05000245/LER-1997-022, Forwards LER 97-022-01,documenting Event That Occurred at Unit 1 on 971001.Commitments Made within Ltr,Listed.All Other Statements Made within Ltr for Info Only

From kanterella
Jump to navigation Jump to search
Forwards LER 97-022-01,documenting Event That Occurred at Unit 1 on 971001.Commitments Made within Ltr,Listed.All Other Statements Made within Ltr for Info Only
ML20212D408
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/29/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212D412 List:
References
B16791, NUDOCS 9710310089
Download: ML20212D408 (1)


LER-2097-022, Forwards LER 97-022-01,documenting Event That Occurred at Unit 1 on 971001.Commitments Made within Ltr,Listed.All Other Statements Made within Ltr for Info Only
Event date:
Report date:
2452097022R00 - NRC Website

text

- .. _,. - - .- . ~ . .

b .

g Rope Ferry Rd. (Route 156), Wtterford, Cr O'3as helearEnergy ' M& tone Nudear Power Station Cm ...

Northeast Nudear Energy Company -

P.O. Bos 128

_g -

Waterford, CT 063a5-0128 (860) 447-1791 Fax (860) 444-4277

%eN ti em P Docket No. 50-245 m ,

B16791 f, Re: 10CFR50.73(a)(2)(i)

. U.S. Nuclear Regulatory Commission -

1 Document Control Desk

Washingt_on;DC 20555 -

~

This letter forwards the supplemented Licensee Event Report (LER) 97-022-01, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on October 1,1997. This

' LER is submitted pursuant to .10CFR50.73(a)(2)(i).

TThis supplemental report documents additional deficiencies for the Inservice Inspection (ISI) program identifbd during the system by system review to assure that all required piping and their

component supporta are included in the ASME Section XI program.
The following is Northeast Nuclear Energy Company's (NNECO.'s) commitment made within this u

o letter for Unit 1. ~ All other statements made within this letter are for information only.

4 . B16791-1 NNECO commits to schedule all Class 2 nozzles into the ISI Program and will perform the 'necessary number of examinations to bring the ISI Program back into 9' 1 compliance for the second period (50-67% of the total population). This will be

? completed prior to startup for operating Cycle 16.

n Very truly yours,

- NORTHEAST NUCLEAR ENERGY COMPANY b ,

Ox P. IMIinnenkamp V 000000 ,

Director, Unit Operations t

e Attaclanenti LER 97-022-01 cc: Dr. W. D. Travers, Director, Special Projects Office