Pages that link to "05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed"
Jump to navigation
Jump to search
The following pages link to 05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed:
Displayed 50 items.
- 05000336/LER-1997-011, Forwards LER 97-011-00,documenting Event Occurred at Unit 2 on 970402.Commitments Made within Ltr Listed (← links)
- 05000423/LER-1997-006, Forwards LER 97-006-01 Per 10CFR50.73(a)(2)(i).Util Commitments in Response to 970117 Event Contained within Attachment 1 (← links)
- 05000423/LER-1997-026, Forwards LER 97-026-00,documenting Condition That Occurred on 970325.Util Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000245/LER-1997-004, Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr (← links)
- 05000245/LER-1997-005, Forwards LER 97-005-01,documenting Closure of Commitment B16236-2 & B16236-3,including Commitments Made within Ltr (← links)
- 05000245/LER-1997-016, Forwards LER 97-016-00,which Documents an Event That Occurred at Mnps,Unit 1 on 970401.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1997-019, Forwards LER 97-019-00 Which Documents Event That Occurred at Mnps,Unit 1 on 970326.Commitments Made within Ltr, Submitted (← links)
- 05000245/LER-1997-015, Forwards LER 97-015-00,documenting Event at Plant on 970321 & Licensee Commitments (← links)
- 05000245/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed (← links)
- 05000336/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred on 970108,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr,Listed (← links)
- ML20134J880 (redirect page) (← links)
- ML20134J881 (← links)
- 05000245/LER-1997-001 (redirect page) (← links)
- 05000245/LER-1996-063, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted (← links)
- 05000245/LER-1997-003, Forwards LER 97-003-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970306,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-017, Submits List of Commitments Re LER 97-017-00 Re Event on 970222 (← links)
- 05000245/LER-1997-021, Forwards LER 97-021-00,documenting Event Occurred at Unit 1 on 970228.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1997-020, Forwards LER 97-020-00,documenting Event Occurred at Unit 1 on 970227.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1997-018, Forwards LER 97-018-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970224.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-011, Forwards LER 97-011-00,documenting Event Occurred at Unit 1 on 970214.Commitment Made within Ltr Submitted as Listed (← links)
- 05000245/LER-1997-010, Forwards LER 97-010-00,documenting Event Occurred at Unit 1 on 970214.Commitments Made within Ltr Submitted as Listed (← links)
- 05000245/LER-1996-020, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated (← links)
- 05000245/LER-1997-009, Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-012, Provides List of Commitments Made Re LER 97-012-00 (← links)
- 05000245/LER-1996-037, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) (← links)
- 05000245/LER-1997-025, Forwards LER 97-025-00,documenting Event Occurred at Unit 1 on 970424.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1979-036, Forwards LER 79-036/03L-0 (← links)
- 05000245/LER-1978-021, Forwards LER 78-021/03L-0 (← links)
- 05000245/LER-1997-013, Forwards LER 97-013-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-028, Forwards LER 97-028-00 Which Documents an Event That Occurred on 970424.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-027, Forwards LER 97-027-00 Per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr (← links)
- 05000245/LER-1996-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr (← links)
- 05000245/LER-1997-026, Forwards LER 97-026-00 Per 10CFR50.73(a)(2)(ii).Also Includes Commitments Made in Ltr (← links)
- 05000245/LER-1996-054, Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date (← links)
- 05000245/LER-1997-029, Forwards LER 97-029-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970513.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-024, Forwards LER 97-024-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970409.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-046, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed (← links)
- 05000245/LER-1997-006, Forwards LER 97-006-00,documenting Condition That Was Discovered at Millstone Nuclear Station,Unit 1 on 970131, Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed (← links)
- 05000245/LER-1997-007, Forwards LER 97-007-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970131,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii). Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-008, Forwards LER 97-008-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970203,per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1994-020, Forwards LER 94-020-01 Which Documents Event That Occurred on 940527,per 10CFR50.73(a)(2)(ii).Commitments,listed (← links)
- 05000245/LER-1997-004, Forwards LER 97-004-01,documenting Closure of Commitment B16213-1.Includes Commitments Made within This Ltr (← links)
- 05000245/LER-1997-005, Forwards LER 97-005-01,documenting Closure of Commitment B16236-2 & B16236-3,including Commitments Made within Ltr (← links)
- 05000245/LER-1997-016, Forwards LER 97-016-00,which Documents an Event That Occurred at Mnps,Unit 1 on 970401.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1997-019, Forwards LER 97-019-00 Which Documents Event That Occurred at Mnps,Unit 1 on 970326.Commitments Made within Ltr, Submitted (← links)
- 05000245/LER-1997-015, Forwards LER 97-015-00,documenting Event at Plant on 970321 & Licensee Commitments (← links)
- 05000245/LER-1996-055, Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted (← links)
- 05000245/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed (← links)
- 05000245/LER-1997-001, Forwards LER 97-001-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970110.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement (← links)
- 05000245/LER-1996-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-049, Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed (← links)
- 05000245/LER-1996-003, Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted (← links)
- 05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted (← links)
- 05000245/LER-1996-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident (← links)
- 05000245/LER-1996-060, Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed (← links)
- 05000245/LER-1996-061, Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode (← links)
- 05000245/LER-1995-008, Forwards Supplemental LER 95-008-02 Which Documents Event That Occurred at Plant on 950411,per 10CFR50.73(a)(2)(ii). Commitment Made within Ltr,Submitted (← links)
- 05000245/LER-1996-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed (← links)
- 05000245/LER-1996-051, Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis (← links)
- 05000245/LER-1996-031, Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16 (← links)
- 05000245/LER-1996-059, Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements (← links)
- 05000245/LER-1996-057, Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 961230 (← links)
- 05000245/LER-1997-023, Forwards LER 97-023-00 Per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Submitted (← links)
- 05000245/LER-1997-039, Forwards LER 97-039-00,documenting Event That Occurred at Facility on 971031.Commitments Made by Util Listed (← links)
- 05000245/LER-1997-038, Forwards LER 97-038-00,documenting Event That Occurred at Plant,Unit 1 on 971008,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr Submitted (← links)
- 05000245/LER-1998-001, Forwards LER 98-001-00,re Event Which Occurred on 980109 at Millstone Unit 1.Commitments Made within Ltr,Encl (← links)
- 05000245/LER-1997-040, Forwards LER 97-040-00,documenting an Event That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 971103.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1993-011, Responds to NRC 981002 Request to Counsel That NNECO Waive Any Assertion of Statue of Limitations for 60-90 Days with Respect to NRC Ability to Initiate Civil Penalty Action Based on Apparent Violation of 10CFR50.59 Re LER 93-0 (← links)
- 05000245/LER-1997-037, Forwards LER 97-037-00,documenting Event Which Occurred on 970930 at Millstone Nuclear Power Station,Unit 1.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-022, Forwards LER 97-022-01,documenting Event That Occurred at Unit 1 on 971001.Commitments Made within Ltr,Listed.All Other Statements Made within Ltr for Info Only (← links)
- 05000245/LER-1996-023, Forwards LER 96-023-01,documenting Condition Discovered at Millstone,Unit 1 on 960306.Attachment 1 Contains Commitments Made within Ltr (← links)
- 05000245/LER-1998-005, Forwards LER 98-005-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 980330.LER Being Submitted Per 10CFR50.73(a)(2)(ii).Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-014, Forwards Suppl LER 97-014-02,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970217.Rept Includes Addl Deficiencies in IST Program That Have Been Identified as Reportable (← links)
- 05000245/LER-1997-031, Forwards LER 97-031-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970730.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1997-036, Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1996-066, Forwards LER 96-066-00 Documenting Event That Occurred at Unit 1 on 960326.Ltr Contains Commitments (← links)
- 05000245/LER-1998-002, Forwards LER 98-002-00,documenting Condition That Was Discovered at Millstone,Unit 1 on 980211.Util Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-033, Forwards LER 97-033-00,documenting Event That Occurred at Unit 1 on 970801.Commitment Listed (← links)
- 05000245/LER-1997-032, Forwards LER 97-032-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970731,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1996-039, Forwards LER 96-039-02 Re IST of Valves Not Being Performed IAW Program & ASME Code Requirements.Suppl of Completion of Commitments Provided (← links)
- 05000245/LER-1998-004, Forwards LER 98-004-00,documenting Condition That Was Discovered at Unit 1 on 980311.Util Commitments Made within Rept,Encl (← links)
- 05000245/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided (← links)
- 05000245/LER-1995-033, Forwards LER 95-033-02,documenting Event That Occurred at Unit 1 on 950623.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-034, Forwards LER 97-034-00 Documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970812.Listed Commitments Made within Ltr (← links)
- 05000245/LER-1997-030, Forwards LER 97-030-00,documenting Event That Occurred at Unit 1 on 970724.Util Commitments Made within Ltr Listed (← links)
- 05000245/LER-1996-035, Forwards LER 96-035-02,documenting Event That Occurred on 960506.Rept Provides Results of Metallurgical Sample from Gamma Plug Per Commitment B15744-3 to Determine Cause of Cracks Found in Gamma Access Port Plug (← links)
- 05000245/LER-1982-014, Forwards LER 82-014/03L-0.Detailed Event Analysis Encl (← links)
- 05000245/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis Encl (← links)
- 05000245/LER-1982-013, Forwards LER 82-013/03L-0.Detailed Event Analysis Encl (← links)
- 05000245/LER-1993-006, Forwards Updated LER 93-006-01 Which Was Previously Submitted W/O Rev Bars (← links)
- 05000245/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl (← links)
- 05000423/LER-1997-002, Forwards LER 97-002-00 Re Torquing of Battery Connections Not Performed as Part of Connection Tightness Checks. Util Commitments in Response to Events Contained within Attachment 1 to Ltr (← links)
- 05000423/LER-1997-001, Submits Commitments Re LER 97-001-00,documenting Condition Determined at Plant on 970104 (← links)
- 05000423/LER-1997-021, Provides Clarification of Actions Taken in Completing Commitment Previously Submitted in LER 97-021-00, Defective Design of RSS Expansion Joint Tie Rod Assembly (← links)
- 05000423/LER-1997-030, Provides Revised Schedule for Submittal of LAR as Identified in LER 97-030-00.LAR Was Previously Scheduled to Be Submitted on 970801 & Is Currently Scheduled to Be Submitted by 970831.W/revised Commitments (← links)
- 05000336/LER-1997-025, Forwards LER 97-025-00 Which Documents Event That Occurred at Mnps,Unit 2 on 910828.Submittal Delayed Due to Inadequate Review of Event at Time of Discovery.Commitments Made by Util,Listed (← links)
- 05000423/LER-1997-039, Forwards LER 97-039-00,documenting Condition Determined at Millstone Unit 3 on 970614.List of Commitments Provided (← links)
- 05000423/LER-1997-038, Forwards LER 97-038-00,documenting Condition Determined at Mnps,Unit 3 on 970613.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-023, Forwards LER 97-023-00 Per 10CFR50.73(a)(2)(iv).Commitments Made by Util,Submitted (← links)
- 05000423/LER-1997-053, Forwards LER 97-053-00,documenting Condition That Was Determined Reportable at Millstone Unit 3 on 971024. Attachment to Ltr Contains Commitments in Response to Event (← links)
- 05000423/LER-1997-009, Forwards Suppl 01 to LER 97-009-00,documenting Addl Conditions to Those Determined Reportable at Millstone Unit 3 on 970123.Commitments Made within Ltr Are Listed in LER 97-009-01.W/o Encl (← links)
- 05000245/LER-1997-039, Forwards LER 97-039-00,documenting Event That Occurred at Facility on 971031.Commitments Made by Util Listed (← links)
- 05000336/LER-1997-034, Forwards LER 97-034-00 Which Documents Condition That Was Identified at Mnps,Units 2 on 971029.Commitments Made within Ltr Listed (← links)
- 05000423/LER-1997-050, Forwards LER 97-050-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971017,per 10CFR50.73 (a)(2)(ii)(B).Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000336/LER-1997-024, Forwards LER 97-024-01,documenting Condition Discovered at Mnps,Unit 2 on 970619.Suppl Provides Update on Analyses & Investigation of Condition.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-052, Forwards LER-97-052-00 Which Documents Event That Occurred at Millstone,Unit 3 on 971014.Commitments Made within Ltr, Encl (← links)
- 05000423/LER-1997-051, Forwards LER 97-051-00,documenting Event That Occurred at Plant,Unit 3 on 971007,per 10CFR50.73(a)(2)(ii)(B). Commitments Made within Ltr Submitted (← links)
- 05000245/LER-1997-038, Forwards LER 97-038-00,documenting Event That Occurred at Plant,Unit 1 on 971008,per 10CFR50.73(a)(2)(ii).Commitments Made within Ltr Submitted (← links)
- 05000423/LER-1997-061, Forwards LER 97-061-00,documenting Condition Determined Reportable at Millstone,Unit 3,on 971218.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-059, Forwards LER 97-059-00 Which Documents Condition That Was Determined Reportable at Millstone Unit 3 on 971125,per 10CFR50.73(a)(2)(ii)(B).Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1997-037, Forwards LER 97-037-00,documenting Event That Occurred at Mnps,Unit 2,on 971126.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-058, Forwards LER 97-058-00 Which Documents Condition That Was Determined Reportable at Mnps,Unit 3 on 971122,per 10CFR50.73(a)(2)(i)(B).Commitments Made in Response to Event Also Encl (← links)
- 05000423/LER-1997-057, Forwards LER 97-057-00 Which Documents Condition That Was Determined Reportable at Unit 3 on 971118,per 10CFR50.73(a)(2)(i)(B).Commitments in Response to Event Contained within Attachment 1 (← links)
- 05000336/LER-1997-036, Forwards LER 97-036-00,which Describes Event That Occurred at Facility on 971117.Commitments Made within Ltr Listed (← links)
- 05000423/LER-1997-036, Forwards LER 97-036-01 Which Documents Conditions That Was Determined Reportable at Facility on 970605,per 10CFR50.73(a)(2)(i)(B) & 10CFR50.73(a)(2)(ii)(B).Commitments in Response to Event Also Encl (← links)
- 05000336/LER-1997-035, Forwards LER 97-035-00,documenting Event That Occurred at Millstone,Unit 2 on 971111.Listed Commitments Made within Ltr (← links)
- 05000423/LER-1997-027, Provides Revised Completion Date for Commitment Submitted within LER 97-027-00 Re Corrective Action Not Met for Trending Valve Leakage.Revised Completion Date Is 970501 (← links)
- 05000423/LER-1997-055, Forwards LER 97-055-00,documenting Condition Determined Reportable at Mnps,Unit 3 on 971105.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-056, Forwards LER 97-056-00,documenting Condition That Was Determined Reportable on 971107,per 10CFR50.73(a)(2)(ii)(B). Attachment 1 Contains Commitments Made in Ltr (← links)
- 05000336/LER-1997-009, Forwards LER 97-009-01,documenting Condition Discovered at Mnps,Unit 2 on 970325.Suppl Provides Update on Analysis for Condition,Including Identification of Addl Deficiencies. Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-062, Forwards LER 97-062-01,documenting Condition Determined Reportable at Millstone,Unit 2 on 971219.Commitments Made by Util,Encl (← links)
- 05000245/LER-1997-040, Forwards LER 97-040-00,documenting an Event That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 971103.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1997-037, Forwards LER 97-037-00 Which Documents Condition Identified at Millstone,Unit 3 on 970516.Condition Later Determined Reportable on 970624.Commitments Made by Util,Encl (← links)
- 05000423/LER-1997-019, Provides Revised Completion Date for Commitment Submitted in LER 97-019-00 Re Failure to Account for Instrument Uncertainty in DWST Level.Commitment Made by Util,Encl (← links)
- 05000423/LER-1997-020, Forwards Revised Schedule for Reconfiguring CCW Side of Containment Air Recirculation Sys to Provide Required Flowrates When Supplied by Reactor Plant Chilled Water Sys or Reactor Plant Ccws,Identified in LER 97-020-00 (← links)
- 05000245/LER-1997-037, Forwards LER 97-037-00,documenting Event Which Occurred on 970930 at Millstone Nuclear Power Station,Unit 1.Commitments Made within Ltr,Listed (← links)
- 05000245/LER-1997-022, Forwards LER 97-022-01,documenting Event That Occurred at Unit 1 on 971001.Commitments Made within Ltr,Listed.All Other Statements Made within Ltr for Info Only (← links)
- 05000336/LER-1997-032, Forwards LER 97-032-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970922.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1997-031, Forwards LER 97-031-00 Which Documents Event That Occurred at Mnps,Unit 2 on 970918.Commitments Made within Ltr Listed (← links)