Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided
ML20211E833
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/25/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211E838 List:
References
B16730, NUDOCS 9709300283
Download: ML20211E833 (2)


LER-2097-035, Forwards LER 97-035-00,documenting Event That Occurred on 970826.Commitments Provided
Event date:
Report date:
2452097035R00 - NRC Website

text

-__ . ._----

1 Northeast Rge Fmy Rd (Rom 1% Tmdor& CM383

$ NuclearEnergy natuooe Noci ,e m ,si.uon Northead Nuclear Fargy Comley P.o. Box 128 Tatedord, CT 06385-0128 (203) 447 1791 Faz (203) 444 4277

'Ibe No,theast Udhuca System SEP 2 51997 Docket No. 50 245 B16730 Re: 10CFR50.73(a)(2)(i) l U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-035-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on August 26,1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(i).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B16730-1 NNECO commits to perform a review to determine if the containment spray interlock should be controlled in the plant Technical Specifications prior to startup for operating cycle 16.

B16730-2 NNECO commits that depending on the outcome of that review, a Technical Specification change will be submitted to either remove the interlock or ensure that it conforms to the plant design basis prior to startup for operating cycle 16. {I l

Very truly yours, p

' rv NORTHEAST NUCLEAR ENERGY COMPANY P. D. Hinnenkamp M Director, Unit Operations 9709300283 970925 PDR ADOCK 05000245 S PDR; Ot04224 REV.1-94 * * *a h*

, . 9

.U.S. Nuclear Regulatory Commission B16730\Page 2 of 2

Attachment:

LER 97-035-00 cc: H. J. Miller, Region I Administrator T. A. Eastick, Senior Resident inspector, Millstone Unit No.1 S. Dembek, NRC Project Manager, Millstone Unit No. I