ML20011F754

From kanterella
Jump to navigation Jump to search
Notifies That Jh Parillo Reassigned & No Longer in Need of License SOP-10263-2 as of 900219
ML20011F754
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/26/1990
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-90-194, NUDOCS 9003070395
Download: ML20011F754 (1)


Text

er -

d ,

L

.l ' o

[: MI General Otnces

  • Se6oen Street. Berim. Connecticut Ed7SUdI um, wa s=o u=*

EiEIN P.O Box 270 H ART FORo. CONNECTICUT 00141-0270 e 1 U J 7.'T'"'O'f,00,"1%

. CM) 665 sm r Febntary 26, 1990.

L MP-90-194 L

l. RE: 10 CFR 50.74(a)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

REFERENCE:

Fccility Operating License No. DPR 65 Docket No. 50 336 Notification of Change in Operator or Senior

. Operator Status, Millstone Unit 2 l

Gentlemen:

The following Millstone Unit 2 licensed operator has been reassigned to a position for which a need to maintain a license does not exist. This reassignment is effective on the date Indicated.

Joseph H. Parlilo SOP 10263 2 February 19, 1990 s

Yours truly, NORTHEASTNUXEAR ENERGYCOMPANY

& cn

  1. St n E. Scaco g

Directot, Millstone Station 4

i g SES/f *,d a L 0: W.T. Russeli, Region Administrator W.J. Raymond, Senior Resident inspector, Millstone Units 1,2 and 3 l G.S. Vissing, NRC Project Manager Millstone Unit 2 i

l Li 6030703,3900225 Dgp.

.PDR. ADOCK0500gj6 v .

~l