1
2 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000456/2012004 AND 05000457/2012004 FOR BRAIDWOOD STATION UNITS 1 AND 2
The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012004 and 05000457/2012004. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR
REPORT DETAILS
- 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A510 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 3 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, "Standardized Radiological Emergency Plan," Revision 21 EP-AA-112, "Emergency Response Organization (ERO) Emergency Response Facility (ERF) Activation and Operation," Revision 16
4 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 456/2012004 AND 05000 457/2012004 FOR BRAIDWOOD STATION UNITS 1 AND 2
The following is a feeder for integration into the Braidwood Station Inspection Report No s. 05000 456/2012 0 04 and 05000 457/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 2. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A510 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 5 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, "Standardized Radiological Emergency Plan," Revision 21 EP-AA-112, "Emergency Response Organization (ERO) Emergency Response Facility (ERF) Activation and Operation," Revision 16
6 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 461/2012004 FOR CLINTON POWER STATION UNIT 1
The following is a feeder for integration into the Clinton Power Station Inspection Report No. 05000 461/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 3. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 7 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, "Standardized Radiological Emergency Plan," Revision 21 EP-AA-112, "Emergency Response Organization (ERO) Emergency Response Facility (ERF) Activation and Operation," Revision 16
8 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 237/2012004 AND 05000 249/2012004 FOR DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3
The following is a feeder for integration into the Dresden Nuclear Power Station Inspection Report No s. 05000 237/2012 0 0 4 and 05000 249/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 4. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 9 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, "Standardized Radiological Emergency Plan," Revision 21 EP-AA-112, "Emergency Response Organization (ERO) Emergency Response Facility (ERF) Activation and Operation," Revision 16
10 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 373/2012004 AND 05000 374/2012004 FOR LASALLE COUNTY STATION UNITS 1 AND 2
The following is a feeder for integration into the LaSalle County Station Inspection Report No s. 05000 373/2012 0 04 and 05000 374/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were id entified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 5. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 11 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, "Standardized Radiological Emergency Plan," Revision 21 EP-AA-112, "Emergency Response Organization (ERO) Emergency Response Facility (ERF) Activation and Operation," Revision 1 6
12 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 263/2012004 FOR MONTICELLO NUCLEAR GENERATING PLANT
The following is a feeder for integration into the Monticello Nuclear Generating Plant Inspection Report No. 05000 263/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 6. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850657 and ML12205A056 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
Th e NRC review was not documented in a safety evaluation report and did not constitute 13 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes Emergency Plan, Revision 37 A.2-101, "Classification of Emergencies," Revision 46 A.2-110, "Response to a Security Threat," Revisions 9 and 10 A.2-213, "Responsibilities of the Emergency Director," Revision 25 A.2-501, "Communications During an Emergency," Revision 2 4 A.2-803, "Emergency Communications at the EOF," Revision 13
14 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 255/2012004 FOR PALISADES NUCLEAR PLANT
The following is a feeder for integration into the Palisades Nuclear Plant Inspection Report No. 05000 255/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 7. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12202A061 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
15 b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes
EI-1, "Emergency Classification and Actions," Revision 55 EI-4.3, "Emergency Operations Facility Activation," Revision 26
16 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 440/2012004 FOR PERRY NUCLEAR POWER PLANT
The following is a feeder for integration into the Perry Nuclear Power Plant Inspection Report No. 05000 440/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 8. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12152A268 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
17 b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None. LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes
Emergency Plan, Revision 35
18 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 282/2012004 AND 05000 306/2012004 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2
The following is a feeder for integration into the Prairie Island Nuclear Generating Plant Inspection Report No
- s. 05000 282/2012 0 04 and 05000 306/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 9. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML121850150 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 19 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes F3-2, "Classification of Emergencies," Revision 43 F3-6, "Activation and Operation of Technical Support Center," Revision 25 F8-3, "Activation and Operation of the EOF," Revision 12 Emergency Plan, Revision 46
20 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000 254/2012004 AND 05000 265/2012004 FOR QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2
The following is a feeder for integration into the Quad Cities Nuclear Power Station Inspection Report No s. 05000 254/2012 0 0 4 and 05000 265/2012 0 0 4. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 3 rd Quarter Calendar Year 2012.
This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
- 10. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
- a. Inspection Scope
The NSIR headquarters staff performed an in
-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession number ML12192A512 as listed in the Attachment.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision s resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
The NRC review was not documented in a safety evaluation report and did not constitute 21 approval of licensee
-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
- b. Findings No findings were identified.
ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel
N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
None.
LIST OF DOCUMENTS REVIEWED
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-1000, "Standardized Radiological Emergency Plan," Revision 21 EP-AA-112, "Emergency Response Organization (ERO) Emergency Response Facility (ERF) Activation and Operation," Revision 16