05000245/LER-1997-026, Forwards LER 97-026-00 Per 10CFR50.73(a)(2)(ii).Also Includes Commitments Made in Ltr

From kanterella
Jump to navigation Jump to search
Forwards LER 97-026-00 Per 10CFR50.73(a)(2)(ii).Also Includes Commitments Made in Ltr
ML20141G146
Person / Time
Site: Millstone Dominion icon.png
Issue date: 05/14/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141G150 List:
References
B16444, NUDOCS 9705220178
Download: ML20141G146 (2)


LER-2097-026, Forwards LER 97-026-00 Per 10CFR50.73(a)(2)(ii).Also Includes Commitments Made in Ltr
Event date:
Report date:
2452097026R00 - NRC Website

text

,

r l

? -

i Northeast M&ione OUuw

  • Hoge Fnn HL 4 ainfont Ur ggi Utilities System n o n ,s n8 4 aterfonL Cr OM3's-Ol28
8t@ 44'- 1741 May 14,1997 Docket No. 50-245 B16444 Re
10CFR50.73(a)(2)(ii)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-026-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on April 14, 1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B16444-1 NNECO commits to perform an above waterline survey of the Torus to establish the present condition of the coating systems as applied based on sampling and testing to enable their precise or generic identification. The survey will determine the identity, thickness, and condition of coatings within the Torus. The results of the survey will ,

be used to determine the need for additional surveys and how much of the existing  !

coatings can be qualified to adhere to the Torus during a postulated loss of coolant I accident event prior to startup for opecting cycle 16.

B16444-2 NNECO commits to evaluate the need for a hydrodynamic transport analysis which would determine the affect of delamination of coatings within the Torus on Engineered Core Cooling System's (ECCS) recirculation flows prior to startup for operating cycle 16.

B 16444-3 NNECO commits that the results of the survey and the potential hydrodynamic transport analysis will be evaluated and, if required, sections of the Torus will be recoated prior to startup for operating cycle 16.

B 16444-4 NNECO commits that the cause of this condition and any additional corrective  !

actions will be included in a supplement to this report prior to startup for operating cycle 16. l

-,g7 9705220178 970514 #

PDR ADOCK 05000245 I S PDR I

lI!!!!$!!!Il! !!,!!!!

. .. . . . _ . - . . . . . . . . . - . . _ - . . - . _ . . . . . . . - . . _ - . . - ~ . . - . ~ . - . ~ .

s

? .

~

U.S. Nuclear Regulatory Commission B16444\Page 2 0f 2

  • i I

Very truly yours,  !

NORTHEAST NUCLEAR ENERGY COMPANY I i

1 C A
P. D. Hinnenkamp V l
Director, Unit Operations 1

Attachment:

LER 97-026-00

) I cc; Dr. W. D. Travers, Director, Special Projects

, H. J. Miller, Region I Administrator

- S. Dembek, NRC Project Manager, Millstone Unit No. I
T. A. Eastick, Senior Resident Inspector, Millstone Unit No 1

(.