0 INDIANA 5 MICHIGAN POWER COMPANY P.O.BOX 18 BO WL I KG G R E EK STAT ION NEW YORK, N.f.10004 October 15, 1979 AEP:NRC:00277 Donald C.Cook Nuclear Plant Unit Nos.1 and 2 , Docket Nos.50-3'i5 and 50-316 License Nos;DPR-58 and DPR-74 Additional Information in Response to IE Bulletin 79-01 Mr.J.G.Keppler, Regional Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforce1l.nt Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr.Keppler:
This letter and its attachments supply the information requested in Mr.R.F.Heishman's letter dated September 19, 1979 which we received on September 26, 1979.This information was requested in connection with the NRC Staff review of our submittal AEP:NRC:00153 dated June 28, 1979 in response to IE Bulletin 79-01.In a telephone conversation with Mr.J.I.Castresana of our staff on October 9, 1979, a member of your staff agreed to an extension until October 19, 1979 for'the submittal of this response.RESPONSE TO ITEM NO.1 The information requested in Item No.1 is supplied in tabular form as Attachment B.The first column of.the Attachment B table lists the item number as given in Attachment A, which itself is a revision to Attachment A of the AEP:NRC:00153 submittal.
Attachment A was revised to: Assign, to the equipment described, item numbers for the purpose of cross-indexing Attachments A and B;.Supply the information requested in Item 5 of the enclosure to Mr.Heishman's,letter;
, Delete equipment items 23 and 46 because Foxboro instruments
" in containment are no longer required for either Engineered Safety Features actuation or long-term monitoring; It Modify the specified radiation dose for equipment items 24 and 51 to be consistent with the time requirement of FSAR Table 7.5-2;A@K g78 QGWL'.)og5o 9m~
,e Mr.J.G.Keppler, Ditor-2-l:NRC:00277 Modify the specified radi ati on dose for equi pment item 32 to be consistent with that for item 3;Correct the mi ss pel 1 i ng of a suppl i er'name i n equipment items 57 and 58;Modify i nformati on given for equi pment i tems 57 and 58 to make it consistent with statements i n the r eferenced test report;Corr ect a typographi cal error i n the specified rad i ati on dose for equipment item 59;I Modify the specified radiation dose for equipment items 60 and 62 to correspond with the more conservative calculation reported in Reference 30.The dose originally listed was from an earlier report which gave a calculated dose for one month only.These changes are essentially merely editorial in nature or.made to preserve consistency with previously submitted information.
Our con-clusion remains valid that all the equipment listed in Attachments A and B is adequately qualified to perform its safety-related functions.
RESPONSE TO ITEM NO.2 The methodology used to verify that the equipment items described.
in our response are, in fact, installed in the Donald C.Cook Nuclear Plant and are the same as the items for which qualification data exists, is based on a comprehensive equipment identification and control program that was and is used throughout the engineering, design, procurement, installation and checkout of the plant.This program provides for the assignment of a unique identification number (plant equipment number)to each item during the design phase.This identification is shown on design drawings, procurement documents, the items themselves when shipped from the vendor, receipt inspection documents, material issue records, installation inspection records and checkout and test records.gualification documentation is checked to verify that the qualifi-cation does meet requirements set forth in the engineering specifications for the item, and that the qualification is applicable to the item furnished.
Verification that the item called out in design drawings was, in fact.installed is obtained by two independent sets of inspections.
The first are the gC inspections conducted during the installation phase to verify conformance to design documents.
The second are the inspections conducted prior to and during the checkout and test phase again to verify conformance to design documents and equipment operability.
~;.Mr.J.G.Keppler, Di)or w3w NRC:00277 The list of items contained in our response was developed utilizing verified design documents and installation inspection records.During the preparation of responses to earlier NRC requests, we have performed additional in-plant inspections on certain items to verify their existence and the acceptability of qualification docu-mentation.
In each case, no non-conformances were found.RESPONSE TO ITEM NO.3 The limit switches which provide position indication of the air-operated safety-related valves inside containment are not needed to activate any Engineered Safety Features or for long-term post-accident nonitoring.
For this reason, these limit switches are not considered part of the safeguards systems and have not been subjected to environ-mental testing.The limit switches for the air-operated containment isolation valves inside the containment are Namco Controls Models D2400 and SL4.Neither of these models was identified in IE Bulletins 78-04 or 79-01.The Plant equipment numbers for these valves are VCR-ll, 21, 101, 102, 103, 104, 105, 106 and 107.Limit switches for safety-related motor-operated valves inside the containment are part of the valve operators and are qualified under the same test r epor ts as the motors and valve operators themselves
.No separate model or equipment numbers are assigned to these limit switches.The test reports were identified in the AEP:NRC:00153 submittal.
RESPONSE TO ITEM NO.4.We have responded to IE Bulletin 79-01A in our submittal AEP:NRC:00153A dated September 7, 1979.RESPONSE TO ITEM NO.5 Attachment A to this letter is a revision to Attachment A to the AEP:NRC:00153 submittal.
This revision includes the replacement of the phrase"long term" in each case with a specific post-accident time period during which the equipment described is assumed to be needed for operation with respect to its safety-related function.The time period information shown does not necessarily reflect the accident scenario timing but was specified according to the additional consideration that cables, ter-minations, splices and similar components should not be the limiting devices in the operation of safety-related circuits.Very truly yours, FNB:em attachments cc: (attached)
F.N.Bien Vice President
~.'r.J.G.Keppler, Director-4-AE.FIRC:00277 cc: Norman C.Noseley-NRC R.C.Callen G.Charnoff D.V.Shaller-Bridgman R.S.Hunter R.W.Jurgensen DONALD C.COOK NUCLEAR PLANT UNITS NO.1&2 ATTACHl'IENT A AEP:NRC:00277 PLANT NAME c ENVIRONMENT (LOCATION)
I'TEM EQUIPMENT DESCRIPTION TIME REQ'o PARAMETER SPECe QUAL, QUAL'ETllODi DOCi REFi~REMARKS 2 Electrical Pe etvations 1 Year Year l Year l Year Temp.(oF)Press.(psia)Rel.Hum.Radiation'a Chem.Temp.(oF)Press,(psia)
Rcl;Hum;.Radiation Hr>Chem.'Temp.{oF)Press.(psia)Rel.Hum.Radiation Chem.Tempo (OF)Press.(psia)Rcl.Hum.Radiation (i(r a Chem.2()0 l00!{)0 2000.o no P{>0 100 t)o 2000oo~al3
- ?()0 gC.100")1'0 ,".000 an
- !9 2{'>0 s5.5 l00 j'150 2000 ppmB 122 OP 100'v l00>40 l00'00..i>)>f>'s>E 127 7 100$,".00 C'I 84O 116 l00'>1.00"0nP)>)>',!!
B L>e 0.1'<lt e ac3.(SC<ll ilto Si!'!Ul o i)3.lll)ll e 1,3~~This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment whore morc than one applies.~Use ANAL>TEST.SEQ.>SIMUL.>ONGOING, or OTl!ER for entries into this space, ATTACllHENT A SHEET 1 OF 19 PLhNT NhHEI ITEM EQUIPMENT DESCRIPTION TIME REQ'Do ENVIRONMENT (LOCATION)
SPEC, QUAL'UAL'ETIIOD+
DOC REF~*'EMARKS ogre C.ble-Ke ite Co.Temp.(oF);)C)0')')5 Qn(.~16 month Control Cable-Continental Uire 1 Year Press.(psia)Rel.IIum.35.5 3.00'hem.;)OOOPP.!13 Temp (oF)260 Radiation (~.tr.I)12p C)7 lOO;!lP.O of):j Dl~()')I.5 ue(r~exposure to accident environment 6 Cable Co..Instrument Cable-Havrhem Cor.Y(ar 1 Year Press.(psia)
Bol;IIum: Chem.Temp.(oF)Press.(psia)Rel.IIum.Radiation (.<>>Chem.Temp.(oF)Press.(psia)Rel.Hum.35 100 j~20')0 pp!ao PRO OOOO tnnB 35 5 100g~Tl?il 3.(~1.7 1.001m'50 3.21.1.50 ppu!'57 OII..7 100 j~Se(.~uimU1 n Radiation (I.(ra.,)1 50 Chem.200 This list is a compilation of items by component.
Da not list the same type of component more than once.Use limiting environment where more than one applies.Use ANM., TEST, SEQ.>SIMUL.>ONGOING, or OTIIER for entries into this space.ATTACIIMENT A SIIEET 2 OF 19
.PLANT N@gald C~Cook Nuclear Plant Unit 1 ENVIRONMENT (LOCATION)
ITEM EQUIPMENT DESCRIPTION TIME REQo D PARAMETER SPEC, QUAL, QUAL'ETHOD~
DOC REF~*'4 16 i etio (er to<tran(led H 1o Po>rer Cable'Eerminatio at motors and'll dro.'en Becombiner Control Cable'Eerminations-Solid Ka ton S 19.c.ct to Stranded Kapton is.1 Year is 1 Year 1 Year 1 Year Temp.(oF)Press.(psia)Rel.Hum.Radiation (~t., Chem.Temp.(oF)Pres.(psia)Rcl;Ilurn;Radiation (H>., Chem.Temp.(oF)Press.(psia)Rcl.Hum.Radiation Chem.Temp.(oF)Press.(psia)Rcl..Hum.260 1)()0 not.ro~.'d 260 35.5 100;"o')1.50"..000 ppm.'3 35~5 40 1.00,'i 1(0 c'g ppln n r 3>>O 1.00'p'n 1 h I 34.0 100/~0 2500 ppmD 345 Sogf Sc~!~Radiation(wra,, Chem.()0 rlt'i'o($'i'(1 150-25 PPgm18 This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment where more than one applies.~Usc ANAL'EST, SEQ.~SIMUL.>ONGOING, or OTHER for entries into this space.ATTACHMENT A SHEET 4 OF lg 0
PLANT NAMEi ENVIRONMENT (LOCATION)
ITEM EQUIPMENT DESCRIPTION TIME REQ'D.'ARAMETER SPECo QUAL~QUAL, METHOD*DOCi REF>+'EMARKS 17 Control Cable Terminations-Stranded Ka ton s 1.iced I[a1.on l.Year Temp.(oF)Press.(psia)
Bel.Hum.Radiation~i.Chem.~60 not.ro~!cl 340 120 1.00,".)1 fj0 2y()g y.;>Senarate 1'j, 8 18 Control Cable at terminal boxes j Terminations-1 Year Temp.(oF)Press.(psia)
Rel.'um;.Radiation.
)(Chem.Temp.(oF)Press.(psia)Rel.Hum.35 5 100 p~i 345 84.7 Gonarate l3t, 5 RadlatLOQ graf~)1$0 150 1 Year Chem.Temp, (oF)Press.(psia);?000 pomO 345 n)ppm Rol.Hum.Radiation (I%i~(: Chem.OOOO nn>>H 1.00'u 150 2 50(2>)gl,"p This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment whore moro than one applies.Use ANALi TEST i SEQ~SIMUL p ONGOING i or OTHER for entries into this space.ATTACHMENT A SHEET 5 OF19
)PLANT NAME>PARAMETER SPEC>>QUAL>>METHOD'~DOC>>REF>*'EMARKS 20 21.1 ear 1 Year.Temp.{oF Press.(psia)
Rel.Hum.Rad1a tiog~ira('I}Chem.Temp>>{oF)Press.(psia)
Rel;Hum'..1 00/4 345 ni 150 100'>>14 8 10 11 12 22 (Deleted)1 Year (Deleted Radiation (I,;r~Chem~'Temp.(oF)Press.(psia)Rel.Hum.Radiation (I jy~Chem.Temp.(oF)Press.(psia)Rel.Hum.RadiatioyI r.<.Chem.I}60 (Q\}'60 9000 nmB'Deleted)1/0'-OQ ppmB 150 2500 pp.",sD (Deleted This list is a compilation of items hy component.
Do not list the same type of component more than once.Use limiting environment vhere moro than one applies.~Use ANAL, TEST, SEQ.>>SIMUL.)ONGOING, or OTHER for entries into this space, ATTACHMENT A SHEET OF 19 I~~.~~~~L-.'~~'~~I~~I a~II.~~I~~~j~g~I C~~~~~~~~~0~~I~II~~~~~I~~~~~~~~~'~~~k~~~~~~
PLANT NAME>Donald C.Cook Nuclear P1ant U it 1.ENVIRONMENT (LOCATION)
EQUIPMENT DESCRIPTION TIME REQ'O.PARAMETER SPEC, QUAL, QUAL, METHOD~DOCi REF>*'ru V.ve o IIO o s-SIIB-and motor contr cable terminations Limitorr ue Valve 0 erator Iiotors SIR-1 SIQ-2 and motor control cable termina-tions 1 da 1 dav Temp.,(oF)
Press.(psia)
Rel.Hum.Radiation (-I>Chem.Temp.(oF)Press.(psia)
Rcl;Hum;;Radiation Chem..".60 3.00'v i.)".6"000 n.n 13 PGO 100"i 1.-)2~')",000 zamB<np-p-,i'np>>)0 1 1/07 100'~2600 ppm n Sen.Sc ilrat 8 22 16 Temp.(oF)Press.(p'ia)Rel.Hu)n.Radiation Chem.Temp (oF)Press.(psia)Rel.Hum.Radiation Chem.This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment where more than one applies.~Usu ANAL<TEST, SEQ.)SIMUL.p ONGOING, or OTHER for entries into this space.gl 4 ATTACHMENT A SHEET 8 OF l I pr.awe Nanei Dbnald C.Cook Nuclear Plant Unit 2..ENVIRONMENT (LOCATION)
ITEM EQUIPMENT DESCRIPTION Ki h Volta e Electrical Penetrations TIME REQt D 1 Year PMUQKTER Temp (oF)Press.(psia)Rel.Hum.SPECe 328.2 29.1 100~QUALe 346.100K QUALe METHOD*Se arate DOC REF~*Electrical Penetrations 1 ear Radiation(grad Chem.60 2000 ppn B 100 0 lca 1 Separate 1 3 Temp (oF)Press.(psia)
Rel;Hum;328.2 29.1 100K 340 116 100K Power Cable-Rad i a t ion(fgra d)Chem.60 100 2000 ppm B 2098 ppm B Simul.Anaconda Wire and Cable Power Cable-Kerite Co.6 HOnths Temp.(oF)Press.(p in)Rel.Hum.Radiation(firad)Chem.Temp.(oF)Press.(psia)328.2 29.1 100m 150 2000 ppm B 328.2 29.1 340 119.7 lOOX 200 00pmB 325 96.7 Seq.'6 month exposure in accident Rcl.Hum.Radiation()trad)
Chem.100~120t 200.0 ppii;.8, 100K 120 pram environment This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment where more than one applies.i Use ANALP TESTP SEQ., SIMUL.)ONGOING, or OTHER for entries into this space.ATTACHMENT A SHEET~OF~
P?JQft NANEt Oonald C.Cook Nuclear Plant Unit.2 ENVIRONMENT (LOCATION)
'ITEM 34 EQUIPMENT DESCRIPTION Power Cable-Essex Internati'onal TIME REQ'Di I year PARAMETER Temp, (oF Press.(psia)
Rel.Hum.SPECi 328.2 29.1 100ÃQUAL, 346.127.7 100K QUALi METHOD+Simul.DOC REF~*'5 REMARKS Radiation(Hrad 150 200 35 Control Cable-Continental Wire and Cable Company 1 year Chem.Temp (oF)Press.(psia)
Rel;Hum;-2000 ppm B 328.2 29.1 100%H 9-PII7 345 121.7 l 00'X Seq.Radia tion((frad 1 50 150 36 Instrument Cable-1 ear Chem.2000 ppm 0 IIP[0 Simul.Raychem Corp.Temp.(oF)Press.(paia)Rel.Hum.328.2 29.1 100K 357 84.7 100K Itadiation(grad 150 200 37 Instrument Cable-Samuel tloore 5 Co.1 year Chem.Tempi (oF)Press.(psia)Rol.Hum.2000 ppm B 328.2 29.1 100K nH 9.-11 340 119.7 100/i Separate 10,11 Radiation Hrad 150 200 Chem.2000 ppm.B p 0"(!This liat is a compilation of items by component.
Do not list the same type of component:
more than once.Use llmi.ting environment where moro than one applies.i Usu ANAL>TEST>SEQ.p SIMUL.p ONGOING>or OTHER for entries into this space.ATTACIINHNT A SHEET 10 OF 19 0
ar P nt Unit 2 ENVIRONMENT (LOCATION)
ITEM EQUIPMENT DESCRIPTION Instrument Cable-Cerro Wire and Cable Co.TIME REQ'o 1 year PARAMETER Temp (op Press.(psia)
Rel.Hum.Radiation tedllad Chem.SPEC, 328.2 29.1 lOOX 50 2000 pptR B QUAL+346 127.7 100K 200 QUAL'ETHOD~
Seq.DOC, REP~~'2 39 Power Cable Terminations-Solid Kapton Spliced to Stranded Kapton 40 Power Cable Terminations-Stranded Kapton Spliced to, Stranded Hypalon 41 Power Cable Terminations.-
At flotors and Hydrogen Recombiner 1 year 1 year 1 year Temp.(oF)Press.(psia)
Rel:.Hum;Radia tion(tetrad Chem.Temp.(oF)Press.(psia)Rel.Hum.Radiatio Yirad Chem.Temp.(oF)Press.(psia)Rel.Hum.328.2 29.1 100Ã60 Not Req'd 328.2 29.1 100K~60 Not Req'd 250 29.1 100K 340 118 100K 60 tpm-340 118 100K 150)l 9.340 118 100K Seq.Se.Seq.13 13 13 Radiatior(Hrad) 150~150 Chem.2000 ppm B This list is a compilation of items by component.
Do not list the same type of component more than once.Use limitinq environment where more than one applies.~Use ANAL, TEST, SEQ.i SIMUL.p ONGOINGi or OTHER for entries into this space.~l~I ATTAC(jMENT A SHEErll OZ l9 PLANT NAME!ENVIRONMENT (LOCATION)
~ITEM EQUIPMENT DESCRIPTION TIME BEQ'o PARAMETER SPEC+QUAL+QUAL, METllOD*DOCi REF~~'ontrol Cable Terminations-1 Year Solid Kapton Spliced to Stranded Kapton Temp (oF Press.(psia)
Bel.Hum.Radiation(Iirad Chem.328.2 29.1 100K 60 Not Req'd 340.118 100K 60 Se.13 Control Cable Terminations-1 Year Stranded Kapton Spliced'to Solid XLpolyethylene Control Cable Terminations-1 Year Temp.(oF)Press.(psia)
Bel..Hum;Radiation(tlrad Chem.328.2 29.1 100K 60 Not Req'd 345 84.7 lOOX 150 A 9-10 Se arate 14 8 Se arate 15 8 Stranded Kapton Spliced to Stranded EPR-Hypalon Temp.(oF)Press.(psia)Bel.Hum.Radiation(flrad Chem.328.2 29.1 100K 60 Not Req'd 340 120 100K 150@70 Temp.(oF)Pxess.(psia)Bel.Hum.Radiation t1rad Chem.This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment where more than one applies.ANAL t TESTe SEQ i SIMVL y ONGOING'r OTHER for entries into this space.ATTACllMENT A SHEET12 OF19 Pacer NAME<Donald C.Cook Nuclear Plant Unit 2 ENVIRONMENT (LOCATION) l~ITEM EQUIPMENT DESCRIPTION Control Cable Terminations-At Terminal Boxes TIME REQ'o Ye r PARAMETER Temp.(oF)Press.(psia)
Rcl.Hum.Radiation(Hrad Chem.SPEC+328.2 29.1 100$150 2000 ppm B QUAL+345 84.7 100l 150 pH QUAL, METHODS DOCo REF!*Separate-14 8 (Deleted'Instrument Cable (d el e ted)1 Year (Deleted)Temp.(oF)Pross.(psia)
Rcl.Hum;Ra@lotion(Nrad Chem.(Deleted)Se arate 8i9il0illi 12il4 Terminations-Barton Instrument Connections Instrument Cable Terminations-RTO Connections 1Yar Temp.(oF)press.(psia)Rcl.Hum.Rodiatio Yirad Chem.Temp.(oF)Pres.(psia)Rcl.Hum.Radiatio t1rad Chem.328.2 29.1 100K 150 2000 ppm B 328.2 29.1 100'1o 150 2000 ppm-B 345 84.7 100".o 150 50 nnm)I 1 0.5'45 84.7 100Ã150 500 p i H 9.f-'io.Separate 8 9 t 10 p ll t 12 t This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment
+here moro than one applies.i Uso ANAL, TEST, SEQ.i SIMUL.~ONGOING, or OTHER for entries into this space.ATTACHMENT A SHEET~OF 19 PLANT Nues Donald C.Cook Nuclear Plant Unit 2 ENVIRONMENT (LOCATION)
~ITEM EQUIPMENT DESCRIPTION Instrument Cable Terminations-At Electrical Penetrations TIME REQ'Do 1 Year PMUi1METER Temp.(oF Press.(psia)
SPEC.328.2 29.1 QUAL, 340 118 QUAL, METHOD~Seq.DOC, REF JI 13 REMARKS 0 Instrument Cable Terminations-
.Splices to Electrical Penetrations 1 Year Rcl.Hum.Radiatior{Mrad Chem.Temp.(oF)Press.(psia)
Rcl;Hum;100X 60 Not Req'd 328.2 29.1 100X 100X 150)l 3.5 340 84.7 100X Se arate Raaiatio Mrad)60 Hydrogen Recombiners 2 Fan Motors l<onths 1 Year Chem.Temp.(oF)Press.(psia)Rcl.Hum.RaQiatior(Mrad
)Chem.Temp.(oF)2000 ppm B 250 29.1 100@Not Req'd 250 H 40)'0 310 77 100X 200 pI1 320 Separate Seq.20 21 Press.(psia).: 29 1 89.7 Rcl..Hum.100X 100X Radiatio Mrad 150 200 Chem.Not.Req'd..This list is a compilation of items by component.
no not list the same type of component more than once.Uso limiting environment whore moro than one applies.i Uso ANAL>TEST, SEQ., SIMUL.~ONGOING, or OTHER for entrios into this space.ATTACllHENT A SHEET 140F 19 PLANT NAMEq Donald C.Cook Nuclear Plant Unit 2..ENVIRONMENT (LOCATION)
ITEM EQUIPMENT DESCRIPTION Limi torque Val ve Operator Hotors-SMB-00 and motor contro cable terminations Limitor ue Valve Operator Hotors-%MB-000 and motor contro cable terminations Limitor ue Valve Operator Motor's-SMB-land motor control cable terminations TIME REQe D 28 sec.10 min.1 da PARAMETER Temp.(oF)Press.(psia)
Rel.Hum.Radiation Chem.Temp.(oF)Press.(psia)
Rel.'.Itum;Radia tio Hrad Chem.Temp.(oF)Press.(psia)Rel.Hum.Radiation Hrad Chem.SPEC+328.2 29.1 100/o 2000 ppm B 250 29.1 100K 3.9 Not Req'd 250 29.1 100K 26 2000 ppm B QUAL,=330 104.7 100K 250 39.7 100 jJ 204 Not Req'd 315 84.7 100K 204 19 QUAL, METHOD*Simul..Se.Seq.DOC REF~*'2 24 16 56 Limitor ue 1 day Separate 23 22 Valve Operator Motors-.SI'$-1, SMB-2 and motor control cable terminat'ons Temp.(oF)Press.(psia)Rol.Hum.Radiation ra Chem.328.2 29.1 100K 2000 pp01.B 340 119.7~100K 204 2622 ppm This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment where more than one applies.i Uso ANAL, TEST, SEQ.)SIMUL.)ONGOING, or OTHER for entries into this space.ATTACIIHENT A SHEET 15OF 19 I I'I~I~~I~~I I~~-~~~~~~~~I~I~'~~4~I~~~I~~~~~~~~I e~~~I~~~I~'~~~~~~~~~~~~~~~~
PLANT NAME l DONALD C e COOK NUCLEAR PLA2 ITEM EQUIPMENT DESCRIPTION TIME REQ'>>ENVIRONMENT (MCATION)SPEC, QUAL'UAL~METtton~DOC REF t*'9 ITT Barton Pressure and Differential Pressure Transmitters Models 763 f'64 hor Term Temp.(oF)Press.(psia)
Rel.ltum.Radiatio Mrad 29.1 100%.07 89.7 14.4 100~0'k 2.5 per 50 l>our SF.SEP 30 60 ITT Barton Pressure and Chem.1.14't boric acid 1.14'L boric acid/0.15'-NaOU nom.17';NaOlf LOCA Differential Pressure Transmitters Models 763 f*764 Temp.(oF)4 months Press.(psia)
Rol;llum:.Radia t ion(160 14.4 100%40 320 89.7 1001 50 SEQ.30 61 Pressure and Short 1.14t boric acid.15%NaOll{nom), MSLB Unit 1 Unit 2 1.14 a borne acid.17'4 NaOH Differential Pressure Term Temp.(oF)260 328.2 360 SE 30 Transmitters (1 sec)Press.(psia)35 5/29 8<).7 Models 763&764 Rcl.llum.Radiatiog<
100't/100%
.04/.04 100%50 Chem.1.14>>boric acid.154 aOh nom 1.14 a boric acid=.17L NaOH ITT Barton Pressure and'ifferential Pressure Transmitters Models 763 f;764 4 months MSLB Tempo (OF)Rel.Hum.Radiation(M Unit 1 Unit 2 2'60 328.2"35 5/29 1'00'h/100'h r 6/4.6 360 89.7 100%50 SE 30 Chem, 1.14'f'boric acid~15'f Nanll no)'.14 a boric acid.17'L NaOff This list is a compilation of items by component.
Do not list the same type of component more than once.Use limiting environment where moro than one applies.Use ANM, TESTi SEQ., SIMUL., ONGOING, or OTIIL'R for entries into this sPace.AITACttAENT A SHEET~F~9 Document References Cited In Attachment A 20 3~50 6.7~8.9.10.11.12.13.15.16.19.20.Conax Corp.Test Report IPS-234 Conax Corp.Test Report IPS-62.Conax Corp.Test Report IPS-137.Conax Corp.Analysis Report IPS-324.FIRL Test Report F-C3341.FIRL Test Report F-C3694..Kerite Co.Test Report 75IPCEA-27-P.
Conax Corp.Test Report IPS-348.FIHL Test Report F-C4033-1.
FIRL Test Report F-C3683.Isomedix Corp.Test Report of May, 1976.Cerro Wire and Cable Test Report of May, 1976.Westinghouse-Canada Test Report CWAPD-332.
FIRL Test Report F-C4033-3.
Westinghouse-Canada Test Report CWAPD-326.
Limitorque Corp.Test Lab.Project$6004.56.Conax Corp.Test Report IPS-326.Conax Corp.Test Report IPS-327.Conax Corp.Test Report IPS-329.Westinghouse Corp.Test Report WCAP-7709-L, Suppl.2..21.Westinghouse Corp.Test Report WCAP-7829.
22~23~25.26.27 0 28.29.30 Limitorque Corp.Test Report$600198.Limitorque Corp.Test Report$600376A.Limitorque Corp.Test Report$600461.'somedix Corp.Test Report of Nov.1975.Foxboro Test Report TE-1013.Westinghouse Electric Westinghouse Electric Corp.Communication NS-PLC-5023 dated 4/26/78 from T.M.Anderson-Westinghouse to Z.G.Case-NRC.Westinghouse Electric Corp.Test Report WCAP-9157 Automatic Switch Co.Report AQS 21678/TR Corp.Communication NS-TMA-)950 Sheet 18 of 19 GENERAL NOTES: 1.In situations where a qualification pressure was not explicitly stated and it was known that the test environment was steam, the saturation pressure of steam at the given test temperature was used.2.All chemical concentrations noted as X are weight L.19'f 19 DONALD C.COOK NUCLEAR PLANT UNITS NO.1 L 2 ATTACHMENT B AEP:NRC:00277
'onald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.S stem s*Component Function Plant Equipment No.Manufacturer Model or T e CONTAINMENT ISOLATION ELECTRICAL HIGH VOLTAGE (4 kv)CONTAINMENT PENE-TRATION 1-1P6, 1-2P5, 1-3P8, 1-4P8 1-1P7, CONAX CORPORATION 1-2P67 1-3P7 1-4P7, EP-1 ALL.ELECTRICAL LOW VOLTAGE (600:V AND.BELOW)CONTAINMENT PENE I RATION l-lPl, 1-1P3, 1-2P2, 1-2P4, 1-3P1, 1-3P6, 1-4P5, 1-4I7, 1-4C3, 1-1C4, 1-1I5, 1-1I6, 1-2I6, 1-2C1, 1-3I6, 1-3C2, l-1P2, 1-1P4, 1-2P3, 1-4P2 1-2P7,1-2PS 1-3P2,1-3P3, 1-4P3,1-4P4, 1-4P6,1-4I5, 1-4I8,1-4C2, 1-4C1,1-4I6, 1-1C1,1-1C3, l-lI8,1-1I7, 1-2I8,1-2I5, 1-2C4,1-2C3, 1-2I7,1-3I8, 1-317,1-3C1, 1-3C4,1-3I5 CONAX CORPORATION EP-2 through EP-13 ALL ALL..ALL ALL*See attached list for key POWER CABLE POWER CABLE POWER CABLE CONTROL CABLE 0 347 8 399 II.3116 8 3092 ANACONDA OKONITE KERITE CONTINENTAL aa ga 3TC II2 AWG CU 1/C f2 AWG CU 3TC 810 AWG CU-Blidigh"'"'age
~of~
Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.S stem s*Component Function Plant Equipment No.Manufacturer Model or T e ALL ALL ALL ALL ALL ALL ALL ALL ALL CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE¹3093¹3119¹3120¹3121¹3122¹3123¹3124¹3125¹3119 CONTINENTAL CONTINENTAL CONTINENTAL CONTINENTAL 7/C¹19/12 AHG STRANDED CU 2/C¹12 AWG SOLID Co 4/C¹12 AWG SOLID CU 7/C¹12 AWG SOLID CU CONTINENTAL CONTINENTAL CONTINENTAL 15/C¹12 AWG SOLID CU 4/C¹7/18 AWG 7/C¹7/18 AHG STRANDED Ctj GENERAL ELECTRIC 2/C¹12 AWG SOLID CO CONTINENTAL 12/C¹12 AWG SOLID CU*See attached list for key Page~of~
Donald C.Cook Nuclear Plant EP:NRC:00153 ubmittal Item No.S stem s*Component Function Plant'quipment No.Manufacturer Model or T e 8 ALL ALL ALL ALL ALL ALL ALL ALL.ALL CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE INSTRUMENT CABLE INSTRUMENT CABLE INSTRUMENT CABLE INSTRUMENT CABLE INSTRUMENT CABLE iO'120 t5'123 8 3O73 0 3O74 8 3O76 I: 3111'3112 GENERAL ELECTRIC GENERAL ELECTRI GENERAL ELECTRI GENERAL ELECTRI RAYCHEM RAYCHEM RAYC HEM RAYCHEM RAYC HEM 4/C g 12 AWG SOLID CU 7/C g 12 AWG SOLID CU 12/C g 12 AWG SOLID CU 15/C PP 12 AWG SOLID CU RG-ll/U TRIAXIAL YELLOW RG-ll/U TRIAXIAL/1IITE RG-ll/U TRIAXIAL Bl ACK RG-ll/U BIAXIAL ORANGE RG-ll/U TRIAXIAL 13LUE*See attached list for key Page~of 18 Oonald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.S stem s*Component Function Plant Equipment No.Manufacturer Model or T e 10 10 12 ALL ALL ALL ALL ALL INSTRUMENT CABLE INSTRUMENT CABLE 8 3O76 0 3O75 INSTRUMENT CABLE g 3077 INSTRUMENT CABLE g 3077 POWER CABLE TER IINATIONS INSTRUMENT CABLE 8 3O75 BOSTON INSULATED Bgl'IE)INSULATED SAMUEL MOORE 5 CO~SAMUEL'OORE
&: CO.CERRO WIRE&: CABLE COo N/A g 16 AWG TSP RG-11/U TRIXIAL gQ6 AWG TSP gl6 AWG TSQ g16 AWG TSQ SOLID KAPTON SPLICED TO STRANDED KAPTON 13"15 ALL ALL ALL POWER CABLE TERMINATIONS POWER CABLE TERMINATIONS AT VALVE MOTORS&:.HYDROGEN BECOMBINERS CONTROL CABLE TERMINATIONS N/A N/A N/A N/A N/A N/A STRANDED KAPTON SPLICED TO STRANDED HYPALON N/A SOLID KAPTON SPLICED TO STRAIIDED KAPTON*See attached list for key Page 4 of 18 Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.S stem s*Component Function Plant Equipment No.Manufacturer Model or T e 16 17 18 19 20 21 22 ALL ALL ALL ALL ALL ALL CONTROL CABLE TERMIHATIONS
.CONTROL CABLE TERMINATIONS CONTROL CABLE TERMINATIONS AT TERMINAL BOXES INSTRUMENT CABLE TERMINATIONS AT BARTON INSTRUMENT INSTRUMENT CABLE TERMINATIONS AT RTDiS INSTRUMENT CABLE TERMINATIONS AT ELECTRICAL PEHETRATIONS INSTRUMENT CABLE SPLICES TO ELECTRICAL PEHETRATIONS N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A STRANDED KAPTON SPLICED TO SOLID XL POLYETIIYLEHE STRANDED KAPTON SPLICED TO STRANDED EPR IIYP ALON N/A N/A N/A N/A N/A*See attached list for key aa~I Page~of 18 Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.S stems*Component Function Plant Equipment No.Manufacturer Model or T e 23 (Deleted)(Deleted)(Deleted)(Deleted)(Deleted)*See attached list for key Page 6 ot Z8 Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.24 25'26 26 26 26 26 27 , 27 S stem s*HYDROGEN RE<<COMBINERS CONTAINMENT AIR RECIRCULATION FAN MOTORS BORON INJECTION BORON INJECTION BORON INJECTION 4 BORON INJECTION CONTAINMENT ISOLATION CONTAINMENT HYDROGEN CON-TROL AND AIR RECIRCULATION CONTAINMENT HYDROGEN CON-TROL AND AIR RECIRCULATION Component Function REDUCE HYDROGEN CONCENTRATION REDUCE HYDROGEN CONCENTRATION AND RECIRCULATE CONTAIN-MENT AIR MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED'VALVE MOTOR OPERATED VALVE MOTOR OPERATED SUCTION DAMPER MOTOR OPERATED SUCTION DAMPER Plant Equipment No.1-HR1, 1-HR2 1-CEQl, 1-CEQ2 IMO-51 IMO-52 IMO-53 IMO-54 QCM-250 VMO-101 VMP;102 Manufacturer WESTINGHOUSE LIMITORQUE L IMITORQUE LIMITORQUE L IMI TORQUE L IMITORQUE L IMITORQUE LIMITORQUE Model or T e PHY2050-1 PHY2050-2 SMB-00 SMB-00 SMB-00 SMB-OQ SMB-00 SMB-000 SMB-000*See attached list for key Page 7 of~]
Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.28 28 28 28 29 29 29 29 29 S stems*SI SI SI SI RHR CONTAINMENT ISOLATION CONTAINhiENT ISOLATION RHR AND CONTAIN-MENT ISOLATION RHR AND CONTAIN-MENT ISOLATION Component Function MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE NOTOP, OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE Plant Equipment No.INO-315 IMO-316 IMO-325 INO-326.INO-128 ICM-129 ICM-111.ICM-305 ICM-306 Manufacturer LINITORQUE L IMITORQUE L IMITORQUE L INITORQUE L INI TORQUE L IM I TORQUE L Ih1ITORQUE LINITORQUE L IMITORQUE Node1 or T e SMB-1 SMB-1 SMB-1 SNB-1 SNB-1 SNB-1 SNB-2 SMB-2 SMB-2*See attached list for key Page 8 of la 0
Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.S stem s*Component Function Plant Equipment No.Manufacturer Model or T e 30 31 CONTAINMENT ISOLATION ALL ELECTRICAL HIGH VOLTAGE (4kV)CONTAINMENT PENETPAT IONS ELECTRICAL LOW VOL-TAGE (600V AND BELOW)CONTAINMENT PENETRAT ION S 2-1P6, 2-2P6, 2-3P8, 2-4P8 2-1P1, 2-1P3, 2-2P2, 2-2P4, 2-2P8, 2-3P3, 2-4P3, 2-4P6, 2-1P7, 2-2P5 2-3P7, 2-4P7, 2-1P2, 2-1P4, 2-2P3, 2-2P7, 2-3P1,2-3P2, 2-3P6,2-4P2, 2-4P4,2-4P5, 2-4C1,2-4C2, CONAX CORPORATION CONAX CORPORATION EP-1 EP-2 through EN3 32 33 34 ALL ALL ALL: POWER CABLE POWER CABLE POWER CABLE 2-1C1,2-1C3, 2-4 I 5>2-4 I 6, 2-4I8,2-1I5, 2-1I8,2-3I8, 2-3I6,2-3I5, 2-2I7,2-2I6, 2-3C4,2-3C2, 2-4C3, 2-1C4, 2-4I7, 2-1I6, 2-3I7, 2-2I8, 2-2I5,¹347¹3116¹3116 2-3C1, 2-2C4,2-2C3, 2-2Cl, 2-1I7 ANACONOA KERITE ESSEX 3TC¹2 AWG CU 3TC¹10 AWG CU 3 TC¹10 AWG CV*See attached list for key Page~of~
Donald C.Cook Nuclear Plant EP:NRC:00l53 Submittal Item No.S stem s+Component Function Plant Equipment No.Manufacturer Model or T e 35 35 35 35 35 35 35 36 36 36 ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL ALL CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE CONTROL CABLE INSTRUMENT CABLE INSTRUMENT CABLE INSTRUMENT CABLE¹3092¹3093¹3119¹3120¹3121¹3122¹3123¹3124¹3125¹3073¹3074¹.3076 CONTINENTAL CONTINENTAL CONTINENTAL CONTINENTAL
'ONTINENTAL CONTINENTAL CONTINENTAL CONTINENTAL CONTINENTAL RAYCHEM RAYCHEM RAYCHEM 4/C¹19/12 AWG STRANDED CU 7/C¹19/12 AWG STRANDED CU 2/C¹12 AWG SOLID CU 4/C¹12 AWG SOLID CU 7/C¹12 AWG SOLID CU 12/C¹12 AWG SOLID CU 15/C¹12 AWG SOLID CU 4/C¹7/18 AWG STRANDED CU 7/C¹7/18 AWG STRANDED CU RG-11/U TRIAXIAL YELLOW RG-11/U TRIAXIAL WHITE RG-11/U TRIAXIAL BLAC*See attached list for key Page]0 of 18 e<<4\~~y~Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.S stem s*Component Function Plant Equipment No.Manufacturer Model or T e 36 36 37 37 38 39 ALL ALL ALL ALL ALL ALL INSTRUMENT CABLE INSTRUMENT CABLE INSTRUMENT CABLE INSTRUMENT CABLE INSTRUMENT CABLE POWER CABLE TERM I NATIONS¹3111¹3112¹3075¹3077¹3O77 N/A.RAYCHEM RAYCHEM RG-11/U TRIAX IAL ORANGE RG-11/U TRIAXIAL BLUE N/A SOLID KAPTON SPLICED TO STRANDED KAPTON SAMUEL MOORE&CO.¹16 AWG TSP SAMUEL MOORE&CO.¹16 AWG TSQ CERRO WIRE&CABLE CO 416 AWG TSQ*See attached list for key Page~of~
Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal It'em No.40 41 42 43 46 S stem s*ALL ALL ALL ALL ALL ALL (Deleted)Component Function POWER CABLE TERMINAT IONS POWER CABLE TERMINATIONS AT VALVE MOTORS AND HYDROGEN RECOMB INERS CONTROL CABLE TERM I NATIONS CONTROL CABLE TERMINATIONS
.CONTROL CABLE TERMINAT IONS CONTROL CABLE TERMI NATIONS'AT TERMINAL BOXES (Deleted)Plant Equipment No.N/A N/A N/A N/A N/A N/A (Deleted)Manufacturer N/A N/A N/A N/A N/A N/A (Deleted)Model or T e STRANDED KAPTON SPLICED TO STRANDED HYPALON N/A SOLID KAPTON SPLICED TO STRANDED KAPTON STRANDED KAPTON SPLICED TO SOLID XL POLYETHYLENE STRANDED KAPTON SPLICED TO STRANDED EPR-HYPALON N/A (Deleted)ALL.INSTRUMENT CABLE TERMINATIONS AT, BARTON INSTRUMENTS N/A N/A N/A*See attached list for key Page 12oflg Donald C.Cook Nuc1ear P1ant EP:NRC:00153 Submittal Item No.48 49 50 51 52 52 S stem s*ALL ALL ALL HYDROGEN RE-COMB INERS CONTAINMENT AIR RECIRCULATION FAN MOTORS CONTAINMENT AIR'ECIRCULATION FAN MOTORS Component Function INSTRUMENT CABLE TERMINAT IONS AT RTD's INSTRUMENT CABLE TERMINATIONS AT ELECTR ICAL PENETRATIO INSTRUMENT CABLE SPLICES TO ELECTRI-CAL PENETRATIONS REDUCE HYDROGEN CONCENTRATION REDUCE HYDROGEN CONCENTRATION AND RECIRCULATE CON-TAINMENT AIR REDUCE HYDROGEN CONCENTRATION AND RECIRCULATE CON-TAINMENT AIR Plant Equipment No.N/A S N/A 2-HRl, 2-HR2 2-CEQl 2-CEQ2 Manufacturer N/A N/A N/A WESTINGHOUSE WESTINGHOUSE WESTINGHOUSE Model or T e N/A N/A N/A PHY2050-1 PHY2050-1 PHY2050-2*See attached list for key P>ge 13o 18 Donald C.Cook Nuclear Plant EP:NRC:00153
'Submittal Item No.S stem s+Component Function Pl ant Equipment No.Manufacturer Model or T e 53 53 53 53~54 54 BORON INJECTION BORON INJECTION BORON INJECTION BORON INJECTION CONTAINMENT ISO-LATION CONTAINMENT HYDROGEN CONTROL AND AIR RECIR-CULATION CONTAINMENT HYDROGEN CONTROL AND AIR RECIR-CULATION MOTOR OPERATED VALVE MOTOR OPERATED VALVE HOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED SUCTION DAMPER MOTOR OPERATED SUCTION DAMPER IMO-51 IMO-52 IMO-53 IMO-54 QCM-250 VMO-101 VHO-102 L IMITORQUE L IMITORQUE L IMI TORQUE L IMITORQUE L IMITORQUE LIMITORQUE L IMITORQUE SM8-00 SHB-00 SMB-00 SMB-00 SMB-00 SMB-000 SMB-000*See attached list for key Page 1<or Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal I te'm No.S stem s~Component'unction Plant Equipment No.Manufacturer Model or T e 55 55 55'5 SI SI SI SI MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE It 10-315 IMO-316 IMO-325 IMO-326 L IMI TORQUE LIMITORQUE LIMI TORQUE L IMITORQUE SMB-1 SMB-1 SMB-1 SMB-1 56 56 56~56 RHR CONTAINMENT ISOLATION CONTAINMENT ISOLATION RHR AND CONTAIN-MENT ISOLATION RHR AND CONTAIN~MENT ISOLATION iOTOR OPERATED~VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE MOTOR OPERATED VALVE IMO-128 ICM-129 ICM-111 ICM-305 IQ1-306 L IMITORQUE L IMITORQUE L IMITORQUE LIMITORQUE L IM ITORQUE SMB-1 SMB-1 SMB-2 SMB-2 SMB-2*See attached list for key PagelS of 18 Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.57 8 58 57 8I 58 S stem s*REACTOR COOLANT REACTOR COOLANT Component Function NARROW RANGE RESISTANCE TEMPERATURE DETECTORS WIDE RANGE TEM-PERATURE DETECTORS Plant Equipment No.NTP-110",*111, 120, 121, 130".*131, 140+141, 21(f," 211, 220." 221, 230, 231, 240, 241 NTR-110, 120, 130, 140, 210, 220, 230, 240 Manufacturer ROSEMOUNT INC.AND H.E.SOSTMAN 5 CO.ROSEMOUNT INC.AND-H.E.SOSTMAN 5.CO.Model or T e 176 KF 118 34 B-176 KS 11901 B 59 59 60 60 REACTOR COOLANT QEN4 GENERATOR REACTOR COOLANT REACTOR COOLANT PRESSURIZER PRESSURE TRANS-MITTERS.,WARROW Rma BVEL TRANSMITTERS WIDE RANGE PRESSURE TRANS-MITTERS PRESSURIZER LEVEL TRANSMITTERS NPP-151, 152, 153g NPS 153 BLP-110, ill, 112, 120, 121, 122, 130, 131, 132, 140, 141, 142 NPS-121, 122 NLP-151, 152, 153 ITT BARTON ITT BARTON ITT BARTON ITT BARTON 763 764 763 764*See attached list for key**In-place spares which perform no function, Pago I6 of IB Donald C.Cook Nuclear Plant EP:NRC:00153 Submittal Item No.60 61 61 61 62 62 62 S stem s*TEQ1 GENERATOR REACTOR COOLANT REACTOR COOLANT MAIN STEAM REACTOR COOLANT REACTOR COOLANT STEAM GENERATOR Component Function STEAM GENERATOR NARROW RANGE LEVEL TRANSMITTERS PRESSURIZER PRESSURE TRANS-MITTERS NARROW RANGE LEVEL TRANSMITTERS MAIN STEAM FLOW CONTROLLERS WIDE RANGE PRESSURE TRANS-MITTERS PRESSURIZER LEVEL TRANSMITTERS STEAN GENERATOR NARROW RANGE LEVEL TRANSMITTERS Plant Equipment No.BLP-110, 111, 112, 120, 121, 122, 130, 131, 132, 140, 141, 142 NPP-151, 152, 153 NPS-153 BLP-110, ill, 112;120, 121, 122, 130, 131, 132, 140, 141, 142 MFC-110, ill, 120, 121, 130, 131, 140%141 NPS-121,.122 NLP-151, 152, 153 BLP-110, 111, 112, 120, 121, 122, 130, 131, 132, 140, 141, 142 Manufacturer ITT BARTON ITT BARTON ITT BARTON ITT BARTON ITT BARTON ITT BARTON ITT BARTON Model or T e 764 763 764 764 763 764 764*See attached 1)st for key page>>Or Ig KEY TO APPENDIX B NOMENCLATURE UNDER THE SYSTEM S HEADING ALL The rationale for saying"All" under the system head-ing column is as follows: 1.Containment Electrical Penetrations serve all elec-trical equipment inside the containment.
2.Cable and cable terminations of different manufac-turers and types listed have been used to serve the various safety related equipment inside the reactor containment, subject to the cables and the cable terminations being qualified for operation in a post-accident containment environment.
SI Intermediate and low head safety injection RHR Residual heat removal, used as low'head safety injection Page 18 of 18