05000245/LER-1997-009, Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed

From kanterella
Jump to navigation Jump to search
Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed
ML20136H253
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/14/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20136H257 List:
References
B16277, NUDOCS 9703190098
Download: ML20136H253 (1)


LER-2097-009, Forwards LER 97-009-00,documenting Condition That Was Discovered at Millstone Nuclear Power Station,Unit 1 on 970212.Util Commitments Made within Ltr,Listed
Event date:
Report date:
2452097009R00 - NRC Website

text

_ . . ___m . _ . . _ . _ _ . . _ _ . . - . _ _ . . . . . . . . . _ . . . . , _ . . _ __ _._ _ _. _ _ . . ~ . _ _ . _ . _ ..____ _ .~.. ._.

. Northeast hone officesa Hope Ferry Rd., Waterford, Cr i Utilities System P.o. w 128 Waterford, CF 06385-0128 (860) 447-179I l March 14,1997 l Docket No. 50-245  :

B16277 Re: 10CFR50.73(a)(2)(ii) [

t U.S. Nuclear Regulatory Commission l

Document Control Desk  ;

Washington, DC 20555 This letter forwards Licensee Event Report (LER)- 97-009-00, documenting an event that j occurred at Millstone Nuclear Power Station, Unit No. I on February 12, 1997. This LER is j submitted pursuant to 10CFR50.73(a)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made with.in I this letter. All other statements made within this letter are for information only. 1 B16277-1 NNECO commits to review all calculations that have been completed as part of the  :

Setpoint Verification Program to determine if other non-conservative setpoints exist l by May 1,1997. i i

B16277-2 NNECO will submit a TS change request or perform a new analysis to ensure that  ;

Emergency Core Cooling System and Primary Containment . Isolation System i actuation will occur consistent with the plant's design basis including consideration  ;

ofinstrument uncertainties by April 15,1997.

Very truly yours, i

NORTHEAST NUCLEAR ENERGY COMPANY l l

.}

CChn

-PTTTinnenkamT U

'm J l 19005r,' Director, Unit Operations - 1- 1 i

Attachment:

LER 97-009-00 -

] .21L i l

L cc:. Dr. W. D. Travers, Director, Special Projects l - H. J. Miller, Region I Administrator.

l S. Dembek, NRC Project Manager, Millstone Unit No. l .

1 T. A. Eastick, Senior Resident Inspector, Millstone Unit No.1 t