B13531, Forwards Rev 8 to Updated FSAR for Millstone Unit 2

From kanterella
Jump to navigation Jump to search
Forwards Rev 8 to Updated FSAR for Millstone Unit 2
ML20055D964
Person / Time
Site: Millstone 
Issue date: 06/29/1990
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055D965 List:
References
B13531, NUDOCS 9007100202
Download: ML20055D964 (2)


Text

'_ - - -

.% s G5neral Officss o Seicen Street, Ebrhn. Connecticut 1

,I,DU$u'UYcC P O BOX 270 C'.72[U1, H ARTFORD. CONNECTICUT 06141-0270 k

k J

(203) 665-5000 ow.c ww u. um.

June 29, 1990 pocket No. 50-336 H1313_1 Re:

10CFR50.71(e)

U.S. Nuclear Regulatory Connissinn Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Millstone Nuclear Power Station, Unit No. 2 Revision 8 to the Vodated Final Safety Analysis Report in 1982,III Northeast Nuclear Energy Company (NNEC0) submitted the initial updated Final Safety Analysi s Report (FSAR) for Millstone Unit No. 2 in fulfillment of the requirements of 10CFR50.71(e).

This rule further requires that subsequent revisions of the FSAR shall be filed no less frequently than annually, and shallgflect all changes up to a maximum of 6 months prior to the date of filing Pursuant to 10CFR50.71(e)(4), as Attachment 1, NNECO hereby presents the Staff with Revision 8 to the updated FSAR.

This revision is provided in the form of replacement pages as required by 10CFR50.71(e)(1) an This revision presents changes completed since our previous submittalg(5).

which are necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Cornmission requirements as of December 31, 1989.

Pursutnt to 10CFR50.71(e) and 10CFR50.4(b)(6), this transmittal consists of one original and ten copies.

(1)

W. G. Counsil letter to H. R. Denton, " Millstone Nuclear Power Station, Unit No. 2, Initial Submittal of Updated FSAR," dated July 20, 1982.

(2) To meet the annual submittal requirement, NNEC0 will provide an FSAR revision by June 30 of each year.

However, for internal scheduling purposes and continuity with other annual reporting requirements, NNEC0 may provide the FSAR revision one to several months in advance of the annual due date.

(3)

E. J. Mroczka letter to U.S Nuclear Regul atory Commission, " Millstone Nuclear Power Station, Unit No. 2, Revision 7 to the Updated Final Safety Analysis Report," dated June 1, 1989.

[$ $$i

~

dp

(

,p asm m m

,.O '

q I

U.S. Nuclear Regulatory Commission B13531/Page 2 June 29, 1990 It is noted that 10CFR50471(e)(2)(ii) stipulates "This submittal shall include an identification of changes made under the provisions of Section 50.59 but j

not previously submitted to the Commission." Pursuant to'Section 50.59(b) and t

Technical Specification 6.9.1.4, such information is routinely submitted to the NRC as part of our annual reports and is not included in this submittal.

The' most recent annual report was submitted on February 21, 1990,I4) for the period January 1, 1989 through December 31, ';89.

We trust that this information satisfies the requirements of 10CFR50.71(e).

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY f

m E. J. Aroczka /

Senior Vice President l

cc:

T. T. Martin, Region I Administrator l -

G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2, and 3 l

STATE 0F CONNECTICUT)

) ss. Berlin COUNTY 0F HARlFORD )

l Then personally appeared before me, E. J. Mroczka, who being duly sworn, did l-state that he is Senior Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized tn execute and file the foregoing information in the name and on behalf cf the Licensee herein, and that the statements contained in said informatwo are true and correct to the -best of i

his knowledge and belief.

Mi

,/

l KotaFj TukT c -~ om' r

~

MyCommisson Expires March 31,1993 l

(4)

E. J. Mroczka letter to U.S. Nuclear Regulatory Commission, "Haddam Neck Plant, Millstone Nuclear Power Station, Unit Nos.1, 2,

and 3, Annual Report," dated February 21, 1990.

1 1

-