor EL EauXPMENT PLAINT XD MANHFncTQRER IUQMBER DEscRZPTToh/
IlIHH'BER(53 Q.MALXFXC T Oh/5TATHS sMALLFzcnTxoM aHALZFXED Nol-ESTABLXSIIED T P3, TP5, TPG V1>V3.V4-vS,VQ,V7, v'f)Vio>V 1x M/A Li~ieor~ue, IV/A E, N/A SI16-I>SMB-oo>Sr(S-Q.>.SMB-OoO Te.ruination A 5 Valve.Motors>Fa~Motors>A>>d Ily Jvoelem Poiv er Ca LIE'.Terwi>>atio>>.
A6 Valve Motor O~erators Var)ousl.'S<O;A:ere.e Ta~rju~bers)nba'ackmen8 Ace cl ei,e Q Attacgsmen+
N/n P.aye,4.n Brai 4 ReIt.Rayche.~BraD R.ea Branh Rex RayJwew~AEP Design.E-Cona)c Corp.AEP Design 0-Conan Covg XTT Bar+ov"3'+<3ov4 II~Cab e.Rc II 0 Cab"3II 2 R.c II Au C hie RGi II AH~b II.C~5"I B/H~4 R.C 51 a(v, Ca eje Ca'hie Tevmi>>a.-+ion.a4 RM 5 ZMe~<<~x,+Calque Ters i~-tion.oct Cl arete Conver4ev.(ncou'tic r"Ion.-'to~3I I 2+305/III/A ug 7(g+>l3iFCeren.tia l 7 6+.Vressur e Trans~ittrs Various Various Various s Var iou s Various Vav ious N/A ALA-3Io NLE-I I 0>IRO>I III>IXI>I 3 I>3II>3'>3%I 4&acLI e,~e 2 heeack~eI.t, 2.4tt;aCkI ieu,0 2 4tgac,h~~en+
Attahment 2.attach>>en 4 Attract~e~t 2.Aaeacl.e~e 2 AteackweIi4 9
AEP:hlRG-05'7%8'SCEN('H EE7 AIOI"1 BEF'.C.COOK urvXT NO(sk EG.UXPH EN T rahrvu FncTl4RER Y HoDEL-hfMMBER, EQHEPHENT PLAAIT'D DE5CRXPTrON NOH BER(S)A,MALXFZCATXON STATUS All h LXf'SCAT'Eohl glAQFZED AloT E&7ABLXSIIED N/h N/L Nh T~rgeC Rock.Corps Techno ops for Energy>>Endevco (via TEC)V i c.h or ee.n-Eber ine, ZOO>>5O'l Ag aR74).22.73 AM I>>o2&6-3<%77-I'-Pcous&ic a ve Flow Monitor in)Syskew Co~t on-Rt"1S DeCeccor Ogl-@Ca.Rr~S Detector 79AB-007 So jenoig Ac<a~<lhe,Valve tl50 Okf>>ORZ>>O23>>OR4)OQ)04k)~0.3 o+Q,R-lo7 A>>lo78>>lo7D)lo7 6 VRQ-l3 l 0>>141 0 CQni 5i)Vr A-Z3IO>>24)o~l)g~V RS-I 1 0 I>>1>O1(u.e X)V R.S-2 I 0 I)awol&eR)AekacL.niente 3'l bbackment Anzac.L~ene 3 Alt ach,~en.L 3 Noge: Plal,g"gee~IVuw4rS Are, Xv 5o~e CaSeS)I'resen4ecf Xns+eaoC Of Ho Jel Nui~i)ev g 0 Attachment 2 to AEP:NRC:0775C Donald C.Cook Nuclear Plant Unit Nos.1 and 2 in Qualification In Attachment 7 to the AEP:NRC:0578B submittal dated June 11, 1982, we committed to perform an aging analysis and to establish a surveillance/maintenance/replacement program (based on the results of the aging analysis)for equipment installed in a potentially harsh environment and within the scope of IE Bulletin No.79-01B.To this end, we have contracted the serv'es of EDS Nuclear, Inc., to perform the aging analysis and, after review of D.C.Cook Nuclear Plant surveillance and maintenance procedures, to propose the necessary changes to these procedures so that a surveillance/maintenance/
replacement program will be established to bring the Plant into compliance with Section 7.0 of the DOR Guidelines (Enclosure 4 to IE Bulletin No.79-01B, transmitted via letter dated January 16, 1980, J.G.Keppler to J.E.Dolan).In accordance with 10 CFR 50.49(g), we note that the schedule for final environmental qualification of equipment items should, whenever possible, establish a goal of qualification by the end of the second refueling outage after Harch 31, 1982, or by Harch 31, 1985, whichever is earlier.The applicable dates for the D.C.Cook Nuclear Plant Unit Nos.1 and 2 are approximately September 1, 1983, and April 1, 1984, ,rgspectively, based on recent.estimates of refueling outage schedules..
At present, we do not know how many Plant surveillance and maintenance procedures will have to be revised as a result of the aging analysis findings.It is presently anticipated; however, that the aging analysis and input to be used in the revision of the surveillance and maintenance procedures will be completed by EDS Nuclear, Inc., on or before August 31, 1983.A complete revision to the D.C.Cook Nuclear Plant surveillance and maintenance procedures and the establishment of the surveillance/maintenance/replacement program will be completed by November 30, 1985.Therefore, under the provisions of 10 CFR 50.49(g), we hereby request a schedular extension to November 30, 1985for the establishment of a surveillance/maintenance/replacement program at the D.C.Cook Nuclear Plant.This request for extension applies to all those equipment items identified in Attachment 1 to this letter for which"Attachment 2" has been entered in the"Qualification Not Established" column.
Attachment 3 to AFP:NRC:0775C Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Generic Letter 82-33 and Regulatory Guide 1.97 (Rev.2)E ui ment Items Attachment 1 to this letter identifies certain equipment items for which"Attachment 3" has been entered in the"Qualification Not Established" column.The equipment items so identified are currently being reviewed in light of the guidance contained in Regulatory Guide 1.97, Revision 2, and under the requirements of Generic Letter 82-33 (which provides for incorporation of this review into the integrated program established by NUREG-0737, Supplement 1).As committed to by our letter AEP:NRC:0773, dated April'15, 1983, we will provide the NRC staff with a review and replacement schedule (if any)six (6)months following implementation of new Emergency Operating Procedures.
Until such time as these tasks are completed and the qualification test reports are received and reviewed for acceptability, a final schedule for qualification cannot be developed.
The replacement schedule (if any)will, however, consider procurement lead times, test complications, installation problems, etc.Therefore, in accordance witn the provisions oz 10 CFR 50.49 (g), a request for schedular extension of final qualification to Novembe" 30, 1985, is hereby made.for those equipment items identified as relating to Generic Letter 82-33, Supple'.ent i to NUREG-0737, and Revision 2 to Regulatory Guide 1.97, This request for schedular extension applies to both Units of the D.C.Cook Nuclear Plant.Furthermore, if (as a result of these reviews)additional equipment i,tems are ident'fied as being within the scope of the final rule and/or that equipment presently identified in Attachment 1 to this letter requires upgrading, this submittal will be amended.
Attachment 4 to AEP:NRC:0775C Donald C.Cook Nuclear Plant Unit Nos.1 and 2 RTD Re lacement The H.E.Sostman Model 811901B and Rosemount Model/I'176KS Resistance Temperature Detectors (RTDs)identified in our AEP:NRC:0578B submittal (see the System Component Evaluation Vorksheet,"SCEN" Z28)are being replaced in connection with the program established to meet the requirements of 10 CFR 50, Appendix R.As noted in our letter AEP:NRC:0692E, dated Harch 31, 1983, completion of this task is scheduled for August 1985.Therefore, in accordance with the provisions of 10 CFR 50.49(g), a schedular extension to September 1, 1985, is hereby requested for final qualification of the RTDs identified above.This request is applicable to both Units of the D.C.Cook Nuclear Plant.
Attachment 5 to AEF:NRC:0775C Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Reliance Pump a~fotor Qualif'ication An engineering review has been conducted to ascertain the environmental qualification for the Reliance Electric containment spray pump motor, in order to determine if this motor is qualified to perform its safety function in the radiation environment outside containment (following a LOCA inside containment).
Although the engineering review indicates that the pump motor will perform satisfactorily, the motor manufacturer has offered to perform a radiation test on a motorette built in the same fashion and with the same materials as those of the installed D.C.Cook Plant motor.The test is not yet complete.Reliance Electric has, however, informed us that test results will be available prior to Augus" 31, 1983.As such, a request for schedular extension is not being requested at this time.
Attachment 6 to AEP:NRC:0775C Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Hethods Used To Identify 10 CFR 50.49(b)E uio, ent As required by 10 CFR 50.49(g), Attachment 1 to this letter contains a list of those equipment items presently known to be within the scope of 10 CFR 50.49(b)(1) through (b)(3).The identified equipment items are relied upon to remain functional during and following a design basis accident.The actions taken to develop this list consisted of those initial actions performed for our AEP;NRC:0578B submittal (as described in Attachment 6 to that submittal), review of NUREG-0737 requirements regarding environmental qualif'cation, and reconfirmation of postulated environments by review of the appropriate FSAR sections.For each device identified as being relied upon to remain functional (i.e., pump and fan motors, solenoids, hydrogen recombiners, valve motor operators, etc.), the corresponding electrical installation which would have to w'thstand the harsh environment (i.e., cables, cable terminations, limit switches, etc.)was identified.
These electrical installations have been incorporated into the equipment list in Attachment 1 to this letter.,To date, our review of-elqctrical installations serving.safety or non-safety related actuating or monitoring devices has been limited to those devices which have been identified as falling within the scope of IE Bulletin No.79-01B or 10 CFR 50.49(b)(l) through (b)(3).