05000245/LER-1997-040, Forwards LER 97-040-00,documenting an Event That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 971103.Commitments Made within Ltr,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 97-040-00,documenting an Event That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 971103.Commitments Made within Ltr,Listed
ML20202D534
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/03/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20202D538 List:
References
B16855, NUDOCS 9712050047
Download: ML20202D534 (1)


LER-2097-040, Forwards LER 97-040-00,documenting an Event That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 971103.Commitments Made within Ltr,Listed
Event date:
Report date:
2452097040R00 - NRC Website

text

___ .. _ .. .

. u).

t Nortlwast y NuclearEnergy

'toi, rerry ita. (itout, is6), v.ierfora, er o6383 mion, Nocu., is,,,,, si,$,o Nonhcast Nuclear r.ncigy Corugany P.O. Dos 128 Waterford, Cr 06383 0128 (860) 447 1791 ras (860) 444 4277

  • lle Lrdicant 116huce Spten.

DEC - 3 !n17 Dnsket No. 50 245 B16855 Re: 10CFR50.73(a)(2)(i) i U.S. Nuclear Regulatory Commission Attention: Document Control Desk l Washington, DC 20555 This letter fonvards Licensee Event Report (LER) 97-040-00, documenting a condition that was discovered at hiillstone Nuclear Power Station, Unit No.1 on November 3,1997 and a condition that was discovered on November 5,1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(i).

The following is Northeast Nuclear Energy Company's (NNECO's) commitment made within this letter. All other statements made within this letter are for information only.

B16855 1 NNECO commits that the specific surveillance procedures for the Rod Block hionitor, and the Isolation Condenser Steam Line liigh Flow and Condensate Line liigh Flow Indicators will be revised to incorporate the Instrument Check as specified in the Technical Specifications and implemented prior to startup for operating cycle 16.

Very truly yours, NORTHEAST NUCLEAR ENERGY COh1PANY

)

Il q QowpV3No .

, ' )<2, g 9712050047 971203 P. D. llinnenkamp U lr ADOCK 050 25 Director, Unit Operations QDR

Attachment:

LER 97-040-00 cc: 11. J. hiiller, Region 1 Administrator bf hhbllk hlllll T. A. Easlick, Senior Resident Inspector, hiillstone Unit No.1 S. Dembek, NRC Project hianager, hiillstone Unit No.1 osu2n uv. ne g3gg}

, _