Forwards Vols 1 & 2 to Semiannual Radioactive Effluents Release Rept Jan-June 1990, Per 10CFR50.36a.Rept Includes Summary of Quantities of Solid Radwaste & Liquid & Gaseous Effluents
ML20059C206
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/23/1990
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059C209 List:
References
B13612, NUDOCS 9008310116
Download: ML20059C206 (1)


Text

p i

)

.g i:

General Offices

['diUI5iC IEuY~~

P.O. DOX 270 r..ru wi.==.""

CENE.',"'[7,,

H ARTFORD, CONNECTICUT 06141-0270

+

(203) 665-5000 k

k J

i August 23, 1990 Og h 4 Nos. 50-245 10.3Mt J

50-423 i

B13612 Re:

10CFR5036a j

l U.S. Nuclear Regulatory Commission

{

Attention:

Document Control Desk Washington, DC 20555 Gentlemen:

Millstone Nuclear Power Station Unit Nos. 1, 2, and 3 Semiannual Radioactive Effluents Release Report In accordance with the requirements of 10CFR50.36a, the Technical Specifica-i tions and the Radiological Effluents Monitoring Manual, a copy of the. Semi-annual Radioactive Effluents Release Report is herewith submitted.

This report includes a summary of the quantities' of solid. radioactive waste and liquid and gaseous effluents for the period of ~ January through June 1990.

An annual Radioactive Effluents Dose Report -(to be submitted in March 1991) y will include an assessment of the radiation doses'due to the radioactive i

liquid and gaseous effluents released during the calendar year (January through' December 1990).

The report has been prepared in accordance with the format of Regulatory Guide 1.21, and copies of the report are being forwarded in accordance with the provisions of 100FR50.4(b)(1).

Very truly yours,

)

NORTHEAST NUCLEAR ENERGY COMPANY 9008310116 900023 Jd PDR ADOCK 05000245' Senior Vice Pres [/

E. Jyottk'a R

PNV-ident cc:

T. T. Martin, Region I Administrator M. L. Boyle, NRC Project Manager, Millstone Unit No.1 J

G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 l

l D. H. Jaffe, NRC Project Manager, Millstone Unit No. 3 W. J jaymond, Senior Resident Inspector, Millstone Unit Nos. 1, 2, and 3 l

)

+ 1 Ei

\\

. - -.