ML17345A998
From kanterella
Revision as of 10:15, 11 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17345A998 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 01/21/1983 |
From: | EARLES J W, FEENEY M W, FOSTER R G ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
To: | |
Shared Package | |
ML17345A993 | List: |
References | |
16081-ICE-3111, 16081-ICE-3111-R, 16081-ICE-3111-R00, GL-82-28, NUDOCS 8303160313 | |
Download: ML17345A998 (150) | |
Similar Documents at Turkey Point | |
---|---|
Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML17354B1891998-11-0909 November 1998
[Table view]Simulatory Certification Update 2. ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML20137M2121996-12-17017 December 1996 Monthly Indicator Rept, Nov 1996 ML20137M9261996-10-31031 October 1996 Monthly Indicator Rept ML20137N1941996-10-17017 October 1996 Monthly Indicator Rept, Sept 1996 ML20137N2051996-06-14014 June 1996 Monthly Indicator Rept, May 1996 ML20137N2111996-05-14014 May 1996 Monthly Indicator Rept, Apr 1996 ML20137N2201996-04-17017 April 1996 Monthly Indicator Rept, Mar 1996 ML17354A2841996-04-0707 April 1996 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 941114-960407. ML17353A6341996-03-31031 March 1996 Rev 0 to JPN-PTN-SEFJ-96-015, Control Rod Operability Evaluation as Result of Incomplete Rod Insertion at Other Westinghouse Plants. ML20137N2381996-03-19019 March 1996 Monthly Indicator Rept, Feb 1996 ML20137N3661995-12-18018 December 1995 Monthly Performance Monitoring Mgt Info Rept, Nov 1995 ML20137N4311995-10-18018 October 1995 Monthly Perfromance Monitoring Mgt Info Rept, Sept 1995 ML20137M7111995-07-25025 July 1995 Quality Assurance Audit Rept QAS-ENV-95-1, Radiological Environ Monitoring Program & Site Nonradiological Environ Protection Plans Functional Area Audit, 950525-0714 ML17353A2561995-07-14014 July 1995 Service Water Operational Performance Insp,Self Assessment, Final Rept, for Turkey Point Nuclear Plant ML17353A2641995-06-27027 June 1995 Pyrolysis Gas Chromatography Analysis of 7 Thermo-Lag Fire Barrier Samples. ML17352B0441995-02-20020 February 1995 Engineering Evaluation of Turkey Point Units 3 & 4 Containment Structures. ML17352A8841994-10-28028 October 1994 Plant,Simulator Certification Update 1. ML17352A8691993-05-31031 May 1993 Technical Rept, Assessment of Aging Degradation of Civil/ Structural Features at Selected Operating Nuclear Power Plants. ML17353A9201993-04-30030 April 1993 Plant Specific Seismic Adequacy Evaluation of Turkey Point, Units 3 & 4 to Resolve USI A-46 & GL 87-02. W/O App a ML17349A7961993-04-12012 April 1993 Nonproprietary Addendum 1 to Thimble Reduction Study for Turkey Point Units 3 & 4. ML17349A7951993-04-12012 April 1993 Nonproprietary Thimble Reduction Study for Turkey Point Units 3 & 4. ML17349A4721992-11-0505 November 1992 Fifteenth Year Tendon Surveillance Supplemental Rept. ML17349A4061992-09-23023 September 1992 Rev 0 to JPN-PTN-SEMJ-92-034, Safety Evaluation for Interim Fire Protection Sys Configuration to Support Unit 4 Startup. ML17349A3501992-08-17017 August 1992 Engineering Evaluation for Verification of PSB-1 Computer Model for Setting of Undervoltage Relays. ML17348A8011991-01-0202 January 1991 Simulator Initial Certification, Vol 1 ML17348A8021991-01-0202 January 1991 Simulator Initial Certification, Vol II ML17348B0071990-12-31031 December 1990 Probabilistic Seismic Hazard Evaluation & Uniform Hazard Spectra for St Lucie & Turkey Point Nuclear Power Plant Sites ML17348A2811990-05-31031 May 1990 Suppl 0,Rev 1 to Emergency Power Sys Enhancement Project Design Rept. ML17348A2821990-05-31031 May 1990 Suppl 2,Rev 1 to Emergency Power Sys Enhancement Rept, Safety Analysis. ML17348A2831990-05-31031 May 1990 Rev 1 to Emergency Power Sys Enhancement Project Response to NRC Request for Addl Info. ML17347B4621989-12-31031 December 1989 App a to USI A-46 & Generic Ltr 87-02. ML18008A0311989-07-31031 July 1989 NTH-TR-01 Decrease in Heat Removal by Secondary Sys. ML17347B0861989-03-31031 March 1989 Rev 0 to Turkey Point Units 3 & 4 Emergency Power Sys Enhancement Rept,Suppl 1-Testing. ML17345A6631989-03-21021 March 1989 Final Rept of Inservice Insp NDE of Unisolable Piping Sys & Components for Potential Thermal Stress Effects Ref NRC Bulletin 88-008. ML17345A4201988-08-31031 August 1988 Reactor Vessel Heatup & Cooldown Limit Curves for Normal Operation, Ltr Rept ML17345A3151988-08-15015 August 1988 Independent Mgt Appraisal Re Corrective Action Programs & Investment in Supporting Resources,Recommending Extension of Effective Performance to Include Corporate Level & Site Level Measures ML17347A7851988-06-30030 June 1988 Emergency Power Sys Enhancement Rept. ML17347A7971988-06-16016 June 1988 Seismic Hazard Data Prepared for Resolution of USI A-46. ML17347A7981988-06-16016 June 1988 Radiological Data Prepared for Resolution of USI A-46. ML17342B2901988-04-18018 April 1988 Independent Mgt Appraisal. ML17347A6531987-12-11011 December 1987 Outside Containment Limitorque Wire Rept. ML17347A4521987-04-27027 April 1987 Rept on Instrumentation Port Column Assembly Leakage,Turkey Point Unit 4. ML20213H1731986-08-31031 August 1986 Economic Benefits of Nuclear Phase Out ML20155A1831986-02-28028 February 1986 Human Factors Engineering Guidance Manual,Turkey Point Nuclear Power Plant Units 3 & 4 ML17346B0151985-04-30030 April 1985 Rev 1 to Turkey Point Plant Unit 3 Engineering Evaluation of Instrumentation Sys for Reg Guide 1.97,Rev 3. ML17346B0161985-04-30030 April 1985 Rev 1 to Turkey Point Plant Unit 4 Engineering Evaluation of Instrumentation Sys for Reg Guide 1.97,Rev 3. ML20111B1751984-11-30030 November 1984 Technical Rept on Evaluation of Use of Arching Theory in Analysis of Masonry Walls Under Differential Pressure - Turkey Point Plant Units 3 & 4 ML20090H4561984-07-23023 July 1984 Rev 1 to Spent Fuel Storage Facility Mod Sar ML17346A4041984-05-31031 May 1984 Rev 0 to Auxiliary Power Upgrade Summary & Design Evaluation. W/10 Oversize Figures.Aperture Cards Available in PDR 1998-06-29 Category:TEXT-SAFETY REPORT MONTHYEARML20217L9371999-10-20020 October 1999
[Table view]Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML17345A998&oldid=1027392"