Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed
ML20217K760
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/27/1997
From: Hinnenkamp P
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217K766 List:
References
B16789, NUDOCS 9710290126
Download: ML20217K760 (2)


LER-2097-036, Forwards LER 97-036-00,which Documents Event That Occurred at Mnps,Unit 1 on 970929.Commitment Made within Ltr,Listed
Event date:
Report date:
2452097036R00 - NRC Website

text

__ . _ - - _ - _

Ndead ""P ' '"7 "d' ("""" ' ')' *;'*"'d' "' **"5 Nuclear Energy Mdistune Nudw Pnet Starkir Northeet Nuclear l'.ncrity Cunipany i"

P.O. Inos 128 Waterford, UT Na85 0128 (860) 447 1791 l'an (IWO) 444-4277 he Northeast Utilitice Byetenu OCT 2 7 'm7 Dmket No. 50 245 B16789 Re: 10CFR50.73(a)(2)(ii)

I U S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 i

This letter forwards Licensee Event Report (LER) 97 036-00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No.1 on September 29,1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B16789 1 NNECO commits to evaluate the shutdown path for the Probable Maximum llurricane event to assess the suitability of existing equipment and procedures prior to restart from the current refueling outage.

B16789 2 NNECO commits to inspect the fire pump house to identify any additional leakage paths into the stmeture prior to rrstart from the current refueling outage.

B16789-3 NNECO commits to develop and implement a plan to address the specific leakaga path identified in this LER prior to restart from the current refueling outage.

j Very tmly yours, NORT11 EAST NUCLEAR ENERGY COMPANY L J 97102{01269710272j5 DOCK 05

. P. D. liinnenkamp V gDR Director, Unit Operations ll11Irl1[lyijll,lliljjj

' 11S. Nuclear Regulatory Commission lil6789\l' age 2 of 2 k

Attachment:

1.ER 97 036 00 cc: 11. J. Miller, Region 1 Administrator T. A. Easlick, Senior Resident inspector, Millstone Unit No. I S. Dembek, NRC Project Manager, Millstone Unit No.1 i

I I

l l

l l

i l

\

l l

(gg hope Ferry Rd. (Houte tfe), Ttterford, Cr 0085

\ / Nudear Energy u , tone N , w po. ,st.oon

'V Northeut Nuclear I:nctFy usugeny l P.0, Bos 128

' Teterford, CT 063fLt012a

. +

(860) 447 1791 Fas (860) 444 4277

'Ihe Northret l'tihties Systern DCT ? 7 '607 Docket No. 50 245 1116789 Re: 10CFR50.73(a)(2)(ii)

U S. Nuclear Regulatory Commission Doeument Control Desk Washington, DC 20555 This letter forwards Licensee Event Report (LER)97-036 00, documenting an event that occurred at Millstone Nuclear Power Station, Unit No. I on September 29,1997. This LER is submitted pursuant to 10CFR50.73(a)(2)(ii).

The following are Northeast Nuclear Energy Company's (NNECO's) commitments made within this letter. All other statements made within this letter are for information only.

B167891 NNECO commits to evaluate the shutdown path for the Probable Maximum ilurricane event to assess the suitability of existing equipment and procedures prior to restart from the current refueling outage.

B16?89 2 NNECO commits to inspect the fire pump house to identify any additional leakage paths into the structure prior to restart from the current refueling outage.

B16789-3 NNECO commits to develop and implement a plan to address the specific leakage path identified in this LER prior to restart from the current refueling outage, Very truly yours, f&b  ;

NORTIIEAST NUCLEAR ENERGY COMPANY N

97 O g 6K097 27 45 P. D. Hinnenkamp V p Director, Unit Operations k$ l$

, fll

  • O.S. Nuclear Regulatory Commission H16789\Page 2 of 2 I'

Attachment:

LER 97 036 00 1

cc: 11. J. Miller, Region 1 Administrator T. A. Eastick, Senior Resident inspector, Millstone Unit No.1

l. S. Dembek, NRC Project Manager, Millstone Unit No.1

. . . . . _