Category:CORRESPONDENCE-LETTERS
MONTHYEARDD-99-12, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 9910281999-10-28028 October 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review DD-99-12 Has Expired.With Certificate of Svc.Served on 991028 ML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217G9491999-10-14014 October 1999 Forwards Exemption from Requirements of 1-CFR50,App E, Section IV.F.2.c,re Conduct of full-participation Exercise in Sept 1999,at Plant,Units 1,2 & 3 ML20217D9671999-10-12012 October 1999 Forwards Copy of Transcript of Public Meeting Held by NRC Staff & NNECO on 990825 at Waterford,Connecticut on Decommissioning Program for Millstone,Unit 1.Without Encl ML20217D3011999-10-0707 October 1999 Forwards Request for Addl Info Re Util 990118 Request for Amend to License NPF-49 to Allow full-core Offloads to Spent Fuel Pool During Core Offloads to Spent Fuel Pool During Core Offload Events ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC ML20217B4711999-10-0404 October 1999 Informs That Staff Did Not Identify Any Safety Concerns Re Licensee Proposals to Modify Commitments Made for Action Items 4.2.1,4.2.2,4.5.1 & 4.5.2 of GL 83-28 by Providing Addl Justifications or Safety Bases for Changes ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212J3051999-10-0101 October 1999 Discusses GL 97-06 Re Degradation of SG Internals,Dtd 971230.GL Requested Each PWR Licensee to Submit Info That Will Enable NRC Staff to Verify Whether PWR SG Internals Comply & Conform to Current Licensing Basis for Facilities ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J2451999-10-0101 October 1999 Informs That Util 980807 & 990629 Responses to GL 98-01, Y2K Readiness of Computer Sys at NPPs Acceptable.Nrc Considers Subj GL to Be Closed for Units 2 &3 ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20217A9271999-09-30030 September 1999 Discusses Investigation Conducted at Millstone Nuclear Power Station by NRC OI Region I on 980319 to Determine If Contract Training Instructor Was Terminated for Raising Concerns About Quality of Training Matls ML20217B3221999-09-30030 September 1999 Refers to Investigation Rept 1-1997-035 Conducted at Millstone Nuclear Power Station by NRC Ofc of Investigation Field Ofc,Region I on 970915 to Determine Whether Former Health Physics Technician Discriminated Against ML20212J6621999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Units 2 & 3 on 990916.Identified Several Recent Instances in Which Condition Repts Were Not Initiated,Resulting in Untimely or Inadequate C/As.Historical Listing of Plant Issues Encl B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer ML20216J1341999-09-28028 September 1999 Ltr Contract:Task Order 49, Millstone Units 2 & 3 Employee Concerns Program Insp, Under Contract NRC-03-98-021 B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 ML20212F4961999-09-20020 September 1999 Forwards Insp Repts 50-245/99-08,50-336/99-08 & 50-423/99-08 on 990615-0809.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 ML20212A9011999-09-10010 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re Application for Exemption,Dtd 990803.Proposed Exemption Would Provide Relief from Requirement of 10CFR50 ML20212A3171999-09-10010 September 1999 Discusses Investigation Rept 1-1998-045 Conducted on 981112 to Determine If Former Senior Health Physics Technician Being Denied Employment at Millstone in Retaliation for Having Raised Safety Concerns in Past.Synopsis Encl B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20212A7501999-09-10010 September 1999 Forwards Staff Requirements Memo Response,Dtd 990525,which Provides Actions NRC Plans for Continued Oversight of safety-conscious Work Environ & Employee Concerns Program ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests ML20211K5171999-09-0202 September 1999 Expresses Appreciation for Support Provided for NRC Public Meeting on 990825 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures ML20211H0741999-08-30030 August 1999 Discusses GL 92-01,Rev 1, Rv Structural Integrity, Issued by NRC on 950519 & NNECO Responses for Millstone Unit 2 & 980715.Informs That Staff Revised Info in Rvid & Released Info as Rvid Version 2 Based on Response Review 1999-09-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217N8261999-10-25025 October 1999 Discusses Errata Re 991021 Filing of Northeast Nuclear Energy Co Answer to Request for Hearing & Petition to Intervene B17886, Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 21999-10-18018 October 1999 Requests Permission to Utilize Code Case N-623, Deferral of Insps of Shell-to-Flange & Head-to-Flange of Reactor Vessel,Section Xi,Div 1, for Millstone Unit 2 B17901, Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6)1999-10-18018 October 1999 Submits Statement of Personal Qualification (NRC Form 398) Along with Supporting Certification of Medical Exam by Facility Licensee (NRC from 396) in Support of License Renewal for PM Miner.Encls Withheld,Per 10CFR2.790(a)(6) 05000336/LER-1999-012, Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-012-00,re Unrecoverable CEA Misalignment Entry Into TS 3.0.3 on 990917.Commitments Made by Util Are Encl B17900, Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 11999-10-14014 October 1999 Forwards Revised Assumptions Used in Fuel Handling Accident Analysis & Summary of Results.List of Regulatory Commitments Are Listed in Attachment 1 ML20217P1201999-10-0606 October 1999 Informs NRC of Proposed Acquisition of Parent Holding Company of Central Maine & Requests NRC Concurrence,Based on Threshold Review,That Proposed Acquisition Does Not,In Fact, Constitute Transfer Subject to 10CFR50.80 ML20217F0031999-10-0606 October 1999 Forwards Original Petition to Intervene Being Filed on Behalf of Clients,Connecticut Coalition Against Millstone & Long Island Coalition Against Millstone,Iaw Provisions of 10CFR2.714 B17892, Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC1999-10-0505 October 1999 Requests Withdrawal of License Amend Application Re 24-month SG Tube Insp Surveillance Extensions,Submitted in Util 950726 & s to NRC B17887, Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer1999-09-28028 September 1999 Requests Exemption from Requirements of 10CFR140.11(a)(4) Which Requires Licensees to Maintain Secondary Financial Protection Beyond Primary Layer B17883, Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-62301999-09-27027 September 1999 Forwards Mnps Unit 3 ISI Summary Rept,Cycle 6, IAW ASME Section XI,IWA-6230 B17890, Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-09-27027 September 1999 Provides Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal B17884, Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-031999-09-24024 September 1999 Forwards NRC Form 536, Operator Licensing Exam Data, for Mnps,Units 2 & 3,per Administrative Ltr 99-03 B17888, Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 9909151999-09-24024 September 1999 Informs That There No Longer Exists Need to Maintain Millstone Unit 2 SRO License for CA Hines,License SOP-10741-01,effective 990915 05000336/LER-1999-001, Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl1999-09-20020 September 1999 Forwards LER 99-001-00 Re Thermal Reactor Power Limit That Was Exceeded.Commitments Made by Util Encl B17867, Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports1999-09-17017 September 1999 Requests Relief from Requirements of 10CFR50.55a(g),IAW ASME Section XI for Millstone,Unit 3.Util Requests Relief from Performing Visual Exam of Reactor Pressure Supports to Extent Required by Code for Class 1 Supports B17876, Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant1999-09-16016 September 1999 Informs That Util Will Adopt Last Approved Northeast Util QA Program (Nuqap) Tr,Rev 21,dtd 990630,as Unit 1 Nuqap,Per Decision to Permanently Cease Operations at Subject Plant B17865, Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal1999-09-16016 September 1999 Provides NRC Staff with Updated Proposed Rev of FSAR Section 14.6.3, Radiological Consequences of SG Tube Failure. Updated Proposed Rev Will Replace Info Provided in Attachment 3 of Initial Submittal B17881, Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Le Olsen,License SOP-10398-2.Encl Withheld Per 10CFR2.790(a)(6) B17880, Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Form 398 & NRC Form 396 for Rf Martin,License SOP-10397-0.Encls Withheld Per 10CFR2.790(a)(6) B17859, Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 9801281999-09-15015 September 1999 Forwards up-to-date Distribution Lists for NRC Correspondence to NNECO & NUSCO.Side-bars Indicate Changes from Previous Lists Provided to NRC on 980128 B17882, Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6)1999-09-15015 September 1999 Forwards NRC Forms 398 & 369 in Support of License Renewal for Bb Parrish,License SOP-10399-2.Encl Withheld Per 10CFR2.790(a)(6) B17872, Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 11999-09-14014 September 1999 Informs of Election to Consolidate Previous Commitments Re Work Observation Program with Two New Programmatic Commitments Listed in Attachment 1 B17838, Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls1999-09-10010 September 1999 Forwards Revs 34 & 35 to Physical Security Plan.Explanation of Changes Provided as Attachment 1.Without Encls ML20211J9291999-09-0303 September 1999 Forwards mark-ups & Retypes of Proposed Conforming License Changes Required in Connection with Transfers Being Sought in 990615 Application of Montaup Electric Co & New England Power Co for Transfer of Licenses & Ownership Interests 05000336/LER-1999-010, Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 11999-09-0202 September 1999 Forwards LER 99-010-00,documenting 990804 Event of Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve Following Maint Activities.List of Util Commitments Contained in Attachment 1 ML20216H0591999-09-0202 September 1999 Responds to Re Issues Submitted by Cullen on Behalf of Several Petitioners Concerning Offsite Emergency Prepardeness for Millstone Nuclear Power Station ML20211N9241999-09-0101 September 1999 Forwards Document Classification Form for Insertion Into Emergency Planning Services Department Procedures B17851, Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d)1999-08-27027 August 1999 Forwards Semiannual fitness-for-duty Program Performance Data for 990101-990630 for Millstone Nuclear Power Station, Units 1,2 & 3,IAW 10CFR26.71(d) B17855, Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.7901999-08-17017 August 1999 Forwards NRC Forms 398 & 396 in Support of License Renewal for SRO TE Grilley,SOP-4053-04.Encl Withheld,Per 10CFR2.790 B17849, Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr1999-08-16016 August 1999 Forwards Second Quarter Backlog Performance Rept for 1999, Which Represents Fourth Rept on Mnps Performance Since Restart of Unit 3 & First Status Update for Unit 2.No Regulatory Commitments Are Contained in Ltr B17854, Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings1999-08-14014 August 1999 Forwards Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2,per TS 6.9.1.7.Revised Repts for May & June Also Encl Which Reflect Correct Faulty Printometer Readings B17850, Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept1999-08-11011 August 1999 Forwards First Lhc Quarterly Assessment Rept for Assessment Performed 990621 to 990701.NNECO Taking Appropriate Actions to Address Observations in Rept B17837, Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl1999-08-0707 August 1999 Forwards COLR for Cycle 7, for Millstone Unit 3,IAW TS 6.9.1.6.Explanation of Changes to COLR Also Encl B17657, Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 19991999-08-0303 August 1999 Requests Schedular Exemption from Emergency Plan Exercise Requirements of 10CFR50,App E,Part Iv,Section F,Paragraph 2.c.Requests That Nrc/Fema Evaluated Exercise Be Conducted in Mar 2000 Rather than Sept 1999 B17845, Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered1999-08-0202 August 1999 Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered B17831, Informs NRC Staff That Change 3 to Rev 25 of Mnps Emergency Plan Was Implemented on 990715.Change Removes Facility Organizational Charts from Emergency Plan & Identifies Relocation to Nuqap1999-07-26026 July 1999 Informs NRC Staff That Change 3 to Rev 25 of Mnps Emergency Plan Was Implemented on 990715.Change Removes Facility Organizational Charts from Emergency Plan & Identifies Relocation to Nuqap B17834, Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld1999-07-20020 July 1999 Forwards Proprietary Revised NRC Form 398,which Certifies That SL Doboe Has Completed Eligibility Requirements for Sro,Per 10CFR55.31.Proprietary Info Withheld B17836, Forwards Revised NRC Form 396 & Supporting Physician Rept for Licensed Operator Restricted from Licensed Duties, Effective 990628,due to Medical Condition.Without Encl1999-07-20020 July 1999 Forwards Revised NRC Form 396 & Supporting Physician Rept for Licensed Operator Restricted from Licensed Duties, Effective 990628,due to Medical Condition.Without Encl B17811, Submits Response to NRC AL 99-02,requesting That Licensees Provide Numerical Estimates of Licensing Actions to Be Expected to Be Submitted in Fy 2000 & 20011999-07-20020 July 1999 Submits Response to NRC AL 99-02,requesting That Licensees Provide Numerical Estimates of Licensing Actions to Be Expected to Be Submitted in Fy 2000 & 2001 ML20210S9911999-07-18018 July 1999 Requests NRC Intervene for All Shareholders of New England Electric System & to Help with Merger with National Grid Group & That NRC Petition Security & Exchange Commission to Investigate Matter Relative to No Shareholder Options B17835, Forwards Rev 33 to Millstone Station Physical Security Plan, Per 10CFR50.54(p)(2).Licensee Determined That Changes Do Not Decrease Effectiveness of Plan.Rev Withheld from Public Disclosure,Per 10CFR2.790(d)(1)1999-07-16016 July 1999 Forwards Rev 33 to Millstone Station Physical Security Plan, Per 10CFR50.54(p)(2).Licensee Determined That Changes Do Not Decrease Effectiveness of Plan.Rev Withheld from Public Disclosure,Per 10CFR2.790(d)(1) B17818, Provides NRC Staff with Change to TS Bases Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only.Change Was Reviewed & Approved by Unit 3 Plant Operations Review Committee IAW Provisions of 10CFR50.591999-07-16016 July 1999 Provides NRC Staff with Change to TS Bases Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only.Change Was Reviewed & Approved by Unit 3 Plant Operations Review Committee IAW Provisions of 10CFR50.59 B17824, Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 21999-07-13013 July 1999 Forwards Monthly Oeprating Rept for June 1999 & Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident B17816, Provides Certification That M Lettrich,Has Completed Eligibility Requirements,Per 10CFR55.31 for Operator License.Util Requests That Licensing Action Be Taken for Named Individual1999-07-0101 July 1999 Provides Certification That M Lettrich,Has Completed Eligibility Requirements,Per 10CFR55.31 for Operator License.Util Requests That Licensing Action Be Taken for Named Individual B17801, Forwards 10CFR50.59 Annual Rept for Period Jan-Dec 1998. Various Changes That Were Initiated in Previous Yrs & Completed in 1998,also Incorporated Into Annual Rept1999-06-30030 June 1999 Forwards 10CFR50.59 Annual Rept for Period Jan-Dec 1998. Various Changes That Were Initiated in Previous Yrs & Completed in 1998,also Incorporated Into Annual Rept B17819, Forwards Rev 17 to FSAR & Addendum 6 to Annual Rept.Nneco Recently Completed Review of Unit 2 Design & Licensing Bases Which Resulted in Changes to FSAR Provided in Encl 1.Encl 2 Includes Info Covering Changes Not Included in1999-06-30030 June 1999 Forwards Rev 17 to FSAR & Addendum 6 to Annual Rept.Nneco Recently Completed Review of Unit 2 Design & Licensing Bases Which Resulted in Changes to FSAR Provided in Encl 1.Encl 2 Includes Info Covering Changes Not Included in B17780, Forwards Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) TR, IAW 10CFR50.54(a)(3).Changes to TR Are Shown as Text in Bold Italics1999-06-30030 June 1999 Forwards Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) TR, IAW 10CFR50.54(a)(3).Changes to TR Are Shown as Text in Bold Italics B17723, Responds to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for Units 2 & 3 Encl.Without Encl1999-06-29029 June 1999 Responds to NRC Request for Info Re GL 98-01, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for Units 2 & 3 Encl.Without Encl B17767, Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr1999-06-29029 June 1999 Forwards Rev 12 to FSAR & Addendum 3 to Annual Rept, for Millstone Unit 3,per 10CFR50.71(e) & 10CFR50.4(b)(6). No New Regulatory Commitments Contained in Ltr 1999-09-03
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A8071990-09-11011 September 1990 Forwards Core Operating Limits Rept for Four & Three Loop Operation,Per Tech Spec 6.9.1.6.d A08900, Responds to Expressing NRC Views on Access to Util Internal or third-party Assessment Repts.Believes Internal Analysis to Support Amend of One of Util NRC OLs to Authorize Higher Power Level Is within NRC Purview & Access1990-09-11011 September 1990 Responds to Expressing NRC Views on Access to Util Internal or third-party Assessment Repts.Believes Internal Analysis to Support Amend of One of Util NRC OLs to Authorize Higher Power Level Is within NRC Purview & Access B13628, Forwards Correction to Error Discovered in Util 900727 Response to Notice of Violation from Insp Rept 50-336/90-09. Statement Corrected to Read That Contract Personnel That Have long-term Assignments,Certified as Testing Personnel1990-09-0707 September 1990 Forwards Correction to Error Discovered in Util 900727 Response to Notice of Violation from Insp Rept 50-336/90-09. Statement Corrected to Read That Contract Personnel That Have long-term Assignments,Certified as Testing Personnel B13624, Forwards Addl Info Re Relief Request from ASME Code Section XI Requirements for Temporary Repair to Piping Adjacent to Valve 2-SW-97A,per 900817 Telcon1990-09-0505 September 1990 Forwards Addl Info Re Relief Request from ASME Code Section XI Requirements for Temporary Repair to Piping Adjacent to Valve 2-SW-97A,per 900817 Telcon A08977, Advises of Commitment to Install Hardened Wetwell Vent at Facility,In Response to NRC .Util Will Be Proceeding W/Initial Design & Engineering of Hardened Vent, to Support Installation During 1993 Refueling Outage1990-09-0404 September 1990 Advises of Commitment to Install Hardened Wetwell Vent at Facility,In Response to NRC .Util Will Be Proceeding W/Initial Design & Engineering of Hardened Vent, to Support Installation During 1993 Refueling Outage B13596, Forwards Millstone Unit 3 Individual Plant Exam for Severe Accident Vulnerabilities, Per Generic Ltr 88-20.Rept Identified That No Major Severe Accident Vulnerabilities Requiring Corrective Action Needed1990-08-31031 August 1990 Forwards Millstone Unit 3 Individual Plant Exam for Severe Accident Vulnerabilities, Per Generic Ltr 88-20.Rept Identified That No Major Severe Accident Vulnerabilities Requiring Corrective Action Needed B13626, Informs That Info Provided in Re safety-related Equipment Classification Programs Also Applicable for Unit 3 of Facility1990-08-31031 August 1990 Informs That Info Provided in Re safety-related Equipment Classification Programs Also Applicable for Unit 3 of Facility B13618, Forwards Addl Info on Util 900815 Relief Request from ASME Code Section XI Requirements,Per 10CFR50.55a(g)(6)(i),for Repairs to Pipe 3SWP-006-050-031990-08-24024 August 1990 Forwards Addl Info on Util 900815 Relief Request from ASME Code Section XI Requirements,Per 10CFR50.55a(g)(6)(i),for Repairs to Pipe 3SWP-006-050-03 ML20059C2061990-08-23023 August 1990 Forwards Vols 1 & 2 to Semiannual Radioactive Effluents Release Rept Jan-June 1990, Per 10CFR50.36a.Rept Includes Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents A08918, Responds to Notice of Violation & Proposed Imposition of Civil Penalty Re Insp Rept 50-245/90-08.Mitigation of Civil Penalty Requested.Corrective Action:List of Procedural Changes Provided1990-08-22022 August 1990 Responds to Notice of Violation & Proposed Imposition of Civil Penalty Re Insp Rept 50-245/90-08.Mitigation of Civil Penalty Requested.Corrective Action:List of Procedural Changes Provided B13610, Requests Relief from ASME Boiler & Pressure Vessel Code Section XI Requirements Re Mods to Pipe 3SWP-006-050-03. Results of Insps & Required Repairs Will Determine Schedule for Future Insps1990-08-15015 August 1990 Requests Relief from ASME Boiler & Pressure Vessel Code Section XI Requirements Re Mods to Pipe 3SWP-006-050-03. Results of Insps & Required Repairs Will Determine Schedule for Future Insps B13595, Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-13941990-08-14014 August 1990 Notifies NRC That Utils Volunteer to Participate in Emergency Response Data Sys Project for All Four Nuclear Units,Per Generic Ltr 89-15 & NUREG-1394 B13607, Requests Relief from ASME Code Section XI to Reflect Mod to Piping Adjacent to Valve 2-SW-97A,in Response to Generic Ltr 90-051990-08-10010 August 1990 Requests Relief from ASME Code Section XI to Reflect Mod to Piping Adjacent to Valve 2-SW-97A,in Response to Generic Ltr 90-05 A08845, Responds to NRC Backfit Analyses of Hardened Wetwell Vent, Contained in .Benefit of Installing Hardened Wetwell Vent to Satisfy Basic Design Objective of Preventing core-melt Event Not Sufficient for Immediate Decision1990-08-0808 August 1990 Responds to NRC Backfit Analyses of Hardened Wetwell Vent, Contained in .Benefit of Installing Hardened Wetwell Vent to Satisfy Basic Design Objective of Preventing core-melt Event Not Sufficient for Immediate Decision ML20058N2181990-08-0707 August 1990 Notification of Change in Senior Operator Status.Util Determined That Need to Maintain Senior OL of LS Allen No Longer Exists.Determination Effective 900719 ML20058M8321990-08-0707 August 1990 Discusses Spent Fuel Racks Poison Surveillance Coupon Boraflex Degradation.Visual Exam of Remaining Surveillance Coupons Revealed Similar Situation Existed in All Coupon Samples B13590, Responds to NRC 900718 Request for Addl Info Re Util 900418 Request for Schedular Exemption from 10CFR50,App E,Section IV.F.3 to Allow Dec 1990 Full Participation Exercise to Be Exchanged W/Oct 1991 Partial Participation Exercise1990-08-0101 August 1990 Responds to NRC 900718 Request for Addl Info Re Util 900418 Request for Schedular Exemption from 10CFR50,App E,Section IV.F.3 to Allow Dec 1990 Full Participation Exercise to Be Exchanged W/Oct 1991 Partial Participation Exercise A08881, Responds to NRC Re Violations Noted in Insp Rept 50-423/90-08.Corrective Action:Operators Directly Involved W/Event Removed from Licensed Duties & Counseled by Operations Manager on Causes of Event1990-07-31031 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-423/90-08.Corrective Action:Operators Directly Involved W/Event Removed from Licensed Duties & Counseled by Operations Manager on Causes of Event B13594, Forwards Rev 13 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21(b) & 2.790(a))1990-07-30030 July 1990 Forwards Rev 13 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21(b) & 2.790(a)) ML20055J4621990-07-27027 July 1990 Advises That Need to Maintain OL or Senior OL for Listed Individuals No Longer Exists,Effective 900701 B13585, Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys1990-07-26026 July 1990 Provides Supplemental Response to Generic Ltr 89-19 Re Request for Action Concerning Resolution of Unresolved Safety Issue A-47.Plant Procedures Modified to Provide Operability Verification of Steam Generator Protection Sys A08565, Responds to NRC 900302 Request for Addl Info Re LPCI Swing Bus Transfer Design & Single Failure Vulnerabilities1990-07-26026 July 1990 Responds to NRC 900302 Request for Addl Info Re LPCI Swing Bus Transfer Design & Single Failure Vulnerabilities B13592, Requests Extension to Respond to NRC Backfit Analyses of Hardened Wetwell Vent1990-07-24024 July 1990 Requests Extension to Respond to NRC Backfit Analyses of Hardened Wetwell Vent ML20063P9791990-07-23023 July 1990 Notification of Change in SL Jackson Status Effective 900701,due to Permanent Reassignment within Util B13563, Discusses Util Comprehensive Review of Options Re Degraded Grid Undervoltage Protection.Confirms Previous Conclusion That Splitting Loss of Normal Power Logic Would Have Overall Adverse Impact on Plant Safety1990-07-20020 July 1990 Discusses Util Comprehensive Review of Options Re Degraded Grid Undervoltage Protection.Confirms Previous Conclusion That Splitting Loss of Normal Power Logic Would Have Overall Adverse Impact on Plant Safety B13566, Advises That Util Has Reasonable Assurance That Safety Relief Valves Operable & Will Perform as Expected Until Next Outage1990-07-20020 July 1990 Advises That Util Has Reasonable Assurance That Safety Relief Valves Operable & Will Perform as Expected Until Next Outage B13588, Corrects 900703 Submittal of Results of Second in-cycle Insp of Steam Generators.All Tubes W/Cracks Stacked & Plugged1990-07-18018 July 1990 Corrects 900703 Submittal of Results of Second in-cycle Insp of Steam Generators.All Tubes W/Cracks Stacked & Plugged A08822, Submits Addl Info Requested Re Util Response to Generic Ltr 88-11, Radiation Embrittlement of Reactor Vessel Matls. Charpy Impact Use Values for Welds Provided in Evaluation of Irradiated Capsule W-971990-07-18018 July 1990 Submits Addl Info Requested Re Util Response to Generic Ltr 88-11, Radiation Embrittlement of Reactor Vessel Matls. Charpy Impact Use Values for Welds Provided in Evaluation of Irradiated Capsule W-97 ML20055G5331990-07-18018 July 1990 Forwards Decommissioning Financial Assurance Certification Rept B13587, Requests Temporary Waiver of Compliance from Tech Spec 3.5.F.2 Re Emergency Diesel Generator (EDG) Limiting Condition for Operation.Waiver Would Extend Available Time to Repair Damaged Electrical Components1990-07-16016 July 1990 Requests Temporary Waiver of Compliance from Tech Spec 3.5.F.2 Re Emergency Diesel Generator (EDG) Limiting Condition for Operation.Waiver Would Extend Available Time to Repair Damaged Electrical Components ML20055D3461990-07-0303 July 1990 Responds to NRC Bulletin 90-001 Re Loss of Fill Oil Transmitters Mfg by Rosemount.Operability Determinations Performed & Documented for All Rosemount 1153 & 1154 Transmitters at Facility B13545, Forwards Rev 3 to Updated FSAR for Millstone Unit 31990-06-29029 June 1990 Forwards Rev 3 to Updated FSAR for Millstone Unit 3 ML20055D7191990-06-29029 June 1990 Amends 900604 Rev 13 to QA Program ML20055D3481990-06-29029 June 1990 Forwards Addl Info Re Facility Crdr & Isap,Including Justification for Human Engineering Discrepancies Dispositioned for No Corrective Action B13531, Forwards Rev 8 to Updated FSAR for Millstone Unit 21990-06-29029 June 1990 Forwards Rev 8 to Updated FSAR for Millstone Unit 2 B13550, Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl1990-06-27027 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Implementation & Completion Tables for staff-imposed Requirements Encl B13499, Forwards Corrected Tech Specs Page 3/4 9-1 for Incorporation Into Proposed Amend 36 to License DPR-21 Re Auxiliary Electrical Sys1990-06-26026 June 1990 Forwards Corrected Tech Specs Page 3/4 9-1 for Incorporation Into Proposed Amend 36 to License DPR-21 Re Auxiliary Electrical Sys ML20043F8721990-06-11011 June 1990 Corrects Name of Vendor Supplying Replacement Plug Valves, Per Util 900511 Ltr.Replacement Bolts,Not Valves,Purchased from Cardinal Industrial Products Corp ML20043H0161990-06-0808 June 1990 Requests Exemption from App J to 10CFR50 for 12 Valves in Reactor Bldg Closed Cooling Water Sys.Valves Not within Definition of Containment Isolation Valves in App J & Not Required to Be Tested ML20043E8831990-06-0505 June 1990 Requests NRC Authorization to Use Plugs Fabricated of nickel-chromium-iron Uns N-06690 Matl Alloy 690 to Plug Tubes in Steam Generators of Plant ML20043D0451990-05-30030 May 1990 Discusses Proposed Rev to Tech Specs Re Facility ESF Actuation Sys Instrumentation Trip Setpoint,Per 900330 Ltr ML20042H0311990-05-0909 May 1990 Discusses Steam Generator Safety Assessment.Concludes That Continued Operation Through Remainder of Current Cycle 10 Fully Justified ML20042F0941990-04-30030 April 1990 Provides Addl Info Re Environ Impact of 900226 Application for Amend to License NPF-49,revising Tech Specs to Allow Containment Pressure to Increase to 14 Psia During Modes 1-4,per NRC Request ML20042F0661990-04-30030 April 1990 Responds to NRC 900404 Ltr Re Violations Noted in Safety Insp Rept 50-336/90-01 on 900120-0305.Corrective Action:Ler 90-004 Submitted on 900430 to Document Condition Prohibited by Plant Tech Specs ML20042E8331990-04-27027 April 1990 Forwards Annual Environ Protection Plan Operating Rept for 1989, & Monitoring Marine Environ of Long Island Sound at Millstone Nuclear Power Station Annual Rept 1989. ML20012E2681990-03-23023 March 1990 Responds to NRC 900226 Ltr Re Violations Noted in Insp Rept 50-423/89-23.Corrective Actions:Requirement to Review All Changes on Safety Sys for Potential Operating Procedure Changes Stressed to Operations & Engineering Personnel ML20012C3141990-03-13013 March 1990 Forwards Info Re Insp of Facility Emergency Operating Procedures,Per 900119 Ltr ML20012B4111990-03-0202 March 1990 Provides Addl Info Requested to Clarify Changes Proposed to Tech Spec Action Statements for Inoperable Accumulator B13453, Advises That Mods to Steam Generator Blowdown Sample Sys Completed,Per Violations Noted in Insp Rept 50-423/89-14 & Salp.Sys Will Be Evaluated for Next 2 Wks to Ensure Blowdown Radiation Monitor Operating Reliably1990-02-26026 February 1990 Advises That Mods to Steam Generator Blowdown Sample Sys Completed,Per Violations Noted in Insp Rept 50-423/89-14 & Salp.Sys Will Be Evaluated for Next 2 Wks to Ensure Blowdown Radiation Monitor Operating Reliably ML20011F7541990-02-26026 February 1990 Notifies That Jh Parillo Reassigned & No Longer in Need of License SOP-10263-2 as of 900219 1990-09-07
[Table view] |
Text
- -_ _ _ - ._.
l
., 's.
L M UTILETIES o.ner : Orvie.. . scia.n sir..t. s.riin. Conn.cticui 1 wesum ms.c m ns sac =c "" P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 i:
k k J 7, " C E E "" Z (203) 665-5000 May 17, 1989 Docket No. 50-245 B13249 Re: IGSCC ISAP Topic No. 2.114 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 .
1 Gentlemen:
Millstone Nuclear Power Station, Unit No.1 (
1989 Interaranular Stress Corrosion Crackina Plan Resulti In a letter dated October 26, 1987,(I) the NRC Staff requested that Northeast ;
Nuclear Energy ' Company (NNECO) provide plans for IGSCC piping inspections and/or modifications which will be completed during the 198f2[efueling outage
. (Reload 12) at Millstone Unit No.1. Generic Letter 88-01 requested that NNEC0 provide. plans for piping replacement, inspection, repair, and leakage 4 detection related Unit piping at Millstone to the No.mitigation
- 1. of IGSCC of austenitic sgnless NNEC0's July 27,1988 response steel to Generic Letter 88-01 provided our updated IGSCC program for Millstone Unit No. 1, which follows the guidelines of NUREG-0313, Revision 2. This submittal, in i providing answers to the five specific requests of Generic Letter 88-01, provided the majority of NNEC0's plans for IGSCC piping inspections to be conductedduringthecgent1989 on February 3, 1989, outage. A letter was submitted to the Staff which detailed our updated plan to address IGSCC j
j inspections during the 1989 refueling outage. J l
(1) M. L. Boyle letter to E. J. Mroczka, "1987 Refueling Outage IGSCC l Inspection," dated October 26, 1987. !
(2) F. J. Miraglia Jr., letter to all licensees of operating boiling water reactors (BWRs) and holders of construction permits for BWRs, "NRC Position on IGSCC in BWR Austenitic Stainless Steel Piping," dated January 25, 1989.
(3) E. J. Mroczka letter to U.S. Nuclear Regulatory Commission, " Response to Generic Letter 88-01-IGSCC in Austenitic Stainless Steel Piping," dated i July 27, 1988.
'(4) E. J. Mroczka letter to U.S. Nuclear Regulatory Commission, " Updated IGSCC Inspection Plan for the 1989 Refueling Outage," dated February 3, 1989.
8906010118 890517 /
DR ADOCK0500g5 t
U.S. Nuclear Regulatory Commission B13249/Page 2 May 17, 1989 In a letter dated May 4,1989,(5) NNEC0 provided the results of the weld examinations conducted during the ongoing refueling outage. Attachment 1 to that letter included a list of the results of the weld examinations in the inspection plan and a discussion explaining changes that were made to the plan. Since submittal of the May 4,1989 letter, further Staff questions have arisen on the IGSCC program. Attachment I to this letter provides responses to those questions.
Please contact us if you have further concerns.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY (
// 4&ct 2n_/
E. J. fro'czka //
Senior Vice President ,
cc: W. T. Russell, Region I Administrator M. L. Boyle, NRC Project Manager, Millstone Unit No. 1 W. J., Raymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 Attachment l l
l i
I I
i (5) E. J. Mroczka letter to U.S. Nuclear Regulatory Commission," 1989 Intergranular Stress Corrosion Cracking Plan Results," dated May 4,1989, i
~
1 ..
Docket No. 50-245 B13249 Millstone Nuclear Power Station, Unit No. 1 Attachment 1 Additional Information on 1989 Refueling Outage IGSCC Examinations May 1989
v , . . . ' a' Attachment B13249/Page 1 Ouestion 1:
l Describe.the weld overlay design for weld CUAJ-5.
Response 1:
The design and application of this overlay are consistent with those previous-ly employed at Millstone Unit No.1. Based on the results of a crack growth evaluation per ASME Section XI, a full structural weld overlay has been designed. The minimum design dimensions are: 0.25" thick x 1.17" half length. The actual weld overlay dimensions are: 0.35" thick x 1.5" half length. Type ER308L weld filler metal, having a. delta ferrite content of 8FN to 17FN, will be used for the overlay. Credit is only taken . for deposited weld metal having a minimum delta ferrite content of 8FN.
NUSCO calculation number 88-014-1086GP; " Weld Overlay Design for Reactor Water Clean Up Weld CUAJ-5" is provided as Attachment-2.
Question 2:
List welds inspected by category.
ResDonse 2:
Number of welds inspected by NUREG 0313, Rev. 2 Category.
Total No. No. Welds Cateaory Welds Inspected A 117 14-B 0 0-C 76 17-D 184 100 E 12 12 F 0 0 G 21 12 A summary list of the IGSCC examinations including the applicable NUkEG-0313, Rev. 2 Category is provided as Attachment 3.
Question 3:
Explain expansion sample size and composition.
Response 3:
NUREG 0313, Rev. 2 does not specify expansion requirements for Category D welds. In NNECO's July 27, 1988 response to Generic Letter 88-01, a sample
Attachment B13249/Page 2 expansion was proposed. No exception to this expansion selection was taken by the Staff, and it was used during the 1989 refuel outage.
The additional sample of welds was selected based on the welds that are determined to contain suspected cracks. The number of welds will be approxi-mately equal to and distributed by the same pipe size and system parameters that were included in the original sample, unless it could be determined that there is a technical reason to select a different distribution.
The RWCU system contains welds of Categories A, D, and G consistent with the guidelines of NUREG-0313, Rev. 2. Four (4) Category D welds were inspected for IGSCC in the RWCU supply line (including CUAJ-5). Therefore, an equal number of welds were inspected in the expansion sample. Please refer to Table 3, pages T3.8 and T3.9 of our response to Generic Letter 88-01, dated July 27, 1988.
Per NUREG-0313, Rev. 2, all Category D welds are inspected within 2 refuel cycles (50% each refuel outage per Millstone Unit No. I's IGSCC plan). All of the Category D welds were inspected during the 1987 and 1989 outages.
t
)
Docket No.50-24E B13249 Millstone Nuclear Power Station, Unit No. 1 Attachment 2 Weld Overlay Design for RWCU Weld CUAJ-5 May 1989
PACE 1., D F 3 NOR T" EAST UTILITIES SERVICE COMPANY HUCLEAR ENGINEERING AND OPERATIONS GROUP GENERATION MECHANICAL ENGINEERING i
ASME SECTION lli CLASS 2 AND 3 AND AN$l 531.1.0 PIPING ANALYSl5 PROJECT ASSIGNMENT: b8 ~ Y CALCULATION NUMBER: 88- 014 - /066 6F PLANT: Mit a sdr.r <ma No.1 TITLE: wGt e e /Ri h tww b: tuttee wMec et prop t weet sve t o euq-s QA CATEGORY m REVISION 0 PREPARED BY M
,yqh
\j ~
4jQsq DATE'
& qfEifgp V SAIL R.EVIEwf BY nw~s REVIEW METHD F. Avrnon 4WO1 ( Tdw E Power VED d/zila9 DAT REVISION 1 !
PREPARED BY DATE REVIEWED BY DATE REVIEW METHDD APPRDVED BY DATE RE1 T; ION 2 PI?EPARED BY DATE REVIEWED BY DATE REVIEW ME THDD APPRDVED BY DATE
m- , -
t, i t.* .
4 s
- .. NORTHEAST UTILITIES SERVICE COMPANY
, sous7 po .
$U BJE CT* }l161thhvi' ' U N I*I NO'b' BY piu m s.s /?(V ce .DATE 4llIlL'?9 -
'keLo e se. t' + V - O C 3 th.-1 Sof' CHKO.8YTs'410ctibATE 4l2 o YD
., t i
'[h*C'"M 'wA"Je (' ( CA : s F I6~EAS CALC.NO.N *OI4~/085'bb- R E V- 0 tVf(D f UA T* b 5HEET No. I- 'OF ' P'
' TMlf er CO'sil p ?: '
h 6c '
- l. cllCri' t t 3 f, . (ev fi v!/>" s 5
~
g p A e< Ar t t s uwa 8 5 fil6.w CC lA i'
1 1
l~
h- <
t- . - _ . _ . _ - --- . _ _ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _
i- J ? O, -l ,oc,,,
'g
, ,.o: HORTHEAST UTILITIES SERVICE COMPANY
, ' $UBJE CT'- if /t< s erg ^ d p iT' ' ~h/LI Bf Mtio*J- I7 f. M o DATE 4/?i/89 tif ( D' es u !_ Av ~ hiN1 f04 /f4Ac 7o f CHKD. BY IE4JPamue oATe q' 2 g
- h AT C fk%iJF~**fi1(51 b/tb CVA"*l C ALC. NO. 6 8- 0 /4 - fo66 V R E Y. L' SHEETNo. 3 0F Il~
I L
. c65c cin c TW o!'EcHel cF TM t m ^
- T ' 3 ') !> To cvet.A7E 7 E
(( # n DC7(CTCO All WEL D (f 74 Cs'A g *br s vt. = (t (Vf(~- C
( L FAM VP 3 7'0 7 f M . If illC [t e t') th (evr>0 'To gf EE te7Afte fM f4ML LCCIIs 4 3D, ,0 hc~L O OsN Jy n og y 712Cr > Li i C /G pi o '70 et:Toti p>( ful L t *\ C v L T utte t otv7Fc.at7y ;
iK Ffc .
1
$ 4 $ b e6
/e [/d ' kkOWIN (/4(k47#Dd NI 88. S gfl 7 [. f3 ( (p (Aj t l/ (p CSifflait". I'l lE Ey llTo tJ C. ? S l C NG C, ;' t (f G ( CD'C C C 4A T ' J C i Y MG,* ft /N *Tv fio?J Wc' 7'I/Co v a .) 7 isE j#!t'c' n s' LL t b7M -
/W t% Of l/O.Y'A i l,I C03 C?lEAY'il4 fovf.. SAIOO AN ff'C l (as s reverven noo s.uc n m. seta ocvwo mre /
- Alta 9Hvst ~75trk'ocu of G.ES ' /** O / f h^ 'fluM N'l F. t6v n gy J.17 TM C'Cro Mf1t*& O t;D .D/f!G v.S iy%.5 ACf, 0 3 'N!(rivg y j't,0 j. 5 ll0 f L i6+'G7F.
s 1
g n e. . w, NORTHEAST. UTILITIES SEPVICE COMPANY..
, . su E J L < 4
. ~M:7ppi upf __f L,_$ /
t% Bhon U ciM* C D L. 4l?tl65 . .
~ wh$ ' c1sete . QG1!.ptt Ig: Ep.e_Ise ceno.sy M b_oJ4':'e'e-J 4[Z # h tyEE9 cfLaff.f. _5d)76 i.__vyf f @ Ct/AJ,5 t t.i.t. Nc. M 6 - Ol4 - lo#_otf : ; g I 5 in 7 NQ, d 0 e ,_ j] .
j.
. .i, 1
l hfC 6+o MET R1 ko n gg.4. [
.g. .s .s
/g/, 'N obe 6 625 5.5
\ '\ f2 0 .5"
. - , s .
I R.
I fl.M Cato ME74'f (R o tA kgr. 1
(\ /
/
j j. 3 .s '
2, o. s"
, /
p .s* . , .
p \, '* . _ / ,/
-d {eitK Le At>$ (f p gg [
6 p% s 3576 hI 5, = son eri
$g, a 3702 fa f 5,g . 79 6 PM f5t S%st . 1932.
- <m.
v /6 6 76 fal i
fLM G PetuT 4 r#WA7 o rJ .
N3 km ik 2b 2
b "I'* 0 5 kod Ed.E i
i b= f b Im l
f 2 v Rt
- 7) R#f J o.855
[t l .1
- y o.15 2 41 + lb.772 f y e7 _ g4,g 44 ,y,,,e )_. !
7 T /.,
I
%* O* 5 0. b 3= y t 0.5
- 0. ,5 r-vi cooxet m . w 1
}.
o - - - __ -._-__ -__.___-_ _ _ ___
' ' r'
, 'en3.,, we NORTHEAST UTILITIES SERT /lCE COMPANY
'sO L.J E CT }hlpyr up,7 pi. L __ er.ypuou wao one- 4/tll61
__ M10 OV6"l b y hark) Q _,p perce cHeu. evicYdJ b El_ DATE.,_ 4,/24 ff9 h 4TC.2 P May.vf._ JIJI(W huO C u A T - t.__ _ cu: NC. b"'I4
- Iokb kP R [ V. D' s~et , so. 5 or Ib^
t-
. !. f_ _ 35 - 014bl '
1'
.[ ,
,1(7675)
- j. -l
.j
- i- o.ess -(
fw \.\ + 0.6 0 15 t 4 l , ( b .7 7 g _ C.6 [o .ly g l)
_ sq,g qg ,g) { ,, g q g g
- Tr \ T /J i
Q: \.\ + o4 I o .\ stas + c.]6 H - 0 AI] u \ A l'5 L .
4.s e , ,
(s \\+ v p- 0.01%7 -t S.o oS7 v8 - z.e3?? ve T v
~ l
. o.s6s
- . \ . \ =% 0L - 0 .081 L.,~} -q- 50o5'\ .A 'k(0 sM L g.63t$ C.L (o.04blh F ) 1r g (c 1. t +
- o. -. 0%7 + c . 64 2L - o.o7 l Q, \.M
- q. me us j i l Cr
k:rn s %16 7 (o 25 (I. Al3) = 4A80 Ol {I5 i
i N2b 3 (,736 [U (0 7 ) ( l M) = 8300 /3 ' /IN
}q : 4480.+ 630o : 12,75'o (si C#
l
. coun s.ao AORTHEAST UTILITIES SERVICE COMPANY
' 5V BJ E CT Mitt s7ovi uutT 4Jo.I BY hEdad J t Nfc0 DATE . 4f2fk Wfl0 ovset W r>Es lu Ge fle c Tot cHKO.eY N W Prrarr ATE o 2/f89
/
WSTM ClMsi v P sY.siff 84 fl 0 fvA7' S c ALc. no,66-0l A - h 6 G LP gg y, o _
$H E E T N O. h op_ O et TE tutLD 9t htW AL %Tf44ht i Aillt Msupto tego seNtf Sec q 6 t4ee. butt 5, T H: Gecowp M bec Ttstu emo tit t he s t.o" w eg .
Plfr 41 Bo Wan AT TtT fiPs 0, /MO - 3 o k 4 t A7 T/W /*s ec 00 6tNte 'h 4 fLevJ lt AnuMk To RE 50 % 7)tfu WALL THE
- . $N10 VAL LT# ras ra WsLL 6# $7thic f6ao og eoupts,y j ys ,
/bs vM0 E ff+eJ BM Ngy7' tWstrc7tod' f: 2 (36s.4) 14 e 17,590 Nrs
$$= C Y W*H WA dt Meee C-56S 110 ,
q- 3 07
/savMi INCtC M Civ7.t of I* *
~'
} st : 1000 (5 65 y to" {k) : 5.ss yra N
- e. ssre w(i.<is) 5 + crus 5(i.,1) X n n,su 12 e--
.'.a r o o n w o. . N2RTHEAST UTILITIES SERVICE COMPANY '
' suBJE CT kIL Ls7ey( apJtT bio . $ BY veiled A l'enior OATE_ 4 /21/8 9 I? WFLD' DVI;dit tW D EllM Q PsACTo E CHKD.8% b oWDATE 'Y, /,!83 viWGe TLLAdvP SY316M WFl o CVFT'S C ALC. NO. bh'*Ib' $$ h ? R E V. 0 SH E E T N O. 7 OF- '3 i
i r
.f AA A Nt '
/. . . o.el y o.z s,4 i s .13 To*o 0 015 p.27j g 3.gg 30** o .oG o.2ib 11 11 4ooo p.o i 6 , . 314 19.*61 scoo o .o2 o o.334 g 4. Jg 4000 c.012 c . 3% b lT.?G 7eco , , e 24 . 2si is.7 7 se.o o.ot7 o .4o & li 32 9een o .o 30 oA'67 lb il f ,
/e,..o o .on o A'l i l'l . 54 !
//, o.n o o . o '6'l o Sol j Beb60 sa "1WC h!i6vf, Tyc flew ta Cost am vhTIVEL Y ELTsMFTw To Pa o par. ATE T >eV TBC WAR of- TR Pift N7fd teensvikF TCL Y 15 prow 1Na a+ fooTomaat D PC44Tr ett i
l i
i
_ ___-________ a
4.' , coun mo . HORTHEAST UTILITIES SERVICE COMPANY SUBJE CT ///t(Vover ' vthT '0/03 BY Nf(5sA/ / ?rvFc o DATE //N7' WELD ovm Av Mit.J M /f A E70 C CHKD.Bw b > a 05t./DATE 2/!89 WFTDe ' t't eAuvf ' SYS1t& wet D - CVF"' b CALC. No. M* OIA'IO 6 f REV: 0 SHEETHo. 8 OF O
- 1) OveRtny De*64 tm pc-CRACK (C) COPYRIGHT 1984, 1987 STRUCTURAL INTEGRITY ASSOCIATES, INC.
SAN JOSE , CA ( 408 )978-8200 VERSION 1.2 STRUCTURAL REINFORCEMENT SIZING EVALUATION USING SOURCE EQUATIONS FOR CIRCUMFERENTIAL CRACK MP1 RWCU WELD CUAJ-5 OVERLAY DESIGN WALL THICKNESS = 0.5000 MEMBRANE STRESS = 3S78.OOOO SAFETY FACTOR = 3.0000
' BENDING. STRESS = 8669.0000 SAFETY FACTO ~t= 3.0000 STRESS RATIO = 2.2034 ALLOWABLE STRESS =16675.OOOO FLOW STRESS =50025.OOOO L/ CIRCUM O.00 0.20 0.20 0.30 0.40 0.50 FINAL A/T 1.0000 1.0000 1.0000 0.9268 0.8232 0.7607 REINFORCEMENT THICK. 0.0000 0.0000 0.0000 0.0395 0.1074 0.357:3 0.60 0.70 0.80 0.90 1.00 O.7236 0.70BC 0.7021 0.7021 0.7021 FINAL A/T O.19I0 0.2062 0.2121 0.2121 0.2121 REINFORCEMENT THICK.
END OF pc-CRACK
- hw $m 4 Csse Bewbwo c7.cc l
l l
l 'I
_ ___-___ D
, cenn.uo NORTHEAST UTILITIES SERVICE COMPANY
' SUBJECT ,A$ILL$70WE WIT btti. i er yttsost ATisisoe OATE =f/2 ll61 tvet o cra.ci At bneu- (vr to eToC CHKD. BYib 6Yarr#DATE (!2/ !85 w& ~R oavP s'rsW4 WFl0 CVQ's CALC.No.68-0 H-lo8b W R E v:
0
tm l pc-CRACK
( C ) COPYRIGHT 1984 1987 STRUCTURAL INTEGRITY ASSOCIATES, INC.
SAN JOSE , CA ( 408 )978-8200 VERSION 1.2
~
STRUCTURAL REINFORCEMENT SIZING EVALUATION FOR CIRCUMF. CRACK. WROUGHT / CAST STAINLESS MP1 RWCU WELD-CUAJ-5 OVERLAY DESIGN WALL THICKNESS = 0.5000 MEMBRANE STRESS = 3578.0000 BENDING STRESS = 8669.0000 STRESS RATIO = 0.7345 ALLOWABLE STRESS =26675.OOOO FLOW STRESS =50025.OOOO L/ CIRCUM O.00 0.10 0.20 0.30 0.40 0.S0 FINAL A/T O.7500 0.7500 0.7500 0.7500 0.7500 0.6797 REINFORCEMENT THICK.
O.1667 0.1667 0.1667 0.1667 0.1667 0.235__6 END OF pc-CRACK n
, .roun. wo NORTHEAST UTILITIES SERVICE COMPANY SUBJECT Al LL.sfoyF Vb/IT WO $ 8Y k6t$sd kttvloo OATE AfDl81 w+to ovGet H des tur) Le fuerok cHKO.srCrmikrovtoATE WZ/l29 wATw c(ute Wa7& 4 WF40 f vA"- 5 CALC.NO.dlS*0M-leOEdif R E V.
O
_ _ _ _ SHE E T N O. /0 0F I%
. 78f WCto oV5G/Y IPilkpfts WILL TPGJ 6f fiekey As o. gy
tiltahTG Th filtv bivbs o
49 virtGO bvE L D Ov5gt y & gt:
[ rom fil. S 7PC WE1D PVT AHic7Fo ht is coufnWGb "lo assTutta B'fter totAYfty o. 7 5 feo n W Wito Fussoa (c.e, l
' Tot of 7tE Lv&l 0. StWCC TPt wiCTri of tv&Lo C vpf- S wps ft%vtztp To Of NNo F'M'Ifi Y i" IAE /41stvtMups 4)ot
'Nerelcal u/F(o 7Kra Bf chevtA7cv A) Tbunwn:
kcen,n b'sTNICC (4M 'vCt o c&stTM i ski 96 NE cuf + 7p tuat.
/4 /_ (torto tulo74) + flAE + toot TFierur u 2
p.6 kg } (Q + 0 25 + o.25 : l.16 7 in A o.6 Eon,q = l.0 -
/.0 f 4.'5/25 (o.5) or
= /,6 csc,
+, -J o
j i
'_ c ' $ san uo .
NORTHEAST UTILITIES SERVICE COMPANY
$U BJ E CT' N/d370 A/[ DMT N0/I BY f/8t bd N&v6 DATE f/f//87 H f(D av6e t y ~ 364/(wJ M E44(Tot CHKD.B EW/ & W DATE Y 2/ 89 WVcc et wv r Tyy&i ke(o C W 7, S CALC. NO. 88*'l4- 1086M R E Y. i.
SH E E T N O. II O F _. O^
t I
N.
- i.n y
' A-r /
o.g /wwonwy /
.n i
PLK MLD VAb6 M WlMV6 bt HEtJ 5)o t45 a e 4{ = vP To I5 si
,. s 7g1 e
f o.c / wu,o m r /
4 i l
l l vot.uE.
I rire wap l
f f i
l RCCo MMENDE b bM EtabteeJi t
f 1.
p ,
,.. ['omz ,wo ' NdRTHEAST UTILITIES SERYlCE COMPANY SUB)ECT J/d .irw( vNI T 6/D,4 By peKjW APC6oo DATE (/2//dP7 net o avEbtM .% a rw Ra t eMro t cHKO.BY$N?Mw&oATE 4,l!fo9 vie 7se CL w vt 51s7En Wet a CVM-5 calc. No. 6 6-ol4- 1o 66 69 REv. 'O 5HEET NO. /I 0F O f
I
, @E495t4tES '.
- d. $194tTveAL IWTEhf\T7 f t W A \. RecoRT gge - $7-026 j H MSTouE OMT (Jo .1 L9 t* B%te.( getM [v A w7f sa g",
wa z/s/es E. 7ttecot y feati J.T.ttesLLs To p 3. Ateves o friimeks)
- 3. fecease o A m osv E % Ass e s eere I, , s u g . 3 c,s o ,
Accee7/iser ce:TsesA foe Raws sN MmTic. PiesN + ,
bbTw [M@Y 16, 1986
.4 EfW\ RwoRT wa s - NP- 8 A7 2.
- 5. GPR) RbPstt7 t/f'144, $rvoirj gra pi s l 7tre . S
- 1 STelal(52 57te t (IflNG t{
wetoM kvD fe Uss is 6 WR.
M(,[Q7/3M p D47bO 12- 7 8 I
I
-- . - - -_,u w gmgm g APR-20-89 FRI 7 : 45 p g, 7 ,,- '. e'.2/i,%Y4$M,ti:'MN$rg'gg, gJj,yg$ yay,{ig,p -[J.,, j,, g,(,,,/ p s, e, , g;;(,;};jgtje;g
, , ; ;' . . . - , g a t j ,j e,uh ue NORTHEAST UTILITIE$ $ERVICE COMPANY SU BJ E CT H//' f y/T ///L'f //) I SY M 3 0^/ ,17G Ln DATI d?/N l (t { t o O!'e ' + % CA * [@ (*G3 " "0 6 CHKO.gY_ N r Y:1M OAig d 1' B
. , t. 7 rer- c~ - ( p + :;'- -
-) ?>* e s f. , ' < r. P ura - 5 cggc, yo, M-ola- 10% W p g y, O 0--
suceT we. I3 or- ^
~n -
to N
7 % %
3+ @ M l
~
m A++
.J 0%
O ~k.
Z %
M Q v?
A 4 e i
>Q CD t
h tt 8- % N b dN a >
a v s
k W U > L gk- =
,, , p o
.d
$. hu g' NO
.. y i -.
. 4. d.
i
- t. . , . 9
~
\M "t*-
. ;jppfpj " sy,,53%.s i . ';- ,, ,
j
!, '.' ". ~ . ,1 .
s 9.gW .,gg.. ,&:. .,
)
,],
(@E% NRM %6. 5" g.7,g l.;.i p ipig y .b. i Q 4. a , g 4 ' ,
.. .v,1m.m -- -
g tc f' . .' SOY t ,
I
[
.s . mer ; .,..
- w.p'.
,, gy. i.-lt,.:.. .
' ;i
< -Q:
..n
, t ..
i
' r. .
4q . ._
1 ...
t , ,0 a
e,-
y 's t - .
x ,e %c . v f D
. c ~o 4 , , m
,2- t
- o. 5 :3 .
2M o }e%
j
-d * -4 iy9 a
.y. j e , - -
"g
.4, -
'i.j
. . q-hD o
~\
.i..
y 2
C
. ) (
\\ i
, , . l.
'l
Docket No. 50-245 B13249 I
Millstone Nuclear Power Station, Unit No. 1 Attachment 3 Summary List of IGSCC Examinations l
May 1989
}
. a; 3e, 1. ; j
, " MILLSTONE UNIT NO. 1 '
S'
_I_D_I.fN_DE_GIS.IU_S_BE_POSI.
, ,r n..p' .;.' ,7 4V"p 'y ., g'*? q ...j ..
.> . u.mn.s , . , c.. 2, -
. DATES.,f 10SGG_gXGd5 TIME: @iz;5/04'/S9pgi. i500 p gjih t u. *:2 REPORTe
..., N k h . W24 Wn n
SYSTEM'w ne <gWELDS/ITEMSCINIT. EXAMS WELDS / ITEMS ~ WELDS / ITEMS. WELDS / .
c~ ACCEPTABLE e.VSCHEDULEDr.>?
f s, COMPLETED REJECTABLE U N D E R . E V A L' A. A.,.. . . . .w, mamisamm
- n. mamasemammanas sumam.;:sammass samamasemmmme am ansammaa man se n sa m me ne ss as e m su , ss es am m e ssu m m,:
- v. t. .. z. , ,
2S" RECIRC.'
r9, .. , . . ,4,... .
.n' .
]
',.1. g.'. _ _ _ _ _ - - _10 15 0 ' _ _ _ _ _ - '0_ .,__gOdELgIl _/_ @:: n n, wi w
. - ' 'd / #i. ' a .3 '
rWJtk 'I 22 " REC I RC; w;._' 2_,,_;, _. _' ",,_.___ __ _2._ _ ___ _____, _2__________ _ O___,s( _ ____
_- :p,Q
-- ,---Qg lgLg. A'.p i . .d y.0 m' .. . .. . .. m,u. i 1 S" LPCI.,S,q.M g3 ' .s: . M 3 }_ _____ ___' _3_3________ _ _0_.___ _ _ _ ___-'_0_y'
. e ,e
, . . , .3
_- .ie_- 'd,.y.y,Ogd
'16"LPC
. a., p ,,, ...,,c; w
. ' .I,,. s s.; . 4_^,..u ,_ __ _ _ _ _ 4. _ _ _ _ _ _ _ _ __ _6_ _ _ _ _ _ _ __ _ _0_ _ _ _ _ _ _ _ _- O._' _ _' '..
_-. i t r.a_< C Q M E L E Il ISO. COND ' '.'l 4.. _6_ _ __ _ _ _ . 6. 6 .,. -._ _ C_ Q U E L g Il
- _ _ O_ _ _ _ _ _ _ _ _ _ _ O_.
.R.. .a .
' n.
1 4 " R E C I R C . .. 4. _ 1 _< _/_._ _ _ _. _ i _ _ _ _ _ _ _ _ _ _ _1 _ _ _ _ _ _ _ _ _ _ _,.,a_,.CObEL
. 0_ 4_______
I S O .cC OND ;, , r . x, ~
'u5 _* __ _ _5. _ ____ ___ _ D_ _ ____ __ __0___ _ _ _ ____0,_.,_ _ _C_ Q DEL gIl ' _ _
,S. D. C t e ,s! ,. . . 2___ ___._2_____ _____ 2_ _________O___ _______O_.,_ _' _C_gMELgI['
,3 7 , 1 . s . , . , ; . vi 112" RECIRC.. 14_ _ _ __ _ _ _ _ . 1 3_ _ _ _* _ __ _13_ __ _ __ _ _ _0_ _ _ _ _ _ _ _ _ _ _0_ __> E_4 ,-_ _GQdELgIl I S O . C O N D a, ., . ,.' 6_._ ____ __ _6.__ _________6____ __ __ __0_ __ __ _ __ _. 9_ _ g gd E L E_I[
L*
- s
.. g 1. ,.g ..,..t;. . .
1 0 " / I S O .' C O N D .' 1 _0'. _ _ _._ _ _ _ _ 1 0 0 0
--________10__________g___ _______g__
.- .aGQdP d. l
, g _________________________ _--
.-?Nh -i . .
g 9" ' HEAD'. SPR_. _d , ' , ,___-_____.1.___________1_.__________0_________0__.d.... W;,'g..
. 0, e s . 4 s ..
.. GO_MELgIl HEAD. INST.m.1 1 1___________1___________0_________-__0__- ,' --_ggdELgI{
a . ,.p... . ... . <
\
S"' CLEANUP W _12_%_o_ ___ _.__17_______.___16._ ________1 _ _______O_ W_,.a ., ,,..,,..a_,. ..G ISO.CONDj .l19_ ________10___________10____ ______.0____ _______0__ ___GgdELgI[ l 6 " HEd DNNT.N. . _.L'______ __..._1 __________ _1_ __ ____ _ _0_ __ _ _ __ ___ _o_' .',_._-_ ' f.U C_dhdl Mil .
ISO.COND, _9_________
a om________ __2____ _____
. . 0___________0___ ,_ggdELgI{ <
0 . _ b .' ,
5" CRD CAP. _l' 1___________1___________Q___________0______GQUELgIl 4" RECIRC. ., ,
6, . . >
4 6___________0___________0__'__,__GQdELEIl _ l
.. i ; s.
WELD OVERLAYS. .
- N' 22" RECIRC... '1 . 1 1 ____0_ ____ ____C__ s.,_' _"_GQdELEIl 16"' ISO.COND 1 1 1_ _________ O_ __________O_ __GQdELgI[
1 2 " , R E C I R C ....J.. _ 6 _ _. _ _ _'_ _ _ _4_ _ _ _ __ _ ___ _ _6_ _ _ _ _ _ _ _ _ _
_0_ __ _ _ _ _ _ _ _-_0._ _ _.
- _ C O_ M E L E I{
S" CLEANUPb.,:_1 0 0 0 0 g8@g6_IN[' '
. ..a.9 . ......
TOTALS'.W.W'.i= ,'9, .156s ' .?
155 m... .
154 1 0 , ,. h . . . . . ,.s 17.9 c -
EXP. REM ,
i i
)
i f
_- - - - _ _ _ _ _ _ - _ _ - _ _ . _ _ - - - - - _ _ _ - ~
C. .al -
l LPCI "A" Continund
' i ACCEPT REJECT EXPOSURE COMMENT, T- !
....CCAJ-10 D. 1 6 " _' .._ _ _ _ _ _ _ _ _ _ _ _ _ _ _X _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ z _0 _6 _0 _ _ ._ _ _H_C O _M E L E _
CCAJ-11 D t16" X___________ 0 0_ _ ___ C_ O.MP.
_ _ A _6. ....L.EIE. 't i 9. - !
CCAJ-12 ,
D 18" X
__________________t 10_0_____ COMEL gIannd 3,
CCAJ-13 D 18" X {
_____________z_15.0.m___'_ C_ D.M. P. L. E_ I E_ '.
CCAJ-14 'D 18" X~~~~~~~~~~~~~~~~~~ 130 '
I COMELEIE..
CCAJ-15 D 18" ~US T I~~~~~~~~~~~X~~~~~~~~~~~~~~~~~~~I285~~~~~EOBELEIk
~
{16} CCAJ-16 D 18" li..i.T___
-- I~~~~~~~~~~~X ______________z_IE5_~~~~~CU_.SP.LET.E.' __ _____ _
EN-ISI-DW- UT INSP. LPCI "B" ACCEPT REJECT EXPOSURE COMMENT i
CCBJ--1 D 19" ~X sw. - 090 <
COMELEIFK !
CCBJ--2 D io" X
~~~~~~~~ Uh6~~~~~UU I CCBJ--3 CCBJ--4
,D D
18" X
___________t.-9_5~~~~~U 6 _____ ET.F. . 2 I 18 ",_ _ ..._ _ _ _ _ _ _ _ _ _ _ _ X _ _ _ _ _ _ _._ _ _ _ _ _ _ _ _ _ _ _. 0 6 0 CDHPIEfE ,,'
__._______________________________x.gg_____gg..
CCB'J-10 D 18" 18" _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .X _ _ _ _ _ _ _ _ _ _ _ _ _COMElE _ _ _ _ _2. 0 6 0_
CCBJ-11 D CCBJ-12 D 18" ~iFiT~~~~~~-~~~~X-~~~~~~~~~~~~~~~~~*060 x Ib CCBJ-13 CCBJ-14 D
D 18" ~U..SI.I_~~~~~~~
18"
- _ _ _ _ _ _ _ _ _ _ _ _X _ _ _ _ _ _ _ (TE 2. _ _ _ EL .I..E.. ____
X__________________z__9_0_____C..OMP_LE.lg 0 _ _
5 3
{11} CCBJ-15 D 18" X 1 30-0 COMELgTE. g . (, i, EN-I'SI-DW 'U'T.INSP.. ISO.COND SUP. ACCEPT REJECT EXPOSURE COMMENT., i
.ICAF--i 81 1 4 " _ P.. R..E..- M _S _I P _ _ _ _ _ _ _.X _ _ _ _ _ _ _ _ _
. . _ . _ _ _ x 0_ 6 0. . __C _. O M. El. E.T.E '.,. .
l,
_ P. .O. . .S.I_- _. M.. S _I P. X . _ __x1.7.0_____C.s O_ _ME[aE.TE, 5 :
{2) iCBF--i E 14" PUGT-MS_TP. y. 1.30n GOMPLgIg
_ .a .,
[
EN-ISI-DW- UT INSP. ISO.COND RET. ACCEPT REJECT EXPOSURE COMMENT l' ICaJ--i D X 10", ________________.j_________..________t.?q$_____CO.MPLEIE.
_ _ _ _ _ _ _ _ _ _ _ _ x .7. . g_.____ a g... . .,
. ICBJ--3 D 10" X__________________zijn GOMELEIE i
.ICBJ--4 .
D 10"_-.-.____________X 070 CO_MELET.E i i ICBJ--s D 10" _ . (.. P.T. .) _ _ X ________xoAO gsg.ME.LgIg.
ICBJ--6 D '
10" X OLD~~~~~COMELEIg'
{7) ICBJ--7 D 1 0 " ... _ _ _ _ _ _ _ _ _ _ _ _ _.g ~~~~~~~~~~~~~~~~~~
__ _____________5 _ z 7. _0 _ _ _ s _ _ C 0 b E.I= E= I.E EN-ISI-DW- UT INSP. SHUTDOWN CLB. ACCEPT REJECT EXPOSURE ' COMMENT SCAJ--2 A 14" (PT) X~~~~~~~~~~~~~~~~~~ 235
{2} SCAJ-CU1 A 14" (PT) X______ ..________ t_5.5~~~~~COMPLEIF 5.______dah..Mst$.ET.$ . . _ .
EN-ISI-DW- UT INSP. CORE SPRAY EJECT EXPOSURE COMMENT l CSAF--1 81 10"_ P. R.E .2. . M.S..I..E _ _ _ _ _.X...
. _ _ _ _ _ _ .. _ . _ . 4.p. 1 9r _ . C.
.. D d E L FmT E-t
_ P. . O. .S.. .T_ .M. p. _T P_ _ __ _ _.X. _ _ _ _ _ __ _ _ _ _ _._ _ _ _ _ t _3. >9 4_ _ _ _ _ C. .O... ME_L E.TE. .
CSAF--2 81 1 0 ".. P. R.E..._- M S _I P. _ _ _ _ _ _ ._X .._ _ _ _._ _ _ _ _ - _ _ _ _ x 2 D O
.. _. CQM.P.I.ETE
- 2. . .
l
_ P... o.r.Ia _- d _S _I P. _ _ _ _ _ X. _ _ _ _ _ _ _ _ _ _ _ .._ _ _ _ 2 _ 8.. 2 6.. _ _ _ _ G 0. d E L E.T.Gr i
i
{3) CSA3--2 '
'A 10" _ . (. P. .T.. .) _ _ ___ _ _ _ _ .X. _ _ _ _
_ _ _ .._ _ _ _ ..2.. 5 0 . C _OdEl= F..I C.-
. i, EN-ISI-DW- UT INSP. CORE SPRAY "B" ACCEPT REJECT EXPOSURE COMMENT 8 CSBF--1 81 10 " _ UN. . E - M.. S. _T P_ _ __ _ _ .X. _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _1 2_
4 0_ __ C._ O M EL E. .T E '
Pela -MSTP ( x .130 COMPLFTE * '
CSBF--2 G1 10"[hUU-hS5h_((P((T)((X~~~~~~~~~~~~~~~~~~$h3U(((([ i
_ P n. . .S._ .I. _- d.S.I E'_ _( P..T _) _.X _ .. _ _ _ _ __ _ _ _ _ _ _ _ _ t ,7 6. 0_ _ _ __ _ G. D.M..EL E.T E CSBJ--i A 'i O "_1PI) _X__________________13DD_____G0dELEIE !
{4} CSBJ--3 A 10" (PT) X __________tibo COMELETE {
o ;
EN-ISI-DW JT INSP. CLEANUP SUP. ACCEPT REJECT EXPOSURE COMMENT I CUAJ--1 A 8" .<r..p_.__
x _ 1.'.1.
+ .M. _ ...._ C 0 d. El. E.T E.
CUAJ--2 A 8 " _. . < P.T. _) _
X _1_2_2 0. _ _ _ _ G .O.M.. P. L g.T E '
CUAJ--3 A B " .. . ._______ ____ y. _ _ _ - _ _ _ _ .._ _ _ _ _ _ _ s._0.6. 0 _ _ _. _ _ g o
_ ._ d..P..L. E.T E CUAJ--4 D B" X ,. lug _____GOMELEIE .
CUAJ--s D B" X _ _ _ -_ _ _ _ _. 2.7- . n._ _ _ _ _ Cl).M...P. L. 5.I.E.
g -
t '
1 PAGE 3 'I }
_________w
' ,. EN-ISI-D'W~ UT INSP. RECIRC. "A" _ ACCEPT REJECT EXPOSUR'E . COM' MENT I
., " RCAF--i G 1 ,28 " _-.-_ Pl < E-d.S._I E_.______ a__________ Y M A) .
_______s.0_20___.N_ C.OdP_LEI
.:i . - _ Po...sI-Ms i e X 2.n_ _6 0_ _ _. . C_ O_ M.E L g T g . d .
RCAJ--i ,E 28" . _______ __ __X .6 Z E _ G. O_M EL g I g Jy,;y BCAJ--1A. C 28"__..._____________X s.3_ D O_ _._ _ _ _ C O M E L E_ I E.
RCAJ-5. C, 28" ~ ( 265 COMELgIg7 %
RCAJ- CJ 28" h__s._____~__~~.~_~.~.~X
_ PIL.
) ._ ~ ~ ~ ~ ~ ~~~~~~~~~_ .X._
___ __________ a.5 Z g".__E . . ~.GgdEL gig 9W RCAJ--7 E *.28"_
. _. _ ___ __ _ _ ___ __ X _ _ ___ __ ___ ____ __ m.10 5_ _,. G OM PL EIg d3 ,4 .
_-__________________________s. u_ ____ _ .
RCAJ-PB1.. D. 4" X ___p' __,,s.O20_,.___Go..dELgIg ,f %,...t
_- . ,o-(9) RCAJ-PB2 D 4" X 3.QdQ __ ,_GOMELgIg/VP.,~1
.w n -
,. t . .
.if,e. Il EN-ISI-D'W- UT INSP. RECTRC. "B" ACCEPT REJECT EXPOBURE ,
COMMENT D,'
RCBF--1 D 28"_!dIST dSIE_ ,___X s.20E __G0dELEIg/?3:'
RCsJ--s C 28" X .0_6n Go.MEL. gig ,M RCDJ--4 C ,28" X 1.0_ 6. 0._ _ _ _ _ C_ O P_ L E T F f.;,' . ,-
RCDJ--5 ~E 28" .__ ___ _______K___________________ _ igg _ _._ CO_MP_LgIg.M.
RCDJ--6 .C 28" X_ ________________t10_0____ nCOdP.LgIg.n' s .
3:.;i .
RCDJ--7 C' 28" (PT) X ' 0 6 D ~ ~' ~ G O M P L g I g .,a
-RCsJ--8 'C 28" X ~~~~~~~~~~~~~
5gG ~~~ C56ELgIg N,-
. RCBJ-IC1- .D 14" (PTl X tuSO______FaO.MP. LEI 5 N, '
RCBJ-PB1 '. D , 4 " _ -._ _ _ _ _ _ _ _ _ . .X._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ s.O_ ") e O_ _ _ _ C_ O_ M P L EI.E f, W
<10) RCBJ-PB2 D 4 " _ _ . ._ _ _ _ _ _ __ __ __ _ X _ _ ___ _ _ _ _ _ __ _,.0_6 5__ _ G O_ M EL EIg .; ; .-
7 EN-ISI-DW- UT INSP. RECIRC. MAN. ACCEPT REJECT EXPOSURE COMMENT, l'
RMAJ-1 C 22" X s.0_.0.0.____'_CQ.d_PLE..IF,'.
RMDJ-4 C 22"_Jel) X ,.119_____GOdELgIg .
{31 RMDJ-RRH C 28"_JP.Il ___ ____ X____. ________ ____,.100 _ _GOMELGIg' i
EN-ISI-DW- UT INSP. RECIRC. RISERS ACCEPT REJECT EXPOSURE COMMENT .
,RRAF-1 . G1 12" fME-MSIE__ _,_ _X __ __,_ _ __ ,___,.Q2O___,_GOMELgIE ;
_EURInd!!1E______X____________ _____.260 ____G0dELEIE. !
RRBF-1 G1 12" PHE--dSlE__ ____X________ ___ . ,___,.ldQ___,_GOdELEIg ; .
_P0!iIndSIE ____X a.160 _ ..GOMELEIE-
. RRCF-1 D. 12"_PHEndSIE______ X 020 ,_,GQUELEIg~
PH3I: dale _ _X_______ __________.2dD___ G0dELEIE RRDF-1 D 12"_EUSIndBIE______X 3.3SO ___,GQUELEIE RREF-1 D 12" !;'0GIndSIE _..___X
_ __ __ __ _ ___,210 G0dELEIg] '
RREJ C 12" JJ'Il _______ _X 2.120 _ __G0dELEIE RRFF.-1*. D 12"_PHSIndSJE__ __..X __ ____ __ ______t21D ..__ GOMELEIE RRGF-1, D 12" PUSI-.dSIE.,___X c21D____G0dELEIE RRHF-1 G1 12 " .flig--MSIE___.____ X_____ ,,_.__.__._ _._ _,.9 2 0___ _G0dELEIE EUSI:dOIE 1 Ell X_ __..__-....__ .___..t20G_____GOMELEIE RRWJ-2 C 12"_jpT) X ,,12O_ ___GOMELgIg 8 RRHJ-4 .C. 12 " _ -( P.I. . .)._ _ _ _ _ _ __ _ .)( _ _ _ _ _ _ ___ _ _ ____ _1. 2_6. 0_ _ _ __ Pa O M PL_
_ _ E_IK RRJF-1 'G1"12"_ P. R. E. _d 8.1E _ __ _ X __
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ s.0_9_0_ _ .C OMEL g. F.
.. . PODInd!!1E_1EIl_X_ _____ ____ ____&lZO__ __GOMELEIE '
RRKF-1 GI 12"_!f.HEndSIE__ X___ _ ___________,.020 ____COMELEIE ,
_POSInd!!1E-_1EIlX .105 --__G0dELEIE (14) RRKJ-4 C 1.2"__..___.__________X_______ _________4.200 ___G0dELgIg EN-ISI-DW 'UT INSP. LPCI "A" ACCEPT REJECT EXPOSURE' COMMENT CCAJ--i C 16" X __ __ _ _ _ __ _ _ _ _ __ _ s.1.8. 6.._____C O M..EL E_ T. E.
CCAJ--2 .D 18"_.._.______ _ ____X_________ _ _ ____,.202__ _G0dELEIE CCAJ--s D 18"_.._ ________._ _X__________________,.1dg_ __G0dELEIE CCAJ-4 D 18 " __. ..___ _ ___ _____ X __ ___ ___ _ _ _ _ _ _ _ _ _2.d d 3___ __ G 0d E L EI E ,
CCAJ--s D' 18" x s.1 0. .n._ _ _ _ g o_ d.P L E. I..E CCAa--6 D 18" X ~~~~ COdPLEIg CCAJ--7 CCnJ--8 D 18"_....__________.__X_____________'__mN.n6ne O .Cd_p._6E_I..g _.
D. 18"_ . _ ..______ ___ __X__________________,.lde__.__ GodeLgIg CCAJ--9 D 18".._. _ _ ___.X.________ _ ___:.07. 0__ __C_O..MP.L.E:.IE?.
PAGE 2
, CLEANUP SUP. Continu d ACCEPT REJECT EXPOSURE COMMENT : . f. . -
CUAJ--6 D B" X s.1.00__ __J-CQdP_L E T_g 'r.#. ,,,
{7) CUAJ--7 D -
8" X s.0 0.__ '.,.
. C_O .*
6 EN-$SI-DW-UTINSP. CLEANUP RET.
ACCEPT REJECT EXPOSURE, , ' COMMENT /
CUDF--2 D 8" X 1.0_.1.8.. GOM.PLE.IE .;
' . CUDJ-3 .D 8" X O20 -
CuBJ-_4 D 8" (PT') ' X 555~~~~~COME FI f.,55 CUBJ--S D 8" x a.5if~-
. _ 55d.P(l _ ETE p 'i.. . I,
{5)- CUBJ--6 D q
, 8 " _ _ ._ _ _ _ _ _ _ _ _ _ _ _ .X _ _ _ _ _ _ _ _ _ _ _ _ ,,,,_ _ _ 3,0_ }.O _ _ _ C_. O_ M.. P ,
c ..
EN-ISI-DW- UT INSP. CRD CAP ACCEPT REJECT EXPOSURE COMMENTW
{1) CRDF--i 81 5" P..h..E. . M...S _I P.
X s.O_ D O _ _: C O..M P_ L E I g k. . G,..
, POST-MSIE .(PI.) X _ _ _ _._ _ _ _ _ _ _ _ _ _ _ _ s 1.9>. 0 OMPLEIE,.~#..'>
. , . c, EN-ISI-RB- UT RPV HEAD SPR. 108'EL ACCEPT REJECT EXPOSURE v COMMENT,.l.
{1) HSAF--1 D 9 " P...I. .E. iT d.S _T E. _ _ _ _ X._ _ _ _ _ - __ _-
- . _ _ _ _ _ s.0. 0. 0 -___ C_ OM. ELElg EN-ISI-RB UT RPV HEAD INST. 108'EL ACCEPT REJECT EXPOSURE COMMENT.,
{1) HIBF--1 D 9 " {. .D. .R..T M. S_ _I E X 3.0 0. 0 _ _ _ _ C O.. M P_t.m E _ I.g , . '.
';;n.
- EN-ISI-RB- UT RPV HEAD VENT 108'EL ACCEPT REJECT EXPOSURE COMMENT q'
{1) HIAF--1 81 6 " _ P. H. . E..M_
. . S. .I.E _ _ _ _ _ _ .X. _ _ _ _ _ _ _ _ _ _ __ _ _ _ s.0_ ].G_ _ _ _ __C O. M E L gig, + * .
PN G T-U SIE_____ _.L _ _ _ _ _ _ _ __ _ _ s.010 GOMeLEIE W a : i.
e.j EN-IS -RB- UT~INSP. LPCI "A" ACCEPT REJECT' EXPOSURE' :. COMMENT 'I CCAJ-17 'D 18" X s.O_20__ F__CaO_dP
'CCAJ-18. D, 18" X
CCAJ-19 'D- 18" X a.O_
0 2 0. _ _ _ _ C D.M P Li '.E I .
L .-
CCAJ-20 D 18"- . . . _ __ _ _ _ _ _ __ _ .X._ _ _ _ _ _ _ _ _ _ . s.0_ .3 5. _ _ _ _ G D. DEL E T..E a :
{5} CCAJ-21 D 18"_.....__ _ ____.X _ ______ __ s.035r_. __CO_MPLEIE .
EN-ISI-RB- UT INSP. LPCI "B" ACCEPT REJECT EXPOSURE COMMENT CCBJ-16 D 18" X s.047 GO.M L.I:. ,
~
CCBJ-17 D 1 8 " .. .N. .
- T. l _ _ _ _ _ _ .. _ _ _ X _ _ _ _ _ _ _ _.. _ _ _ _ _ s.O_ j. O. _ _ _ C O M. P L E. I E. '
CCBJ-18 D 18" u T) X olo COMPLEIg.
CCBJ-19 D 18" n 'T ) x I8d5~~~~5di15LEIE
{5} CCBJ-20 D 18"_.(PT.).___ . _ _ X._
. ___ _ __ _ ..___1.030 ___CQdE.LEIF.
EN-ISI-RB- UT INSP. ISO.COND SUP. ACCEPT REJECT EXPOSURE -
COMMENT I C A.1- 14 A 14" .a:11 _____ ___x ,.geg_ ___G0dELEIE-ICAJ-15 .A. 14a O'T1 . X z.0_00._____Go_d.PLEI.g ICAC-F--1' D, 14" X z.000._____P.O..MELE.IE ICAC-F--2 D 16" X _ _ ..0._ _1 0. _ _ .,0_ . .?.
ICAC-F--8 D 16" .. ..._ __ _ X__.
. _____ _ s.000_
_- GO.ME.LET..Ei .
I ICAC-F--?.~D- .
16" X s.0 0.. _ , _ O.. . .' . .
ICAC-F-10 D 16 " .( P. . T.. ) X s.010 COM. ELE g.
ICAC-F-11 D 16" (PT) X 010 GOMELgIE O ICAC-F-12 D ~12"~'~ X IO1.O_,_ _GUddLEIE ,.
\ ICAC-F-12A D 12" .
s.60. 5..-__ ,0..P _ .. .
ICAC-F-14 D 12" O 'T ) X s.01.0 _ cod. P. LEI.g ICAC-F-15 D 12" O 'Tl X s.005.-_ -_CO..M..P.L_F.IE ICAC-F-16 D 12 " _..( U T ) X ,.QOQ_____COMELEIE ICAC-F-16A A 12" (PT) X 010 GOMPLEIE l
ICAC-F-20 D 16" X s.U_IU____~ ~~~p.5_ E..i.dL EIg '
ICAC-F-29 A 6 " .. ( P T ) X s.nOO.__
_. _C.O..M.. PLEI. U.
(17} ICAC-F-31 A 6" - . P.( T. . .).
. _ .. _ .. _ .X. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ s.n o n.- _
. C_...O. M P. L. E. I. E.
1 l
l l
PAGE 4 l
i
N-ISI-RB- UT INSP. ISO.COND RET. ACCEPT REJECT EXPOSURE COMMENT d
~ #- ICBC-F--9 D 10" X 005 COMELgIg
~~~~ 800 ~~~~~GUMPLFIg IC'5C-F-11, A B"((dI) X_____________(((([IQ1D_____CghEL$Ig ICBC-F-15 D B" X _,.00D_____GOMELgIg ICBC-F-16 D 8" jpT) X __tOOM_____GDMELgIg ICBC-F-17 D 8"_ X _ _ _ _ _ _ _ _ _ ____ __ _ __,,90 D __ _ _ _ G D ME L gig ICBC-F-18 D B" X__________________t909_____GDdELgIC ICBC-F-19 D 8" _ P.T.L
(
X _____ __ ____ _______1_0_0__ 0- ___ C_0du"L E.IF-ICBC-F-20 D 8"_jpT) X__________________tOOO GgdELgIg ICBC-F-21 D 10" X 'e t 005 GOMPLg,IE ICBC-F-22 D B" X O_
________________1_20_____CO.~ME.LL.IG ICBC-F-22A D 8" X__________________1920 COMELgIE
{13) ICBC-F-23 D G" X ___,010_____GDdELgIE EN-ISI-RB- UT INSP. CORE SPRAY "B" ACCEPT REJECT EXPOSURE COMMENT CSBJ-13 D lo" __ X _ __ _ _ _ __ __ _ _ __ __ _ _,.000_____C 0 DEL ET E CSBJ D 10"__ x ,.ggg_____G0 DELETE CSBJ-15 D 10"_.--_____________X.__________________t000 COM..ELg-_Tg a
CSBJ-16 D to" X__________________,.999_____GgMELgIE .,
<5} CSBC-e--2 D to"_ X__________________1990_____GOMELEIE EN-ISI-RB 'UT INSP. CLEANUP SUP. ACCEPT REJECT EXPOSURE COMMENT CUAJ-14 D 8" X _ _ _ _ ,. 9 2 0 G0debere Cun---9 D B" x__________________tigg_____GDMELEIE
<3} CUA--to D a"_ ______________x__________________tigg_____GOMELgIg EN-ISI-RB- UT INSP. CLEANUP RET. ACCEPT REJECT EXPOSURE COMMENT CUBJ-18 D B" X__________________t02M_____GOMELgIE (2} CuBJ-19 D e"_. ______________X______.____________tegg_____GOMELgIg HELD _DYEBLAYS EN-ISI-DW- UT INSP. RECTRC. RISERS ACCEPT REJECT EXPOSURE COMMENT RRAJ-4 E 12"_. _____________K__________________ 0f!D_____G0dELEIE RRBJ-1 E 12" X__________________,.06D_____GOMELEIG RRBJ-2 E 12" X _________1960____,GOMELEIG RRCJ-3 E 12" __
X .02D_____GDMELETE RREJ-3 E 12" X 3070_____GQUELEIE RRFJ-1 E 12" ..______________X_,,____________,___..,_060
_ GQdELEIE (7} CUAJ-5 E 8"_. ._________..___________________,____________D8DELINE l EN-ISI-DW- UT INSP. REC 1RC. MAN. ACCEPT REJECT EXPOSURE COMMENT
{1) RMBJ--1 E 22" X ___,.9Dg_____GOMELgIE a
EN-ISI-RB- UT INSP. ISO.COND SUP. ACCEPT REJECT EXPOSURE COMMENT
{1} ICAC-F--3 'E 16"________________X__________________1900_____GOMELgIS i
(101} DRYWELL EXAMS
{53) REACTOR BUILDING FXAMS *
(155} TOTAL IGSCC EXAMS ,
1 PAGE 5 E _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ __ _ _ _ _ _