Forwards LER 95-033-02,documenting Event That Occurred at Unit 1 on 950623.Commitments Made within Ltr,Listed
ML20211E639
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/25/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211E646 List:
References
B16638, NUDOCS 9709300174
Download: ML20211E639 (2)


LER-2095-033, Forwards LER 95-033-02,documenting Event That Occurred at Unit 1 on 950623.Commitments Made within Ltr,Listed
Event date:
Report date:
2452095033R00 - NRC Website

text

_ _ . - . - - . - - _

W Rope Ferry Rd, (Route 156),Caterfed, Cr O(Jut 5 Nuclear FaerNy m.ioi.e Naar P .e, siauari l Nortlwast Nwlear Energy Coisynny P o. Bus 128

.

  • Taterford, Ur Msas 0128 (860) 447 1791 Fa4 (n60) 444 4277 Tiw Norti,ca : Utilides Syeiein SEP 2 51997 Dacket No. 50-241 II.lMlB Re: 10CFR50.73(a)(2)(ii)

- U S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 This letter forwards a supplemental Licensee Event Report (LER) 95 033 02 documenting an event that occurred at Millstone Nuclear Power Station, Unit No. I on June 23,1995. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

This supplement documents three additional electrical separation conditions found during the continuing review process for this issue. The corrective actions for these conditions are included in the activities identined for this issue.

The following are NNECO's commitments made within this letter, All other statements made within this letter are for information only.

1116638 1 NNECO commits to evaluate deviations identified in the condition report to determine which of the following corrective actions should be pursued 1) performed analysis to credit the 112/02 monitor sample lines as a close loop system thereby requiring only one Containment isolation valve per sample line or 2) separate the logic wiring for the Inboard and Outboard Drywell Atmosphere Sampling System Primary Containment Isolation valves prior to startup for operating Cycle 16. f 1

1116638 2 NNECO commits to include a modification to correct this problem in a Design Change Request (DCR) for the synchronizing switch 25/301 prior to startup for operating Cycle 16 3)

-1116638-3 NNECO commits to include a modification to correct this problem in a DCR for the tie breaker for Ilusses 12E and 12F control interlocks prior to startup for operating Cycle 16, 9709300174 970925 PDR ADOCK 05000245 g PDR

- - . . . - . - - . .. - .- - .-=- . . . - _ _ __ _ . - -.-_. . -.- . ... . . -,

t i

I U .S. Nuclear Regulatory Commission

[

. til6638\Page 2 of 2 i

?

t P

Very truly yours, i NORTilEAST NUCLEAR ENERGY COMPANY .

i

&s a - - _

I 1 s' N .

f 1

P.D. Ilinnenkamp j Director, Unit Operations

. i

=

Attachment:

LER 95 033-02 .  ;

cc: IL J, Miller, Region 1 Administrator T. A. Easlick, Senior Resident inspector, Millstone Unit No.1

- S. Dembek, NRC Project Manager, Millstone Unit No,1 ,

-W. D. Travers, PhD, Director, Special Projects l l.

[

f I

i  ;

i h

I

.I i

I l-l i

j.

gy-tr y rgyer g. ='F a.T '4* L'-M1T'f$ -fWr%- ue adX Sf**7-ernyeq-ppie--'