Forwards Rev 3 to Updated FSAR for Millstone Unit 3
ML20055D960
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/29/1990
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20055D961 List:
References
B13545, NUDOCS 9007100196
Download: ML20055D960 (2)


Text

h,

  • N O- ,

^

General Offic:s e Selden Street, BAtlin. Connecticut' f

y. .ismusue mma,eemect" P,0. BOX 270 ~ . .!
    • "*"C"'""*"" '

HARTFORD. CONNECTICUT 061410270 L U J ". 7.""[,"O,E } (203) 665-5000 l-L , June 29, 1990 Docket No.;50-423 s B1354i  :

)

Re: ~10CFR50.71(e) g 1 U.S. Nuclear Regulatory Commission

. Attention: Document Control Desk <

Washington, DC 20555 Gentlemen:-

Millstone Nuclear Power Station, Unit No. 3 Revisioni3 to the Vodated Final' Safety Analysis Report j

q In 1987,ll) Northeast Nuclear Energy Company -(NNECO) submitted the initial l updated Final Safety Analysis Report (FSAR) for Millstone Unit No. 3 'since.

rec.eipt: of- the ' Operating: License in fulfillment. of the requirements of-10CFR50.71(e).- This rule further, requires that subsequent revisions.'of' the FSAR shall be' filed no less - frequently than annually, and sha changestup to a max.imum six months prior to the date of filing.(1)) reflect all

. i

[: . _ . lPursuantto10CFR50.71(e)(4),asAttachment1,NNEC0herebypresentstheStaff L!

HW :with Revision 3 to>the updated FSAR. This revision is provided in the form of

?' replacemente pages - as required- by 10CFR50.71(e)(1) and (5)., This revision ,

e ,

. presents changes completed since our previous submittal necessary to reflect.

9T +- informationJand ' analyses = submitted to the Commission or prepared. pursuant to E Comission , requirements as of December 31, 1989. Pursuant / to 10CFR50.71(e)

,; and-10CFR50.4(b)(6),.this transmittal consists of one original and ten copies. 3 a

p M,S It is noted that 10CFR50.71(e)(2)(ii) stipulates "This submittal shall include-

'FG an identification of changes made under the provisions of Section 50.59 but =

j not previously. submitted to the Commission." Pursuant to -Section 50.59(b),-  !

Si o 3% '

'i i

d'

~

(1)- E. J. Mroczka letter to U.S. Nuclear Regulatory Commission, " Millstone

-Nuclear Power Station, Unit No. 3, Transmittal of the November 1987

l Update to the Final Safety Analysis Report (FSAR)', dated November'24,

~

E g 1987.

(2). To meet the annual submittal requirement, NNEC0 will provide an FSAR -l L revision by June 30 of each year. Hoviever, for internal scheduling j L purposes and continuity and other annual reporting requirements, NNECO j L may provide the FSAR revision one to several months in advance of the 1

- annual due date.

_ osam nev.4 se s 9007100196 900429 PDR- ADOCK 05000423 t%

\

K- PDC

]

^^ ^"

y . . o.

-U.S. Nuclear Regulatory Commission .

B13545/Page 2-June 29, 1990 such information is- routinely submitted to the NRC as- part of our annual reports and is not included in this submittal. ,

The most recent annual report was submitted on February 21, 1990,(3) for the ,

period January 1, 1989 through December 31, 1989.

We trust that this information satisfies the requirements of 10CFR50.71(e).

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY h

E. J. y 6zka ,f Senior Vice President cc: T. T. Martin, Region I Administrator D. H. Jaffe, NRC Project Manager, Millstone Unit Nc. 3 W. J. Raymond, Senior Resident Inspector, Millstone Unit Nos.1, 2, and 3 ,

. STATE OF CONNECTICUT)

) ss. Berlin COUNTY OF llARTFORD )

Then personally appeared before me, E. J. Mroczka, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, a Licensee herein, that he is authorized to execute and file the- foregoing information in the name and on behalf of the Licensee herein, and that the statements contained in said information are true and correct to the best of his knowledge and belief,  !

Y mib htnd/

JNotary lic MyComm!! son Egires March 31,1993

+

o (3) E. J. Mroczka letter to U.S. Nuclear Regulatory Commission, "Haddam Neck l Pl ant , Millstone Nuclear Power Station, unit Nos.1, 2, and 3 Annual l- Report," dated February 21, 1990.

1

+