Amends 900604 Rev 13 to QA Program
ML20055D719
Person / Time
Site: Millstone, Haddam Neck  File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/29/1990
From: Mroczka E
NORTHEAST UTILITIES, NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055D720 List:
References
NUDOCS 9007090330
Download: ML20055D719 (5)


Text

-^

i General Offices e Seicen Street. Berlin, Connecticut 9

E"E$* E'E*N a

P 0. BOX 270 U 7.E.E.sC HARTFORD, CONNECTICUT 06141-0270 d

k C

J (203) 665 5000 i

l June 29, 1990 Docket Nos. 50-213 50 245 1

'50-336-I 50-423

)

B13559 1

Re:

10CFR50.54(a)(3)

U.S.: Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 j

Gentlemen:

l Haddam Neck Plant Millstone Nuclear Power Station, Unit Nos. 1, 2, and 3 1

Amendment to Annual Reporting of Changes to the Quality Assurance Program Proposed Revision 13 to the Northeast Utilities Quality Assurance Proaram Tooical Report 1

The purpose of this letter is to amend the proposed Revision 13 to the Northeast Utilities QualitQssurance Program (NVQAP) Topical Report which was submitted on June 4, 1990.

Revision 12 of the NVQAP:T ical Report that was submitted on Miny 25, 1989(2) 1 and subsequently approved, committed to Regulatory Guide 1.152 for only the Haddam Neck Plant in Appendix 0 of the NVQAP Topical Report.

The commitment to this Regulatory Guide is also for Millstone Unit Nos.1, 2, and 3.

This submittal is to amend the proposed Revision 13 of the NVQAf. Topical that was

'(1)

E. I J.

Mroczka letter to -U.S.

Nuclear Regulatory Commission- " Annual Reporting of Changes to -the Quality Assurance Program Proposed Revision 13 to the Northeast Utilities Quality Assurance Program Topical Report,"

dated June 4, 1990.'

(2)

E.

J.

Mroczka letter to U.S.

Nuclear Regulatory Commission- " Annual Reporting of Changes to the Quality Assurance' Program Proposed Revision 12' to the Northeast Utilities Quality Assurance Program Topic Report,"

dated May;25, 1989.

4 (3)

U.S. Nuclear 9egulatory Commission letter to E. J. Mroczka- "10CFR50.54 Quality _ Assurance Program Description Change Review," dated July 13, 1989.

O$3422 ' REV 4 86

^ YOO~/090330 900629

.PDR- (4 DOCK 0500gg3 P

\\

p U.S. Nuclear Regulatory Commission B13559/Page 2 L

June 29, 1990 submitted for your review and approval on June 4,1990.

It is requested that you include this change, as reflected in the attachment, as part of your review of Revision 13.

This change does not reduce Northeast Utilities' commitments.

If you have any-questions regarding this letter, please contact Mr. Donald O.

Nordquist at-(203) 665 5447; Ve.'y truly yours, NORTHEAST UTILITIES SERVICE COMPANY W

.E. J. MP5pda

/

Senior Vice President Attachment cc:

T. T. Martin.. Region 1 Administrator A. B. Wang, NRC Project Manager, Haddam Neck Plant J. T. Shedlosky, Senior Resident Inspector, Haddam Neck Plant M. L. Boyle, NRC Project Manager, Millstone Unit No. 1 G. S. Vissing, NRC Project Manager, Millstone Unit No. 2

'D. H. Jaffe, NRC Project Manager, Millstone Unit No. 3 W. J. Raymond, Senior Resident inspector, Millstone Unit Nos.1, 2, and 3 l.

.a L

L

i ATTACHMENT A Summary of Proposed Changes to NUQAP Topical Report Revision 12 i

i Ganctal l

Various sections of this revision have been changed % reflect the new organir.ational titles. All other changes not specifically identified are editorial changes for continuity throughout the Topical Report.

l OAP 1.0 Paragraph 1.4.2.3b, c Deleted because their activities are not Quality related.

o Paragraph 1.4.2.4b Delete. This paragraph becomes new paragraph 1.4.4 due o

to organir.ational change.

j

- Paragraph 1.4.5 Add. Reflects NU's new Nuclear Safety Concerns Program.

o OAP 2.0 1

Paragraph 2.2.2 Revised Quality Services Department (QSD) involvement in o

the review and concurrence with quality procedures. Appendix C 13st typical procedures that QSD reviews and concurs with.

OAP 3.0 l

Paragraph 3.2.2b Deleted " Environmental." 10CFR50.59 does not address

{

o Environmental questions.

i OAP 4.0 Paragraph 4.2.2e and 4.2.3 - Revised to reflect current Commerical Grade o

terminology.

i'

(

OAP 5.0 b

Paragraph 5.2 and 5.2.1 - Revised QSD involvement in the review and o

concurrence with quality procedures. Appendix C lists typical procedures that g

QSD reviews and concurs with.

Paragraph 5.2.2 - Revised to reflect the current responsibilities for the review L

o L

and approval of drawings.

l

(

4 r

s.

OAP 7.0 Paragraph 7.2.1c Deleted Coordinating Agency Supplier evaluation (Case) o which is no longer used. Nuclear Procurement Issues Committee (NUPIC) is Cu! Tent.

Paragraph 7.2.5 Revised to reflect current Commercial Grade terminology.

o OAP 15.0 Total rewrite to simplify and clarify requirements.

o Specifics removed (covered by implementing procedures).

o Deleted 15.2.2. Incorporated these requirements in other paragraphs, o

Deleted specific references to engineer constructors, contractors,'etc., and o

NUSCO Project organizations in that differences in implementing procedures have been eliminated.

OAP 16.0 Total rewrite to simplify and clarify requirements.

o Recurrence control was better defined, o

Definitions in Appendix E were added or changed in conjunction with this o

clarification, Deleted specific references to engineer constructors, contractors, etc., and o

NUSCO Project organizations in that differences in implementing procedures have been eliminated.

- Anoendix A 1

Added Gas Turbine Fuel to reflect this emergency power source at Millstone Unit l

l o

No.1.

Apoendix C Update procedure List to reflect current revisions within the various o

j departments, i

l i

c a

V "...

Annendiv D j

j

-o Deleted Regulatory Guide 1.74. This was cancelled by the NRC letter dated i

September 1,1989.

I N

o Expanded the commitment to Regulatory Guide 1.152 to apply to all four units.

i Anoendix E i

o Defmitions revised to provide consistency with ANSI definitions and/or NU

')

usage.

]

Apoendix F o

Added exception to ANSI N45.2.131976 that establishes NU as determining the i

required Post Installation Test requirements and acceptance documentation.

o Added exception to ANSI 45.2.21977 that establishes the Northeast Utilities i

Quality Service Organization to verify, through Inspections, Receipt Inspections, and Survey activities compliance to ANSI 45.2.21977 requirements, j

k i

6 i

W i

i.

e

?

4

/

d..