ML20055J462

From kanterella
Jump to navigation Jump to search
Advises That Need to Maintain OL or Senior OL for Listed Individuals No Longer Exists,Effective 900701
ML20055J462
Person / Time
Site: Millstone 
Issue date: 07/27/1990
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-90-747, NUDOCS 9008020295
Download: ML20055J462 (1)


Text

.

1 e.- +

M oeneral Offices e seiden street, Berlin, connecticut H TFORD, CONNECTICUT 061410270 L

'Ta "J::: lrl'".=%"

(ron osumo July 27, 1990 MP-90-747 i

L RE:

10CFR 50.74(a) l 10CFR 55.55(a)

I

?

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

REFERENCE:

Facility Operating License No. DPR 21 Docket No. 50 245 Notification of Change in Operator or Scnior Operator Status, Millstone Unit 1

Dear Gentlemen:

i Northeast Nuclear Energy Company has determined that there no longer exists the need to maintain the Operating License or the Senior Operating License of the following personnel of Millstone Unit 1. This determination is effective July l

1,1990.

l k

Erwin J. Olszewski OP 10349 l

Edward J. Lindaay OP-61551-Michael J. Biglarelli SOP 10251 1 j

Yours truly,

.{

i NORTHEAST NUCLEAR ENERGY COMPANY 4l

mee, SteMe E.

cace Station Director Millstone Nuclear Power Station i

SES/GLS/lah i

c:

T.T. Martin, Region 1 Administrator W.J. Raymond, Senior Resident inspector, Millstone Unit 1,2,3 l

M. Boyle, NRC Project Manager, Millstone Unit No.1 9008020293 930"727 b)\\ 00 Y

ys s I

(M ADock osooo245 f

\\g l

PDC osun1 ntv. 44s 4

v-y e-r-r

'm M