05000245/LER-1997-002, Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed
ML20134M204
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/13/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES SERVICE CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20134M207 List:
References
B16165, NUDOCS 9702200142
Download: ML20134M204 (1)


LER-2097-002, Forwards LER 97-002-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 970114,per 10CFR50.73(a)(2)(iv). Commitments Made,Listed
Event date:
Report date:
2452097002R00 - NRC Website

text

-

Y'i Northeast Hope Fury Hi (H<>ute 1"x>h WatedonW 06335

////$Y 'NuclearEnergy u,,one Noci,ar em, si.o.,o Nrihea t Nuclear Energy Company P.O. Ikix 128 Waterfoni, CT 06385-0128 (860) 447-1791 Fax (860) 444-4277 1

The Northeast Utihties System February 13,1997 Docket No. 50-245 B16165 Re: 10CFR50.73(a)(2)(iv)

U.S. Nuclear Regulatory Commission Document Control Desk ,

Washington, DC 20555 This letter forwards Licensee Event Report (LER) 97-002-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on January 14, 1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(iv).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only. I B16165-1 NNECO commits that the immediate corrective action, to require two separate reviews of the clearance (tagout) procedure prior to release, will be permanently 4 incorporated through a revision to the clearance (tagout) procedure and process prior to startup for operating Cycle 16.

B16165-2 NNECO commits to provide additional training in electrical schematic print reading to the licensed personnel prior to startup for operating Cycle 16. I i

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l

I DR D 05 0 45 P. D. HinnenkamF U I S PDR Director, Unit Operations I

Attachment:

LER 97-002-00 gf !

cc: Dr. W. D. Travers, Director, Special Projects H. J. Miller, Region I Administrator S. Dembek, NRC Project Manager, Millstone Unit No. I 190020 T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 (Mi3422 5 ILEY.12M